This document is a sole source justification for the procurement of Zumro brand low-pressure inflatable airbeam shelter systems and accessories from Air Shelters USA, LLC. The 673rd Contracting Squadron plans to award a contract valued at an estimated $ amount to acquire 3 Zumro shelters and associated equipment. The justification cites FAR 13.501(a) as the authority for this non-competitive procurement, as Air Shelters USA is the sole manufacturer and there are no equivalent substitutes. The agency has previously purchased Zumro systems from multiple vendors and requires brand consistency to prevent costly replacement of its existing, serviceable inventory and reduce training burdens. While 3 vendors were contacted, only Zumro products will meet requirements due to compatibility with fielded systems. The contracting officer determined the anticipated costs would be fair and reasonable based on publicly available pricing data.

View the file

Other files for this federal contract opportunity

Other files attached to Updated: Low-Pressure Inflatable Airbeam Shelter System with Accessories, newest first.
File Type Posted
Attachment 1 - Pricing Schedule.pdf PDF
Questions and Answers 21 Sep 23.docx DOCX document
Updated - Low-Pressure Inflatable Airbeam Shelter System - Combo.pdf PDF
Attachment 2 - Salient Characteristics.pdf PDF
Attachment 1 Brand Name Justification Air Shelter.pdf PDF
Low-Pressure Inflatable Airbeam Shelter System - Combo.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

CONTROLLED UNCLASSIFIED INFORMATION

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 3March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 3

NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.

Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No

Funding level for this acquisition: >SAT and < $750K > $750K and < $15M

Contracting Activity: 673 CONS/PKB

Purchase Request / Local ID Number: F1W1G23207AW01

Program / Project (and PE, if applicable): Low Pressure Inflatable Airbeam Shelter System

Program Type (PEO or Other Contracting): N/A

Authority: AFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)

AFFARS 5313.501 - 10 U.S.C. 3403, Special Emergency Procurement Authority (41 U.S.C. 1903)

Estimated Contract Cost (including options): $ Justification Type: Class Individual

COORDINATION ( AFFARS 5306.304(a)) Sign and Save Procedure

** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

Date

20 Sep 2023

Contracting Officer TSgt Beau Burton

[ 673 CONS/PKB / 907-552- 3352]

Signature

X

APPROVAL (AFFARS 5306.304(a) )

Date

21 Sep 2023

Chief of the Contracting Office (COCO) Gina J. Parks 673 Contracting Squadron/907-552-2810

Signature

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 3March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 3

I. Contracting Activity.

673 Contracting Squadron

II. Nature and/or description of the action being processed.

This requirement is to purchase tents to bolster the capability of the ACE team. These tents are Zumro Air Shelters are are a brand name requirement in order to prevent duplications of cost and training time for the government.

III. Description of supplies/services required to meet agency needs.

3WG has a requirement for additional Zumro Air Shelters and accessories to increase capability with new shelters and outfit currently owned shelters.

Zumro Air Shelters are commercial off the shelf products that are primarily used by military and first responders for headquarter operations at forward locations. These shelters are not military unique and meet the definition of a commercial product in FAR part 2. Zumro products can be acquired in the commercial market sector using streamlined acquisition procedures under FAR Part 13.

IV. Statutory authority permitting other than full and open competition.

FAR 13.501 (a)

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

Air Shelters USA, LLC is the sole manufacturer of Zumro brand air shelters. There are multiple distributors of Zumro branded air shelters providing competion

3WG owns multiple Zumro tents and accessories purchased on contract action FA500017P0069 for $335,810.62 in 2017 and contract action FA500018P0181 for $163,773.01 in 2018 that are currently serviceable. Purchasing any other Air system would result in substantial duplication costs in replacing currently owned and serviceable systems. In order to prevent a complete overhaul of existing inventory costing the government $900,000+, this requirement must be a brand name Zumro tent as their systems can only interface with each other. The inclusion of non ZUMRO pieces to a ZUMRO configuration can harm the structural integrity of the shelters which pose an undue risk to military personnel.

