ElmendorfMACCSpecs.doc

DOC document 399 KB Posted

Attached to
MACC, Elmendorf AFB, Alaska Federal contract opportunity
Solicitation number
FA5000-10-R-0011
Issued by
Department of the Air Force Pacific Air Forces

About this file

MAC Specifications Attachment 3

View the file

Other files for this federal contract opportunity

Other files attached to MACC, Elmendorf AFB, Alaska, newest first.
File Type Posted
Amendment 2.pdf PDF
CONTRACT STANDARD_As-built.DWG DWG drawing
CONTRACT STANDARD_Design.DWG DWG drawing
E-1.dwg DWG drawing
E-3.dwg DWG drawing
E-8.DWG DWG drawing
A-2.dwg DWG drawing
M-1.DWG DWG drawing
A-1.DWG DWG drawing
E-5.dwg DWG drawing
Elmendorf base theater 1.dwg DWG drawing
E-7.DWG DWG drawing
E-4.dwg DWG drawing
Theater slide show.ppt PPT presentation
E-6.DWG DWG drawing
E-2.dwg DWG drawing
G-1.DWG DWG drawing
WageRate08Oct10.doc DOC document
Amendment 1.pdf PDF
MACC Attch 4 —
MACC Attch7.pdf PDF
MACC Attch4 —
MACC Attch2.pdf PDF
WageRateRes.doc DOC document
Atch9-FINANCIALDATAFORM1.doc DOC document
WageRate24Sep10.doc DOC document
WageRateFairbanksRes.doc DOC document
MACC Attch4 —
SectionLPst PerfMACC.doc DOC document
Model ProjBIDSCH.DOC DOC document
Atch8EXBSUBCONTRACTORrelease.doc DOC document
10R0011MACCsol.pdf PDF
Disregard Amend 4 09Apr10.docx DOCX document
img-409141036-0002.pdf PDF
img-409141036-0001.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: FA5000-10-R-0011

Attachment 3

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)

Joint Base Elmendorf-Richardson, Alaska

MACC SPECIFICATION

GENERAL CONTRACT PROVISIONS

SECTION

DESCRIPTION

PAGES

01000

GENERAL CONTRACT REQUIREMENTS

01000-1 thru 01000-5

01100

GENERAL SITE REQUIREMENTS

01100-1 thru 01100-7

01200

ENVIRONMENTAL CONTROLS

01200-1 thru 01200-3

01300 EIELSON AFB SAFETY, ENVIRONMENTAL

PROTECTION, REGULATIONS,

AND CODES

01300-1 thru 01300-40 01400

GENERAL DESIGN REQUIREMENTS

01400-1 thru 01400-8

01500

GREEN PROCUREMENT

01500-1

01600

TASK ORDER CLOSEOUT

01600-1 thru 01600-2

01700

MATERIAL AND EQUIPMENT

01700-1

01800

CONTRACTOR’S QUALITY CONTROL

01800-1 thru 01800-5

Section 01000

General Contract Requirements

1. Contract Description: The Multiple Award Task Order Contract (MACC) is an Indefinite-

Delivery, Indefinite-Quantity (IDIQ) contract for execution that supplements Civil

Engineer’s (CE) in-house capability to perform minor construction, facility repair, and real property maintenance projects on an as needed basis. This requirement is geared towards repair/maintenance projects typically ranging from $100,000.00 to $1,500,000.00. The contractor shall provide all material, equipment, labor and general conditions to accomplish “non-complex” and/or “simple” design, maintenance, repair, and minor construction projects in an expeditious manner. The work may include facility upgrades, utility work, airfield pavement, roads, roofs and other assorted repair and maintenance projects. The construction work includes tasks in various trades such as carpentry, asbestos abatement/removal, demolition, mechanical, electrical, plumbing, concrete masonry, welding, and paving. Design as used in this acquisition means project estimating and preparation of minimal designs. All construction/Design should be in compliance with the current Base Design Standards.

1.1. Design Build: MACC Contractor shall develop project design documentation including drawings, Scope of Work, cost estimate broken out by CSI division and submittals representative of up to a 35% design effort (as identified within each Task Order). Upon completion of design, and upon acceptance by the Government, construction execution shall commence and be completed in accordance with Task Order requirements.

1.2. Construction Only: MACC Contractor shall be provided a completed design document drawings, Scope of Work and available specifications to initiate and complete construction execution in accordance with Task Order requirements. The MACC contractor will then develop a cost broken out by CSI division and a schedule to complete project.

2. Contract Requirements: The contractor shall furnish all personnel, labor, equipment, tools, materials, supervision, and other items and services necessary to design, manage, and accomplish a broad range of repair, alteration, and/or new construction work on various real property facilities. The projects will include tasks in a variety of trades such as demolition, site work, excavation, cast-in-place concrete, masonry, structural steel, electrical, mechanical (including HVAC), painting, carpentry, roofing, millwork, road repair, and other specialty and general contracting work.

3. Contractor Organization: The contractor shall have available a design and construction staff to respond to the requirements of this multi-discipline MACC type contract. The contractor’s organizational approach shall integrate with this staff to provide project management, project design/engineering, on-site superintendence, quality control and administration.

