SOW_Fencing_bldg_4917.DOCX
DOCX document 24 KB Posted
- Attached to
- Security Forces Fence JBER
- Solicitation number
- FA500018Q0206
About this file
Military Working Dog SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REVISED_MWD_Fence_Drawings.pdf | ||
| REVISED_MWD_Fence_SOW.pdf | ||
| Drawings.jpg | JPG image | |
| FA500018Q0206.pdf | ||
| Wage_Determination.pdf | ||
| SOW_-_Ship_Creek_Fence(revised).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
673d Civil Engineer Squadron Joint Base Elmendorf-Richardson, AK
15 Aug 2018
STATEMENT OF WORK
Install additional security fence within the interior of existing boundary fence at building 4917 Work Order’s # 34776
PROJECT INFORMATION
1.1 PROJECT LOCATION: Project shall be completed as a routine requirement at building 4917, on Joint Base Elmendorf-Richardson, Alaska. Project hours are standard work hours.
PROJECT DESCRIPTION: Install approximately 250 lineal feet of additional fencing and 3 additional personnel gates matching the same type and style of fence & gates within the boundary of the existing perimeter fence. Also inspect and re-secure approximately 450’ of existing fence that is leaning or may need repair within the area of the facility. This is to allow safer access to training areas and facility’s. See attached drawing for exact location on JBER-E. Fencing will be of the same quality and design as existing fence and gates within the area. Recommend a site visit for all prospective contractors
GENERAL REQUIREMENTS
1.2 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building codes. Contractor shall field verify all measurements, quantities, or value stated by the Government.
1.3 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with the facility manager prior to the start of any operation. The contractor shall dispose of all associated construction debris off base at an approved disposal facility.
1.4 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.
1.5 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government.
1.6 HEALTH/SAFETY: The contractor shall be responsible for compliance with the regulations of the United Sates Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA) and Air Force Occupational and Environmental Safety, Fire Protection and Health Program (AFOSH) Publication. The contractor shall maintain a clean and debris free site at all times. The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances for employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.
1.7 Permits: Contractor will be required to obtain a Base Civil Engineering Work Clearance Request, 673 ABW Form 3 (dig permit) for all areas prior to work beginning. Contractor shall maintain control of all vehicle and foot traffic in and around the work zone at all times. Contractor shall supply and maintain all vehicle and foot traffic control devices, i.e. signage.
1.8 GREEN PROCURMENT: Contractor must incorporate “green procurement” principles into the design of their projects. Specifically, consult the EPA’s web site at www.epa.gov/cpg/products.htm for a listing of the products that have been mandated as green procurement requirements for purchases.
SECTION 2: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS
2.1 General Requirements (Div. 1)
2.1.1. Install approximately 250 lineal feet of additional fencing with 3 additional personnel gates matching the same type and style of fence & gates within the boundary of the existing perimeter fence. Also inspect and re-secure approximately 450’ of existing fence that is leaning or may need repair within the area of the facility. Fencing will be of the same quality and design as existing fence and gates within the area. Recommend a site visit for all prospective contractors
2.1.2. Contractor shall remove all unsuitable materials up to 1’ in depth of the sub base and subgrade in all locations and backfill with approved select materials
2.1.3. Contractor shall protect all newly placed concrete and support posts from damage of any kind to prevent disfigurement during the curing period. Damaged concrete shall be repaired or replaced to Government representative’s satisfaction at no additional cost.
2.1.4. Contractor shall backfill excavated and or disturbed areas with a minimum of 4” top soil, leveled with surrounding area and/or sloped, hydro-seed and fertilize.
2.1.5. Once the project is completed the Contractor shall haul away and dispose of all construction debris from work area to an approved dump site.