Questions and Answers Cranes and Hoists.pdf
PDF 76 KB Posted
- Attached to
- Cranes and Hoists JBER Federal contract opportunity
- Solicitation number
- FA500022Q0050
About this file
This document contains questions and answers regarding a requirement for crane and hoist services on Joint Base Elmendorf Richardson. The contractor will be responsible for the annual inspection, preventive maintenance, load testing, repair, and certification of cranes and hoists across both Fort Richardson and Elmendorf Air Force Base. On Fort Richardson, the contractor will perform all repairs within 24 hours when cranes over 7.5 tons fail load testing to avoid multiple mobilization of weights. However, on Elmendorf Air Force Base, repairs exceeding 24 hours can be expected as the 773rd Civil Engineer Squadron shops will complete repairs and scheduling may impact timelines. The average annual cost of repairs on Fort Richardson based on historical data is $25,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 001 - Attachment 1 - Cranes and Hoists Services PWS 07 July 2022.pdf | ||
| Attachment 6 - Past Performance Questionnaire Final CH.docx | DOCX document | |
| Combo Cranes and Hoists.pdf | ||
| Attachment 1 - Cranes and Hoists Services PWS 16 June 22.pdf | ||
| Attachment 7 - Mission Essential Contract Services.pdf | ||
| Attachment 4 - Section 01500 Environmental Protection on JBER Rev1.pdf | ||
| Attachment 2 - Pricing Worksheet.docx | DOCX document | |
| Attachment 3 - WD 2015-5681 Rev 15 15 Mar 22.pdf | ||
| Attachment 5 - Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cranes and Hoist Industry Questions and Answers
In the event we have to use water bags for load tests, will water, hoses, and drainage will be provided for all cranes 15ton and above?
The only thing provided by the government is a back flow preventer attached to the nearest hydrant.
Per PWS 1.10 “The contractor must utilize its own equipment and weights for all weight load testing.”
Paragraph 1.6 – Services - 1st sentence states that we must perform "repair". How are repairs being funded? At this time we don't know what repairs are needed, therefore costs are unknown for Labor and Parts.
This is a firm fixed price contract and should be bid accordingly.
Historically there have been an average of 10 repair work tasks per year on FT.
Richardson with an average cost of $2,500 per task including parts and labor.
Paragraph 1.12 – Repair - 1st sentence states that "contractor shall ensure cranes and hoists on Ft Richardson are repaired"... If we are responsible for all the repairs, who is performing the repairs. Are all cranes on Ft. Rich currently functioning and no repairs are needed? We just need clarification on that please.
The contractor is responsible for load testing and certification of Cranes and Hoists on Elmendorf AFB (JBER-E) 773 CES will preform repairs on cranes and hoists located on this side of the installation.
The Contractor is responsible for load testing, certification, and repair of Cranes and Hoists on FT. Richardson (JBER-R)
Will cranes over 7.5T, that do not pass the load test be repaired within 24 hours, so demobilization and remobilization of weights won't be necessary?
The repairs on FT Richardson will be completed by the contractor. Repairs within 24 hours are authorized as facility schedule allows.
The repairs on Elmendorf will be completed by 773 CES shops and can be expected to exceed 24 hours.