4. Ordering Procedures: As the need arises for performance under the terms of this contract, the Contracting Officer or authorized representative will issue a ‘Task Order Request for

Proposal’ (TORFP) providing a synopsis of the proposed project requirements, define the government evaluation method(s) to be used for subsequent award of Task Order, and establish the date, time and location of the pre-proposal site visit.

4.1. Normal Response Requirements: If the requirement is determined to be a normal response requirement by the Contracting Officer, the contractor shall submit a Task Order Proposal to fulfill the requirement within a maximum of fourteen (14) calendar days from written notification. Additional time may be allowed at the discretion of the Contracting Officer.

4.2. Quick Response Requirements: If the requirement is determined to be a quick response requirement by the Contracting Officer, the contractor shall submit a Task Order Proposal to fulfill the requirement within a maximum of seven (7) calendar days from written notification

4.3. During this period, a site visit with the contractor, Civil Engineering technical representative, and the contracting officer’s representative shall take place to clarify the scope of the requirement and verify the existing conditions. The contractors shall email detailed site visit minutes to the contracting officer within one (1) work day following the site visit. The contracting officer will provide a finalized scope of work by Amendment to the TORFP within two (2) business days following submission of the site visit minutes; unless determined otherwise by the Contracting Officer.

5. Project Locations: The contractor shall accomplish all work under this contract at Joint Base Elmendorf-Richardson, and Eielson AFB, associated sites outside of the Base/Post proper, and various remote sites, Alaska, in accordance with each Task Order.

6. Working Hours:

6.1. Standard Working Hours for the contractor are for the period from 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during non-standard working hours, on a Standard Working Hours Task Order, additional Government inspection forces may be required. The Contractor shall notify the Contracting Officer in writing, either by letter or email, three working days in advance of his/her intention to work during periods other than Standard Working Hours. This notification shall allow the inquiry into the availability of additional Government Inspectors. If the Contracting Officer confirms that additional Government Inspectors are reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than Standard Working Hours; however, if the Government Inspectors are required to perform in excess of their normal duty days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates may be charged to the Contractor.

6.2. Non-Standard Working Hours will be defined on individual task orders and shall be outside the definition of the standard working hours and not in controlled areas.

6.3. Standard and Nonstandard Work in Controlled areas will be specified in each affected task order. All work in restricted areas is assumed to be within standard working hours. All work inside of controlled areas may be subject to brief delays due to security processing (30 minutes time each process on and off per visit to the controlled area) or interruption to the normal work schedule to permit the completion of mission essential operations. Such interruptions, if required, will be given on short notice and expeditious action will be required. Each interruption may last up to sixty (60) minutes. The contractor shall not be compensated for said delays.

7. Material Submittals: Upon issuance of a Task Order, the Contractor shall submit work plans, material submittal register, samples, brochures, manufacturers data, product data sheets, shop drawings and/or certificates of materials (relative to the construction execution) to the Contracting Officer for approval prior to their installation within the project, in accordance with BDS /specifications and Task Order Requirements. If the material submittals provided are in variance from the BDS, the Contractor shall describe such variations in writing at the time of submission and request a variance from the design criteria in accordance with the terms and conditions of the contract. Failure to provide such notification will not relieve the Contractor from his responsibility of meeting the design criteria and/or contract specifications regardless of whether or not the submittal is approved by the Government. Material submittals shall be as specified under each specification section and be submitted in quadruplicate unless otherwise indicated. All the material submittals as indicated in the applicable specification section shall be submitted at the same time. If the submittal requirement is listed on the drawings, all material submittals of like work shall be submitted simultaneously and with all corresponding specification sections. A system of standard submittals for each contractor will be used to minimize the submittal requirement. Failure to submit all material submittals associated with an individual specification section at the same time will be cause for rejection.

7.1. Submittal Classifications: Submittals are classified as follows:

7.1.1. Government Approved: Governmental approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Within the terms of the Contract Clause entitled “Specifications and Drawings for Construction,” they are considered to be “shop drawings”.

7.1.2. Re-Certification: If the contractor intends to use previously approved materials or equipment, a letter certifying the specific material or equipment in lieu of a submittal is acceptable. Certification letter will contain the task order number and two (2) approved copies of AF Form 3000 submittal.

7.2. Approved Submittals: The Contracting Officer’s approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailed and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error that may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

7.3. Disapproved Submittals: The Contractor shall make all corrections required by the Contracting Officer and furnish a corrected submittal. Corrected submittals shall be submitted within two (2) working days, after receipt of by the Contractor in the form and number of copies specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause “Changes” shall be given promptly to the Contracting Officer.

7.4. Material Approval Submittal Form (AF Form 3000):

7.4.1. The Contractor shall fill out and submit a Material Approval Submittal (AF Form 3000) listing items of equipment and materials that are required by the specifications; this list may not be all inclusive and additional submittals may be required. Submit the material submittals and shop drawings to the Contracting Officer for approval within ten (10) calendar days after issuance of the Notice to Proceed for each delivery order.

7.4.2. Scheduling: Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time (a minimum of ten (10) calendar days) shall be allowed for review and approval.

7.5. Submittal registers (AF Form 66): Submittal Registers shall be submitted by the Contractor at the time the 90 percent design is submitted prior to any material processing.

