Atch 04 AF 66_v1.1.pdf

PDF 42 KB Posted

Attached to
FXSB 21-1081 Repair Hangar Tail Door at B10571
Solicitation number
FA500021R0072
Issued by

About this file

This document contains details for a federal construction contract opportunity to repair hangar tail doors at Joint Base Elmendorf-Richardson in Anchorage, Alaska. The 673d Contracting Squadron is seeking proposals to replace tail door rails and guides, replace tail door pulley cables, and maintain or replace existing door equipment. Offerors must provide 100% design, specifications, and construction documents. The work includes all labor, materials, equipment, and supervision to execute the project as shown in the drawings, specifications, and requirements. The estimated price range for the project is between $100,000 and $250,000. Interested parties must register in the System for Award Management to be eligible for award. Proposals are due by August 30, 2021. A site visit is scheduled for August 17, 2021, and the solicitation package will be available through the Electronic Posting System on SAM.gov.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

FXSB 21-1081

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT PREFERENCE, TYPE OF

SUBMITTAL

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E

D R

A W

IN

G

S

P

LA

N

M S

D S

M A

N F'

R R

E C

O M

M E

N D

A

TI

O N

S

R E

Q U

E S

T

LE

TT

E

R

C A

TA

LO

G D

A

TA

R E

P O

R

TS

O

TH

E R

D A

TA

TE

S

T R

E S

U

LT

S

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTIN

G

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE DATE

FOLLOW-UP

DATE CONTRACTOR

NOTIFIED

CONTRACTOR RE-

SUBMITTAL

FINAL APPROVAL REMARKS

Notice of Start of Work 1

10 days prior to start of any work

As-Built Record Drawings 1 30 days after

Work Complete

Utility Outages 1

14 Days prior to outage needed

Form 3 (Dig Permit) 1 After Final

Signature

Quality Control Plan 1

NTP + 20 Days

Material Safety Data Sheet 1

30 days before brought on Base

Fuel Spill Clean Up Plan 1 Prior to work start

Demo Plan 1 14 days after

NTP

Temporary Cover Design 1 14 days after

NTP

Shop Drawings/Material list for rail/guide 1 14 days after

NTP

Repair Hangar Tail Doors at B10571

AF66e.XLS