SPECS-20K portable loading docks 1 Oct 24.pdf
PDF 98 KB Posted
- Attached to
- 20K Portable Loading Dock/Ramp Rental/Lease
- Solicitation number
- FA4897QC079
About this file
This document is a Specification Sheet for a solicitation to rent/lease two portable loading docks or ramps to support the 366th Fighter Wing at Mountain Home AFB, Idaho. The required ramps must have a minimum usable surface of 94" wide by 26' long, a 20,000 lb weight capacity, and be adjustable up to 52" in height with wheels for easy transportation. The contractor must deliver, install, and provide training on the ramps, which are required from October 10 to November 7, 2024. One unit must be delivered to the Twin Falls Airport and one to Wendover Airfield, Utah. This requirement is issued as a Request for Quotation (RFQ) under a 100% Small Business Set-Aside (NAICS 332312). Quotes are due by October 1, 2024 at 2:00 PM MST. The solicitation is being issued by the Department of the Air Force's Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBO-RFQ FA4897QC079 - Portable dock-ramp.pdf | ||
| Attach 1 - SPECS - Portable Ramps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION SHEET
Mountain Home AFB, ID
Portable Loading Dock/Ramp Rental/Lease
1 Oct 2024
1. GENERAL: Units of the 366th Fighter Wing located in Mountain Home, ID require the rental/lease of Two (2) portable loading docks or ramps to onload and offload vehicles from tractor trailers.
2. The Contractor shall provide all personnel, labor, management, equipment, tools, and any other item(s) or services necessary in order to transport/ship/deliver, and pick-up for return, Two
(2) Portable Ground-to-Truck loading Docks/Ramps, which will be delivered to two separate locations as indicated below in Section 5. The Item(s) shall be delivered on 10 Oct 2024 and picked up on 7 November 2024.
MINIMUM SPECIFICATIONS: must (at a minimum) comply with the following salient characteristics and capabilities:
2.1. Physical Characteristics. The ramps will be used to unload/load military equipment vehicles and forklifts;
2.1.2. Usable Surface Dimensions: 94” W x 26’ L.
The loading docks / ramps must be capable of unloading/loading military vehicles with a width of 94” Wide. The ramps must be at least 26” In length to support incline to off load a forklift with low-clearance.
2.1.2. Weight Capacity: 20,000 lbs.
2.1.3. Adjustable up to 52” in height
2.1.4. Wheeled to ensure ease of transportation for short distances
2.1.5. Offeror’s must include/state their capability of delivering items on time and ability to meet the required deliver dates.
3. INSTALLATION/SETUP: The Contractor shall provide all personnel, equipment, tools, materials, supervision,transportation, and other items needed to setup/install the requested Ramps, to be ready for use upon delivery. The Contractor shall assemble and install all requested equipment in accordance with (IAW) manufacturer’s specifications. (If needed/applicable). The Contractor shall ensure proper location and orientation of the ramps upon advisement of military personnel. Any equipment not functioning properly IAW manufacture’s specifications shall be diagnosed and repaired by the Contractor.
4. TRAINING: The Contractor shall conduct training of entire system to Government personnel.
4.1. Following completion of installation, the Contractor shall provide technical support if there are any issues either by telephone or in person.
5. LOCATION & DELIVERY:
5.1. Contractor shall deliver one (1) unit to the Twin Falls Airport, 492 Airport Loop, Twin Falls, ID 83301
5.2. Contractor shall deliver one (1) unit to Wendover Airfield, Utah. 345 Airport Apron, Wendover UT 84083.
5.3. Rental period for both units will be 10 October 2024 – 7 November 2024.
File details come from the government source that posted it. Updated .