7.6. Control of Submittals: The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date.

7.7. Government Approved Submittals: Upon completion of review of submittals requiring Government approval, the submittals will be identified as having received approval by being so stamped and dated. One copy of the submittal will be returned to the Contractor.

8. Project Status Updates: The contractor is required to provide weekly project status updates for all active projects. This meeting is to include staff from CES, Contracting Officials, and the Contractor. It will include any pertinent information regarding projects and provide a current percentage of completion for active construction projects.

9. Project Schedule: The submitted schedule must breakdown the project into distinct tasks, show which tasks will be accomplished simultaneously, and indicate the critical path. The purpose of the submitted project schedule is to aid in the determination of the construction period.

10. Mark Up: At no time shall the mark up for any task order modification exceed 40% for any combination of profit, overhead, and G&A. At no time shall the mark up extend beyond one subcontractor (e.g. prime of 22% and subcontractor 18%).

11. Interruption of Work: If it becomes necessary to interrupt work activities in buildings and/or areas for construction purposes (except as otherwise described in the task order), the contractor shall request permission, in writing, from the Contracting Officer fourteen (14) working days in advance. The contractor shall submit written requests for approved street closings fourteen (14) working days prior to closing of the street.

12. Project Coordination: The contractor shall coordinate all work schedules with the Contracting Officer or designated representative and CES MACC PM prior to the start of work.

12.1. Paving, Fencing, and Painting. Prior to start of any paving, fencing, or painting under this contract, the contractor shall coordinate start and completion dates in writing with the Contracting Officer five (5) working days prior to the scheduled start date.

12.2. Temporary construction. Any contractor installed temporary construction intended to prevent interruption of normal work activity or loss of utility services is subject to approval of the Base Civil Engineer through the Contracting Officer.

12.3. Special Projects.

12.3.1. Medical Facilities. The contractor shall coordinate all work in medical facilities through the CES MACC PM with hospital staff liaisons to minimize interruption of service.

End of Section

Section 01100 General Site Requirements

1. Coordination and Access to Site: Coordination with affected facility occupants (Using

Agency) shall be made through the Contracting Officer to assist the Contractor in completing the work with a minimum of interference and inconvenience. Upon award of basic contract, long-term passes shall be issued which will allow all contractor-controlled vehicles to access the Base in accordance with local procedures.

2. FPCON Restrictions: Access to Base may be restricted dependent upon the established

‘FPCON’ level at any time during the execution of the Task Order. Contractor shall be issued badge and vehicle pass allowing unrestricted access to the Base throughout FPCON levels ‘A’ and ‘B’. Increased FPCON levels approaching ‘C’ and/or ‘D’ shall be more restrictive, requiring further confirmation of current security requirements as provided by

Contracting Officer.

3. Cell Phone Use While Driving: COMPACAF Policy prohibits cell phone use while operating motor vehicles on PACAF installations. Vehicle operators on all PACAF installations will not use cell phones unless the vehicle is safely parked or they are using a hands-free device. A violation of this nature will result in the loss of on-base driving privileges for 30 days.

3.1. This policy applies to all uniformed military personnel, DOD civilians, contractors, family members and any other non-DOD drivers operating a motor vehicle on all PACAF installations. The contractor is responsible for notifying all employees of the policy.

3.2. If Security Forces personnel observe a driver excessively manipulating (dialing phone numbers, text messaging, etc.) their cell phone while the vehicle is in motion, the driver will be cited.

3.3. The only exception to this policy is if the user’s call is for an emergency situation where the user is speaking with an emergency response operator (e.g. fire dept/rescue, police dept or hospital). These calls can be verified.

4. Work Layout and Site Management: The Contractor shall coordinate the proposed layout of the work with the MACC PM and submit various site plans, field office requirements, dust control plans, and proposed storage areas in accordance with the project requirements associated with each Task Order.

4.1. Administrative Field Offices and Material Storage Trailers: The exterior need not comply with base standard colors; however, office and storage trailers shall be skirted, with skirting color matching body color. See BDS for more guidance.

4.2. Staging/Material Storage Area(s): The requirement for lay-down areas (staging areas) associated with a Task Order shall be dependent upon the size of project and in accordance with specific criteria as detailed in the Task Order. Prior to starting the work, the Contractor shall submit site plan to the Contracting Officer for approval, showing the layout and details of all temporary facilities planned for use on identified Task Order. The plan shall include the location of the safety and construction fences, location of all site trailers, equipment and material storage areas, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas as required by the Task Order. Site photographs prior to the start of work may be included with the plan. At completion of work, the Contractor shall remove the facilities and restore the site to its original condition. For most construction projects, the MACC PM will provide the contractor with a single staging area. A supplemental storage area may be identified if necessary by the detailed Task Order. All staging areas shall be completely screened with eight-foot high chain-link construction fencing and include visual screening with brown mesh.

4.3. All Contractor trailers, stored materials, and idle equipment shall be located in the designated staging area. The staging area shall be kept clean and orderly. Tarps are to be used, as necessary, to secure loose materials. The on-site representative of the Contracting Officer is the sole judge as to what constitutes an acceptable staging area. Dumpsters may be located outside the staging area, but must be sited as approved by the on-site representative of the

Contracting Officer. Any movement of a dumpster to another area on the project site must be approved by the Contracting Officer.