Additionally, the setup and tear down time and ease of mobility makes this tent an ideal solution during ACE exercises in the Arctic and throughout the Pacific. Finally, purchasing a new system the government would incur substantial costs to retrofit the stock and would also impact readiness as a new training system would need to be developed to operate any new systems.

IAW FAR 13.501(a)(i) this requirement is a Brand Name and will be posted with the solicitation and subsequent award.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

Market research identified three vendors that are capable of providing Zumro Shelters. The three vendors were contacted and all expressed interest in providing a quote. Two of the three vendors have previously been awarded contracts for Zumro Air Shelters and accessories. The third vendor has multiple contracts awarded for NAICS 314910

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 3March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 3 and PCS Code 5410 and has expressed interest in providing a quotation for the required shelters.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

Zumor Air shelters are widely utilized by military and federal and state agencies. As a result, multiple pricing catalogs are publicly available and pricing data is widely available. Additionally, Zumro products are available on GSA Advantage providing another resource to determine if the price is fair and reasonable.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

Research was conducted via GSA Advantage! and FPDS-NG identifying vendors that could provide the required product and meet the specifications required. Additionally, the customer provided current quotation from Air Shelters USA, LLC providing an additional source to increase competition.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

X. List of any sources that expressed, in writing, an interest in the acquisition.

Air Shelters USA, LLC Native Instinct, LLC

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

Future tent/air shelter systems would need to be restricted to ZUMRO until there are efforts made within industry to produce items that are compatible with multiple brands of shelters without compromising structural integrity of existing shelters. As the need and requirement evolves it is the hopes that new systems/parts can be purchased that would be safe to be incorporated into our system.

XII. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

XIII. Certification by the technical/requirements personnel.

As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.

Remove the Guidance pages below.

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items March 2023 Page of International Agreement Competitive Restrictions (IACR) March 2023 Page of NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.

Is this a new or amended J&A Document?

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?

Funding level for this acquisition:

Authority:

Justification Type:

COORDINATION ( AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.

(See "Specific Guidance for Completing this Template" below.)

I. Contracting Activity.

II. Nature and/or description of the action being processed.

III. Description of supplies/services required to meet agency needs.

IV. Statutory authority permitting other than full and open competition.

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

X. List of any sources that expressed, in writing, an interest in the acquisition.

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

XII. Certification by the Contracting Officer.

XIII. Certification by the technical/requirements personnel.

Specific Guidance for Completing this Template

I. Contracting Activity. (FAR 6.303-2(b)(1))

Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.

II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))

State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).

An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.

III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))

Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.

If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.

In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.

For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.

IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5)) Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.

Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 3204) VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

(FAR 6.303-2(b)(6))

Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:

Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.

Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.

Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.

VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))

Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.

VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))

Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.

When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.

If no market research was conducted, so state and provide the rationale.

IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))

Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.

X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))

If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))

Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.

Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.

If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.

For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.

[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))

As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.

XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))

As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.

Do You Need to "REDACT" Text?

This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.

9.0.0.2.20120627.2.874785

security_markings: CONTROLLED UNCLASSIFIED INFORMATION
CurrentPage:
PageCount:
new:
amended-with-original:
Yes:
No:
range_under-700K:
range_700K-13.5M:
Contracting-Activity: 673 CONS/PKB
PR-ID-Number: F1W1G23207AW01
Program-Project: Low Pressure Inflatable Airbeam Shelter System
Program-Type: N/A
class:
individual:
Estimated_Cost:
Sign_and_Save_1:
Date: 20 Sep 2023
Date: 21 Sep 2023
Name:
Signature:
Hide-PM-Coord:
Hide-CO-Coord:
Hide-CSO-Coord:
Hide-Legal-Coord:
Hide-COCO-Coord:
Hide-CA-Coord:
Hide-Blank-1-Coord:
Hide-Blank-2-Coord:
Section-I-Text:
Section-II-Text:
Section-III-Text:
Section-IV-Text:
Section-V-Text:
Section-VI-Text:
Section-VII-Text:
Section-VIII-Text:
Section-IX-Text:
Section-X-Text:
Section-XI-Text:
Section-XII-Text:
Section-XIII-Text:
Remove-Guidance-Pages: 1