Atch 04 AF 66.pdf
PDF 65 KB Posted
- Attached to
- FXSB 21-1081 Repair Hangar Tail Door at B10571
- Solicitation number
- FA500021R0072
About this file
This document includes a schedule of materials submittals and a related federal contract opportunity notice. The schedule of materials submittals outlines eight required submittals for a project to repair hangar tail doors at Joint Base Elmendorf-Richardson in Alaska, including notices of work start and utility outages, design drawings, safety data sheets, and spill response plans. The federal contract opportunity is being solicited by the 673d Contracting Squadron of the Department of the Air Force Pacific Air Forces to repair hangar tail doors at the specified base through a design-bid-build approach. Interested parties must submit proposals by August 30, 2021 for the project valued between $100,000 and $250,000 to replace door rails and guides, pulley cables, and maintain equipment. A site visit is scheduled for August 17, 2021, and the solicitation package will be posted on SAM.gov.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
FXSB 21-1081
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
D R
A W
IN
G
S
PL
A
N
M
SD
S
M A
N F'
R R
EC
O
M M
EN
D
A
TI
O N
S
R
EQ
U
ES
T
LE
TT
ER
C A
TA
LO
G D
A
TA
R
EP
O R
TS
O
TH
ER
D
A
TA
TE
ST
R
ES
U
LT
S
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL FINAL APPROVAL REMARKS
Notice of Start of Work 1 10 days prior to start of any work
As-Built Record Drawings 1 30 days after
Work Complete
Utility Outages 1 14 Days prior to outage needed
Form 3 (Dig Permit) 1 After Final
Signature
Quality Control Plan 1 NTP + 20 Days
Material Safety Data Sheet 1 30 days before brought on Base
Fuel Spill Clean Up Plan 1 Prior to work start
8 Design for Door Rails 1 21 days after
NTP
Repair Hangar Tail Doors at B10571