4.4. All items in the staging area shall be promptly removed when no longer needed or when the contract is completed.

5. Protection of Government Property: Contractor shall protect all Government property within the buildings in which he is working, except for such property as is required to be demolished. Property which is to be demolished, shall be protected until its scheduled demolition time. Protection shall include, but not be limited to, protection from construction generated dust, debris, water, and vibration.

6. Safety: All work shall be accomplished in accordance with OSHA 29 CFR 1910, OSHA 29

1926 and applicable AFOSH Standards.

7. Waste Disposal: All spoil, waste and debris removed from the work site and not specified for reuse or identified as salvageable items, shall become the responsibility of the Contractor and shall be disposed of off-base/site in areas authorized by the applicable county and/or state agencies and in accordance with current rules and regulations governing the disposal of solid waste. Disposal of hazardous waste shall be in compliance with local, state and federal standards as further described in Section 01200 – Environmental Controls.

7.1 There are no disposal or borrow pits located on Joint Base Elmendorf-Richardson. There may be disposal or borrow pits and waste disposal pits at the other sites. These will be indicated on the individual task order. For Eielson AFB information, see Section 01300.

8. Coordination, Safety and Regulatory Requirements:

8.1. Airfield Safety: Base Airfield includes a Restricted Access Security Area, identified by a red boundary line and entry control points labeled “Entry Point.” Individual Task Orders will identify applicable safety and security requirements. Airfield Manager and Base Operations will brief all workers and truck drivers on Flightline driving procedures. The Flightline Driving Briefing and Agreement for Contractor and TDY Personnel will be conducted by Airfield Management. This agreement, along with Contractor Badges (issued by Base Security Forces) shall be carried by all individuals operating vehicles on the Flightline.

9. Special Events: Bases may schedule a variety of special events during the contract effort.

During the course of these events, more stringent standards may be required for contract operations. Examples are stricter requirements for staging areas, worksites, and haul routes. The on-site representative of the Contracting Officer will provide specific requirements to the Contractor. The special events, and their approximate time periods will be as identified during the contract performance period.

10. Safety Cones and Barricades: The use of orange safety cones (regardless of color) is limited to short-term duration not exceeding one workday. Sawhorse type barricades (white with orange banding) is the only allowed safety barricade authorized for extended periods exceeding one day. Safety candle stick cones left over the authorized time period will be confiscated by the Base. The use of yellow safety tape to outline limits of access to a site is not allowed.

11. Security At The Work Site: Whenever facility security is breached to perform work required under this contract, the Contractor will be responsible for providing temporary measures in order to assure security is maintained at the level existing prior to construction. The Contractor shall provide adequate protection at his cost against vandalism and theft for all parts of the building wherever work under this contract is performed. This may include such security items as fencing around a facility or closing all openings in a structure during non-working hours. If vandalism or theft occurs as a result of contractor negligence, it will be the responsibility of the contractor to repair or replace lost or damaged materials, equipment, or facilities.

12. Equipment On The Work Site: Contractor shall store all supplies and equipment on project site so as to preclude theft or damage. The contractor is responsible for securing all their equipment left on the work site. The Contractor shall cover equipment that is to remain in-place within the area of work and protect it against loss or damage. Equipment removed in performance of work where directed for reuse in work as required by drawings and/or the Statement of Work shall be satisfactorily stored. Equipment temporarily removed shall be protected, cleaned, and replaced equal to its condition prior to starting work. Security for equipment and material that is to be reused and is removed for temporary storage shall be the sole responsibility of the Contractor. Contractor shall maintain the work site in a safe and orderly manner.

13. Roadways:

13.1. Cleanliness Of Paved Surfaces: When paved surfaces are jointly used by the Air Force and Contractor, the Contractor shall keep all paved surfaces, such as runways, taxiways, and hardstands, clean at all times and, specifically, free from small stones which might damage aircraft propellers or jet aircraft. In restricted areas the traveled areas shall be cleaned using a self-propelled vacuum, vacuum truck, or other appropriate equipment and shall be cleaned to the approval of the using agency through the Contracting Officer's representative.

13.2. Hauling: Loose debris on trucks leaving the site shall be loaded in a manner that will prevent dropping of materials on streets and conform to local ordinances and laws. Fasten suitable cover, such as a tarpaulin, over the load before entering surrounding streets. The Contractor shall be responsible for cleaning up materials that fall from trucks immediately after he becomes aware of it.

13.3. Load Limits On Pavement: Vehicle traffic on concrete pavement shall be restricted to equipment with pneumatic tires.

13.3.1. The limit for vehicular loading on all areas of concrete over building structures and access bridges shall be a pickup type truck with a payload not to exceed 1,000 pounds or a gross vehicular load of 5,000 pounds.

13.3.2. The limit for vehicular loading on concrete access ramps and “on-grade” concrete pavement shall be 5,000 pounds per vehicle wheel. For the purpose of this limitation, dual wheels shall be considered as two wheels.

13.4. Traffic Control: The Contractor shall comply with the recommendations contained in Part 6 of the U.S. Department of Transportation, Federal Highway Administration’s Manual on Uniform Traffic Control Devices and Guides for Traffic Controls for Street and Highway Construction, Maintenance, Utility, and Incident Management Operations (D6.1-1978) to insure proper warnings to motorists and adequate traffic control. All signs, warning lights, barricades, and other traffic control devices shall be provided by the Contractor at his/her expense.

