FA5000-12-R-0011-0001.pdf

PDF 35 KB Posted

Attached to
Replace Substation 2
Solicitation number
FA5000-12-R-0011
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Attachment 3 - SOW Section 4.4 Drawing.pdf PDF
ES403 SUB STATION 2 SITE PLAN FXSB081405ES403.dwg DWG drawing
ES401 FEEDER 51 ELECTRICAL UTILITIES SITE PLAN FXSB081405ES401.dwg DWG drawing
Tsaec.shx —
Attachment 6 -Specifications.pdf PDF
Questions Answers.pdf PDF
DB Wages 25 May 12.pdf PDF
E601 FEEDER 43 51 52 53 54 ELEC ONE LINE FXSB081405E601.dwg DWG drawing
TITLE SHEET AND LOCATION PLAN FXSB081405GI101.dwg DWG drawing
ES402 ELEC FEEDER 43 SUSTAINMENT SITE PLAN FXSB081405ES402.dwg DWG drawing
UFC 3-600-01 - Fire Protection Engineering.pdf PDF
Substation 2-Overall.pdf PDF
UFC 3-550-01 - Exterior Electrical Power Distribution.pdf PDF
Attachment 2 -Weather.pdf PDF
SCADA As-Builts.pdf PDF
Attachment 4 - JBERELMEAFB-Substat Oneline.pdf PDF
DSC_0720 Pole 54-1.pdf PDF
Substation 2-Switchgear.pdf PDF
Attachment 5 - AF-Form 66.pdf PDF
Solicitation FA5000-12-R-0011.pdf PDF
Attachment 9 - Past Performance Information.pdf PDF
Substation As-Builts.pdf PDF
Attachment 7 - Drawings.pdf PDF
Attachment 3 - SOW Replace Substation 2 - SOW - MASTER - 17 Apr —
ML P Drawings.pdf PDF
Poles 51-1 to End.pdf PDF
Attachment 1 - Wage Determination.pdf PDF
Attachment 6 - Specifications.pdf PDF
JBER Electrical Construction Standards.pdf PDF
Attachment 10 - Requisitioned GFP.pdf PDF
Substation 2-Transformer.pdf PDF
Alter Roadway Interchange.pdf PDF
Attachment 11 - Scheduled GFP.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of the amendment is to:

A. Incorporate the attached revised Davis Bacon Wage Rate Determination dated 25 May 2012.

B. Update Clause 5352.201-9101 OMBUDSMAN dated Aug 2005 to Apr 2010.

C. Replace Attachment 6, Specification with a new formatted copy that includes section page numbers. Also, Section 13090 1.03 E. calls for an automatic transfer switch in the PCR. This item has been removed.

D. Replace Attachment 3, Statement of Work section 4.4 with the new attached page with the Elmendorf Geobase Drawing.

E. Attach the CAD Files.

F. Attach the questions and answers from the site visit.

G. All other terms and conditions remain unchanged and in full effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Jun-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5000-12-R-0011

X 9B. DATED (SEE ITEM 11)

15-May-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Jun-2012

CODE

FA5000 - 673D CONTRACTING SQUADRON

10480 22ND STREET

JBER AK 99506-2501

FA5000 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA5000-12-R-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

5352.201-9101 OMBUDSMAN (APR 2010)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern..

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(cIf resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM or AFISRA ombudsmen, CMSgt Tommie Rogers, 25 E. Street, Suite D-306 JBPH-H, Hi 96853-5427 Tel: (808) 449-8569 Tommie.rogers@hickam.af.mil

Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU or ARISRA level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330- 1060, phone number (703) 588-7004, facsimile number (703) 588-1067.

(d) The ombudsman has no authority to render a decision that binds the agency..

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

The following have been deleted:

5352.201-9101 OMBUDSMAN AUG 2005

(End of Summary of Changes)