13.5. Upkeep And Work Adjacent To Roads And Highways: In addition to the requirements in CONTRACT CLAUSE entitled “Operations and Storage Areas,” (FAR 52.236-10 Apr 1984) the Contractor shall comply with the following requirements: Where the construction work is on or adjacent to, or involves hauling over public or private roads, streets, or highways, as herein referred to as “roads,” the said roads shall, except as otherwise specified or directed, be kept open for traffic at all times during the construction period. Further, the Contractor shall, during said construction, provide, erect and maintain warning signs, lanterns or torches or other safety devices and, when necessary, provide flagmen for protection of traffic to the satisfaction of the Contracting Officer and local authorities. The Contractor shall keep the right-of-way of the roads free of debris that might be caused to accumulate thereon by his operations, and upon completion of the work, shall clean up the said roads and repair any damage to the roads occasioned by his operations under this contract to the satisfaction of the Contracting Officer and the Highway Department. The drainage from the roads shall not be obstructed by the construction work. The Contractor shall be responsible for obtaining and paying for all permits required for operation on all roads.

14. Utilities Services: (FAR 52.236-14)

14.1. Government Provision: Available water and electricity may be used in reasonable quantities in this work at no cost to the Contractor. The Contractor shall make arrangements for such services with the Contracting Officer or his/her designated representative. Should utilities not exist it is the Contractor’s responsibility to provide them if necessary.

14.2. Contractor-Caused Outage: All temporary outages of any utility services required for the performance of work shall be scheduled through the Civil Engineer Squadron no less than seven (7) calendar days in advance of outages. Requests shall be made in writing to the Contracting Officer. Requests shall stipulate specific utility system(s) (and circuits) to be affected, the location of the work, the time at which the shutdown will occur, and the duration of the outage for each system. Outages shall be kept to a minimum both in number and duration. Where multiple outages are required, as many outages as can be accurately scheduled shall be submitted as a group.

14.3. In the event of a contractor caused utility failure/disruption, the Contractor will first make the area safe, then immediately contact the Civil Engineer Squadron or appropriate site manager.

14.4. If the damaged utilities are previously known or shown to the contractor, or there is negligence on his part, the utilities will be repaired by the Contractor in a timely manner at no cost to the Government. Should the Contractor opt not to fix the damage it can be repaired by the Government and billed to the Contractor.

14.5. Government Responsibility: The Government will approve service tie-in points, disconnect and reconnect utility service for Contractor tie-ins. Connections to these tie-in points shall be the responsibility of the Contractor. Civil Engineer personnel are responsible for the switching to de-energizing and energizing of all utility systems

14.6. Interruption Of Service: The Government may not be held responsible for interruptions of utility service and will not be liable for Contractor delays, damages, or increased costs occasioned by any interruption of service.

14.7. Contractor Responsibility: The Contractor shall be responsible for installing and maintaining temporary cords, lines, or other equipment in a safe condition. Only compatible adapters shall be utilized for hydrant connections. A hydrant wrench of correct size shall be used to control the flow. Temporary connections to fire hydrants shall be disconnected at the end of each work day. The temporary connections shall be controlled with an auxiliary valve such that the hydrant remains at a full-open or full-closed position, and a backflow preventer.

14.8. Prior to Final Acceptance: All temporary cords, lines, or other equipment shall be removed and the existing outlets and lines restored to the condition existing prior to the start of construction.

14.9. Existing Utility Verification: The locations, sizes, and types of all utility lines shown on the Plans are for informational purposes only and are not to be relied upon without verification by exploratory digging. The Contractor shall verify the field location of all existing underground utilities in service within the immediate area of any proposed construction which may conflict with existing utilities. No less than ten (10) working days written notice shall be given by the Contractor for locating and flagging of existing utilities. The Contractor shall excavate exploratory trenches in the presence of representatives from all utility companies and the Contracting Officer or the Contracting Officer’s representative. The trench shall be a minimum of three (3) feet wide and excavated to a depth at least two feet below the respective construction shown on the plans, or deeper if directed by the Contracting Officer or the Contracting Officer’s representative. Hand diggings, probing, and remote detection techniques shall precede machine excavation. It is the responsibility of the Contractor to protect all utilities which are to remain in service for the duration of the project construction, or until their abandonment is directed by the Contracting Officer or the Contracting Officer’s representative.

14.10. Excavation permits: The Contractor shall obtain and process a written excavation permit (3rd Wing Form 3, Base Civil Engineer Work Clearance Request) before starting any excavation on this project. The 3rd Wing Form 3 also requires the Base Civil Engineer’s or his authorized representative signature. Contractor shall allow a minimum of ten (10) working days from date of application to process the excavation permit.

14.10.1. Digging permits for the remote sites will be obtained from the BOS contractor.

14.11. Utility Marking Of Yet To Be Accepted Work: The Contractor shall be required at the request (in writing three calendar days) of other contractors working in the area to flag the utilities being installed on his specific contract within 10 working days of the request.

14.12. Protection Of Utility Lines: It shall be the Contractor’s responsibility to protect all existing utility lines from damage during excavation for utilities systems. Any damage resulting to existing utility systems shall be repaired by the Contractor, to the satisfaction of the Contracting Officer, at no additional cost to the Government.

14.12.1. Existing buried utility lines will be marked to delineate a four (4) foot area of liability. Any damage done to an existing line within two (2) feet of the flag shall be repaired by the Contractor. If the damage occurs outside the area, Civil Engineer will assume responsibility for needed repairs.

14.13. Additional or specific information concerning utilities services located off base proper or at remote sites will be provided per task order.

15. Contractor’s Telephone:

15.1. The Contractor shall provide the Contracting Officer with a telephone number at which the Contractor, or his/her representative, may be contacted at any time during standard working hours.

15.2. Telephone Service: When the Contractor is located on Base, the Contractor shall have temporary telephone service line(s) installed at the office site. A company with compatible hook-ups to existing systems shall be the installation agent and shall be consulted prior to installing any telephone equipment.

15.3. Contract Completion: At the completion of the contract, all temporary telephone equipment shall be removed at the expense of the Contractor.

15.4. Costs: All costs incurred as a result of the telephone installation and service shall be borne by the Contractor.

15.5. Emergency Phone Number: An after standard hours emergency telephone number for the Contractor shall be provided to the Contracting Officer or his/her authorized representative. Updates shall be provided to the Contracting Officer or the Contracting Officer’s representative in a timely manner.

15.6. Communications Security (COMSEC): All communication with Department of Defense (DOD) organizations are subject to COMSEC review. Contractor personnel will be aware that telecommunications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized monitoring of the military phone calls originating from or terminating at DOD organizations. Therefore, civilian Contractor personnel are advised that any time they place a call to or receive a call from a USAF organization, they are subject to COMSEC procedures. The Contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DOD information.

16. Recording and preserving Historical and Archaeological Finds: All items having any apparent historical or archaeological interest which are discovered in the course of any construction activities shall be carefully preserved. The Contractor shall leave the archaeological find undisturbed and shall immediately report the find to the Contracting Officer or the Contracting Officer’s representative, so that the proper authorities may be notified.

17. Adverse Weather: Occasionally weather dictates early release, late report, or complete base closure resulting in absence of Base personnel. When such weather conditions cause one of the above situations, contractor personnel will be denied access to the base, unless they have been notified by the Contracting Officer their contract service has been determined essential. Denied access in these situations will result in no additional cost to the Government.

17.1. Some of the following radio and television stations broadcast and monitor Joint Base Elmendorf-Richardson closing and late reporting information: KFQD (750 AM), KENI (650 AM), KWHL (106.5 FM), KTVA (TV CH 11), KIMO (TV CH 13).

End of Section

Section 01200 Environmental Controls

1. Presence of Hazardous Materials (HAZMAT): The contractor is advised that hazardous materials (HAZMAT) may be encountered during the execution of Task Orders. When a

Task Order identifies a Government-provided design, a HAZMAT Survey will be typically included as part of the design submittal. When a HAZMAT Survey cannot be provided, or when the Task Order specifically requires the MACC Contractor to include the development of the HAZMAT Survey, the contractor will be responsible to perform a

HAZMAT Survey of all anticipated surfaces/areas involved with the project that can be suspected of containing hazardous materials which will impact the construction/renovation process. This tasking will be required to establish the extent of hazardous materials which will require abatement or special handling procedures during the execution of the following-on construction/ renovation project. The potential hazardous materials may include asbestos, lead-based paint, polychlorinated biphenyl (PCB), radon, radioactive materials, and other materials identified by the Environmental Protection Agency which typically affect construction.

2. Radioactive Materials (RAM):

2.1. Use of RAM during Contract Execution: Contractors bringing radioactive materials or devices containing radioactive sources onto Base must have prior approval from the Wing Radiation Safety Officer (RSO). The RSO for Joint Base Elmendorf-Richardson is the Bioenvironmental Engineering Flight Commander, who can be reached at (907) 552-3985. Under no circumstances will a contractor use an unlicensed radioactive source/device on Base. The contractor should direct any questions regarding responsibility on this issue to the Wing RSO prior to starting any work. Since the Air Force considers contracts involving radioactive materials a hazardous material items contract, the provisions of AFR 87-8, chapter 3, section 3.3(f) will also apply. In addition, the contractor must submit the following documentation to the Wing RSO for review prior to execution:

2.1.1. Copy of the Nuclear Regulatory Commission License or Agreement State Radioactive Material License, along with any amendments, covering the radioactive material to be used.

2.1.2. Copy of the user’s qualification and radiation training.

2.1.3. Copy of the radiation dosimetry results from the previous year.

2.1.4. Statement of expected use (use rate) of radioactive materials or devices for the length of the contract.

2.1.5. Statement of storage and security requirements.

2.1.6. Copies of the last two (2) leak checks (if applicable).

2.2. Radioactive Demolition Recycling/Debris: Radioactive material encountered during demolition procedures will require a written request from the Contractor to the Base

Bio-Environmental office for instructions and subsequent actions involving disposal of the RAM debris through Base agencies. Examples include smoke detectors containing a radioactive substance (such as Americium-241) and self-luminous exit signs containing tritium.

2.3. The following requirements apply when removing potential radioactive items (i.e. smoke detectors and non-electrical emergency exit signs) during demolition or renovation procedures. The contractor shall develop list of identified RAM items and forward to the Base Radiation Safety Officer via the Contracting Officer. The list shall include the following descriptions associated with the RAM:

2.3.1. Product Stock Number

2.3.2. Quantity

2.3.3. Nomenclature

2.3.4. Radionuclide

2.4. The Base Radiation Safety Officer will then coordinate with USAF Radioactive

Material Recycling/Recovery Program at Joint Base Elmendorf-Richardson, for recycling instructions to include packaging instructions for contractor shipment. The contractor shall then prepare the radioactive/recyclable items per shipping/packaging instructions and make shipment.

2.5. Shipment Procedures: Contractor collects RAM recoverable/recyclable items and places items in suitable container with bubble wrap to prevent breakage of items. The items shall be packaged in a strong container (that meets the following requirements:

2.5.1. Easily handled and secured in or on conveyance.

2.5.2. If provided with lifting attachment, designed with a safety factor.

2.5.3. External surfaces free from protruding features.

2.5.4. Outer layer will prevent collection of any liquid (e.g. water).

2.5.5. Withstands conditions of normal transport including closing devices

2.5.6. Materials physically and chemically compatible.

2.5.7. Protected against unauthorized operation.

2.5.8. Each feature added does not reduce the safety of package

2.5.9. Contractor shall pre-package items for storage/shipment on-site (protected from the elements) and maintain detailed inventory (Recycle Item Description: Stock Number, Nomenclature, Radionuclide, Activity each, Quantity) and accountability for items placed into each package(s). Package limits shall be less than 0.5 mrem/hr from any contact surface of the package, with no removable contamination above background levels, and the gross weight of any individual package shipped for recycling must not exceed 200 pounds. If shipping by drum, use drums with a capacity of 30-gallons or less, such as NSN 8110-01-454-1841.

End of Section

SECTION 01300

EIELSON AFB

SAFETY, ENVIRONMENTAL PROTECTION,

REGULATIONS, AND CODES

PART 1 GENERAL

1.1 REQUIREMENTS INCLUDED

A. Reference Standards

B. Submittals

C. Licenses and Permits

D. Environmental Management System Awareness Training

E. Safety

F. Construction Operation and Safety Plan

G. Safety and Health

H. Fire Safety

I. Use of Ionizing Radiation

J. Use of Lasers

K. Radioactive Materials

L. Use of Radio Frequency Radiation

M. Use of Ultraviolet Radiation

N. Protection of Nesting Birds

O. Discovery of Historical or Cultural Artifacts

P. Affirmative Procurement Program

Q. Environmental Protection

R. Environmental Protection Plan

S. Hazardous Waste Plan

T. Hazardous Waste Testing

U. Polychlorinated Biphenyl / Transformers

V. Ozone Depleting Substances

W. Lead Base Paint

X. Asbestos Containing Materials

Y. Suspected Hazardous Materials

Z. Oil-Filled or Impregnated Electrical Components

AA. Cleaning & Debris Control

AB. Spill Reporting / Clean-up

AC. Sampling and Analysis Plan

AD. Personnel

AE. Excavation

AF. Backfill

AG. Field Report

AH. Storm Water Pollution Prevention

AI. Hazardous Waste Testing

AJ. Waste Disposal, Borrow Pits, Imported Material, and Environmental Protection

AK. Wetlands

AL. Industrial Ventilation

AM. Hazardous Material Management

1.2 commonly used Acronyms

ACM

Asbestos Containing Material

ADEC

Alaska Department of Environmental Conservation

AOO

Asbestos Operations Officer

APO

Asbestos Program Officer

CO

Contracting Officer

EPA

Environmental Protection Agency

EMS

Environmental Management System

EPCRA

Emergency Planning and Community Right-to-Know Act

EPP

Environmental Protection Plan

ESOHTN

Environmental, Safety, and Occupational Health Training Network

HAZMAT

Hazardous Material

HAZMART

Hazardous Material Pharmacy

IRP

Installation Restoration Program

MSDS

Material Safety Data Sheet

NOI

Notice of Intent

NPDES

National Pollutant Discharge Elimination System

NTP

Notice to Proceed

PCB

Polychlorinated Biphenyl

PID

Photo Ionization Detector

RCRA

Resource Conservation Recovery Act

RSO

Radiation Safety Officer

SAP

Sampling and Analysis Plan

SWPPP

Storm Water Pollution Prevention Plan

1.3 REFERENCE STANDards

A. Comply with all applicable laws, building and construction codes and applicable requirements of any governmental agency under whose jurisdiction this Work is being performed.

B. Federal, State and Local Codes and Ordinances take precedence over these Specifications and Drawings where conflicts occur, unless the Drawings or Specifications call for more stringent requirements. Notify the Contracting Officer in writing of conflicts.

C. Obtain a copy of standards referenced in the various Specification Sections. Maintain a copy at the jobsite during execution of portion of the work to which the standard applies.

D. All work shall be governed by the more stringent provisions of these contract document requirements or the latest published edition or statute- adopted edition, of the following applicable codes, regulations and standards:

ADA

Americans with Disabilities Act Accessibility Guidelines

AFI

Air Force Instructions

AS

Alaska Statutes

AAC

Alaska Administrative Code

ASTM

American Society of Testing and Materials

CFR

Code of Federal Regulations

COE EM

Corps of Engineers Manuals

COE ER

Corps of Engineers Regulations

CSC

Alaska Department of Labor Construction Safety Code

FAR

Federal Acquisition Regulations

FWI

Fighter Wing Instructions

NEC

National Electrical Code

OSHA

Occupational Safety and Health Act - Federal and Alaska Regulations

Other applicable codes and standards as applicable or as referenced by the individual specification Sections.

1.4 SUBMITTALS

A. The following shall be submitted in accordance with Section 01000, SUBMITTALS:

1. Environmental Protection Plan

2. Construction Operation and Safety Plan

3. Alaska Department of Environmental Conservation (ADEC) Excavation Dewatering Permits

4. Eielson AFB Hot Work Permits

5. Copy of Application for use of radioactive materials

6. Storm Water Pollution Prevention Plan (SWPPP)

7. Copy of National Pollutant Discharge Elimination System (NPDES) Notice of Intent (NOI) and Environmental Protection Agency (EPA) approval

8. Evidence of delivery of SWPPP to ADEC

9. Phase I Environmental Assessment Certificate for Imported Earthwork and Aggregate Materials

10. Sampling and Analysis Plan

11. Waste Disposal/Borrow Pit Plan

12. ADEC Approvals to Construct

13. NOI for asbestos abatement

14. ADEC Approval to Transport

15. ADEC Approved Disposal Facility Weight and/or Acceptance Ticket

16. ADEC Approved Disposal Facility Certificate of Thermal Incineration or Disposal along with confirmatory sample results

17. Field Report

18. Site Specific Safety and Health Plan

19. Complete contractor notification form for potential asbestos hazards (attached at the end of this document)

1.5 LICENSES AND PERMITS

A. The Contractor shall obtain and maintain current for the duration of this Contract, all required Federal, State and local licenses and permits. All associated fees and taxes shall be paid by the Contractor without additional cost to the Government.

B. The Contractor shall obtain any additional Eielson AFB required permits. Current base permit requirements shall be provided to the Contractor at the preconstruction conference.

1.6 EMS Awareness Training

A. All on-site superintendents and safety officers working on Eielson AFB shall be required to complete, at a minimum, the EMS Awareness Training and the Contractor/Engineering Training prior to reporting for work on base. The Training is part of the Air Force’s Environmental, Safety, and Occupational Health Training Network (ESOHTN). The contractor shall be provided the web site and password following contract award. On-site training certification shall be available for review upon request.

1.7 Safety

A. Comply with all Federal and State regulations concerning safety of personnel and equipment. All Contractor personnel shall wear hard hats and steel toe safety shoes while on the project site.

B. Comply with all Federal, State, and Local regulations on safety of personnel and equipment. In addition, comply with the applicable provisions of the U.S. Army Corps of Engineers’ manual, Safety and Health Requirements, EM 385-1-1 and OSHA Standards.

C. Ensure that lock out, tag out procedures are established and used as directed by 29 CFR 1910.145. Ensure that contractor’s personnel on site are trained on the government’s procedures.

D. Comply with all safety, traffic and protection requirements in effect on Eielson AFB. Government shall brief the Contractor on these requirements at the preconstruction conference.

E. (Include only if applicable.) Work areas in this Project may be classified as “permit-required confined spaces” or “non-permit required confined spaces.” The Contractor’s Certified Industrial Hygienist shall determine the confined space status of the Project areas. Regulations and procedures for entry into “permit-required confined spaces” are contained in 29 CFR 1910.146 and 8 AAC 61.010.14. The Contractor is responsible for ensuring the safety of his employees in confined spaces according to these regulations.

F. Confined Space Permit: (Include only if applicable.)

1. Provisions for confined space are outlined in 29CFR 1910.146 and ANSIZ117.1 1989 and shall be followed throughout Project.

2. Base Contact for information regarding confined Space issues is Ground Safety (354 FW/SEG, 377-4260). However, the Contractor shall process any permits required for confined space through his own safety Manager and Permit Space Program.

G. Provide safety barriers around open excavations, openings in floors and other hazards created by the Contractor’s activities.

H. The Contracting Officer (CO) or [Power Plant Superintendent, Maintenance Foreman or Shift Foreman, or other appropriate person] designee may direct the Contractor to cease activities which, in their opinion, are unsafe or which jeopardize operations at the plant. However, this provision does not relieve Contractor of sole responsibility for safety for project activities.

I. Contractor shall protect the Base residents and general public from harm in the construction area.

1.8 CONSTRUCTION OPERATION AND SAFETY PLAN

A. Contractor shall provide a Construction Operation and Safety Plan (COSP) for all construction operations.

B. The COSP shall include the following:

1. Detailed construction schedule and work phasing with dates of operation for work elements.

2. Route maps to and from construction sites for workers and equipment and hazardous material transport routes. Route maps shall include FOD fence locations and requirements.

3. The COSP shall be submitted to the Contracting Officer at least 30 days prior to start of construction.

1.9 SAFETY AND HEALTH

A. The Contractor shall have a developed and maintained written Safety and Health Program (SHP) in compliance with the requirements of OSHA standard 29…