This is a Specification Sheet for delivery of concrete foundation materials to Mountain Home Air Force Base (MHAFB) in Idaho.
The contractor must deliver three material types by specified dates between April 15 and July 31, 2026: 500 U.S. tons of 0.75-inch minus Aggregate Base Course (D-1 Grading) by approximately May 8, 2026; 410 U.S. tons of #4 Rock Crushed concrete (subbase aggregate material) by May 8, 2026; and 300 total cubic yards of 4500 psi concrete starting around May 10, 2026, delivered across multiple days as coordinated with the government (163 cubic yards with pump truck capability and 137 cubic yards without). Deliveries must occur between 6:00 AM and 6:00 PM Monday through Friday, with the government providing 48-hour minimum notice before each delivery. The contractor is responsible for all personnel, labor, management, supervision, materials, supplies, transportation, and delivery. Materials will be delivered to MHAFB with specific on-base locations coordinated with the RED HORSE Project Manager/Engineer at commercial gate coordinates 43.0696, -115.8954.
The contractor must submit technical submittals with their quote including material source locations and testing/inspection documentation per specified ASTM standards for soils (sieve analysis, liquid limit, plastic limit, Proctor Method C, sand cone test, bulk specific gravity) and concrete (sampling, temperature, slump test, unit weight, air content, cylinder and beam creation). Non-conforming materials identified during delivery must be stopped immediately and replaced by the contractor at no additional cost to the government. The contractor must comply with all applicable Federal, State, and local laws; Mountain Home AFB security and access procedures including base access forms submitted within five business days of award; OPSEC requirements; Environmental "you spill, you dig" policies; and provide a supervisor available during work hours who reads, writes, and speaks fluent English with sufficient technical knowledge of the specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| FA489726QC033 COMBO - Concrete Foundation Materials.pdf | ||
| Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION SHEET
For
Concrete Foundation Materials (Concrete, Base Course, #4 Rock) Mountain Home AFB, ID
26 FEB 2026
1. GENERAL: The contractor shall provide all personnel, labor, management, supervision, materials, supplies, transportation and delivery, and any other item(s) and/or services necessary in order to provide and deliver (Base Course, #4 Rock, and Concrete) to Mountain Home AFB, ID 83648. All work shall be conducted in accordance with all applicable Federal, State, local laws and regulations and this specifications document.
1.1. Contract Changes/Additional Work. At future dates, the government reserves the right to incorporate, add, remove, and/or modify quantities of work within the scope of this requirement.
At times, due to the nature of work, it may be necessary to modify this requirement on an as-needed basis. Any future changes to this requirement will be negotiated and incorporated in the contract via contract modification, by negotiation based on priced line items currently incorporated within the contract. The contractor shall invoice based on the actual quantity requested and delivered.
1.2. DELIVERY: The Contractor shall be available to deliver Items (See Para. /Section 2), starting 15 April 26 through 31 July 26.
1.2.2. Delivery Days & Time(s) shall occur between 6:00 AM and 6:00 PM on Monday through Friday.
1.2.3. Delivery Request Procedures: The government shall notify the contractor as early as possible to schedule the requested delivery date and quantity. At a minimum the government will notify the contractor with a 48-Hour notice prior to the required date for each delivery. The Government (820 RHS Project Manager or Project Engineer) and the Contractor will coordinate together the date/time and specific location of deliveries
1.3. LOCATION / DELIVERY SITE: All materials will be delivered to Mountain Home Air Force Base (MHAFB). The government will provide the specific delivery location on base.
Specific drop-off location on site will be coordinated with the assigned RED HORSE Project Manager/Engineer. Commercial gate coordinates: 43.0696, -115.8954
2. MATERIAL SPECIFICATIONS / SALIENT CHARACTERISTICS.
2.1. Base Course. The contractor shall deliver 500 U.S. tons of 0.75-inch minus Aggregate Base Course of D-1 Grading.
Specifications: ¾” aggregate base course of D-1 Grading
Delivery Schedule: The contractor shall deliver 500 U.S. tons delivered by approximately 8 May 26.
2.2. #4 Rock. The contractor shall deliver 410 U.S. tons of #4 Rock Crushed concrete.
Specifications: Subbase aggregate material
Delivery Schedule: The contractor shall deliver 410 U.S. tons by 8 May 26.
2.3. Concrete. The contractor shall deliver 300 total cubic yards of 4500 psi concrete (approximately
163 Cubic Yards with a pump truck, and 137 Cubic Yards without a pump truck).
Specifications: 4500 psi concrete
Delivery Schedule: Starting on or around 10 May 26, the contractor shall deliver 300 cubic yards of 4500 psi concrete as needed, across multiple days. 820 RHS will coordinate with contractor with 48 hours notice prior to delivery of concrete, including quantity, delivery location, and necessity of pump truck extension for footer pours.
2.4. Tests, Inspections, and Verification documents for technical acceptability. The Contractor shall provide the following submittals for Base Course, and #4 Rock, along with their quote.
a. Location/Source of supply. The contractor shall provide the origin/ source location of each material. As well as sufficient information that each product/material proposed meets the specifications indicated above to each applicable material and the following:
b. Soils. (Base Course and 4 Rock).
i. Sieve Analysis - ASTM C117 and C136
ii. Liquid Limit - ASTM D4318
iii. Plastic Limit - ASTM D4318
iv. Proctor Method C – ASTM D1557
v. Sand Cone Test (In-Place Density) – ASTM D1556
vi. Bulk Specific Gravity Coarse Grain – ASTM C127
vii. Bulk Specific Gravity Fine Grain – ASTM C128
c. Concrete.
i. Sampling – ASTM C172
ii. Temperature – ASTM C1064
iii. Slump Test – ASTM C143
iv. Unit Weight Test – ASTM C138
v. Air Content (Pressure Method) – ASTM C231
vi. Creating Cylinders – ASTM C31
vii. Creating Beams – ASTM C31
2.5. Non-Conforming Item(s). Upon inspection, if material/Item(s) are found/identified to not be in accordance with the Salient Characteristics / Not Technically Acceptable during delivery, the Contractor shall stop delivery immediately upon government personnel request. Substantial material that is determined to not be in conformance will be replaced by the contractor at no additional cost to the government.
2.6. The Awarded Contractor and the Government shall coordinate together to schuedle/coordinate base/installation access and escorts onto Mountain Home AFB in accordance with base procedures.
3. Military Installation Requirements
1.1. All mud, dirt, debris, foreign objects, trash, or spills caused by the contractor (including
Sub-Contractors) on a street or parking lot, used as access to the work site or staging area, shall be cleaned off the same day or as soon as practicable or requested by the CO.
1.2. The Contractor shall immediately report to the CO to discuss any issues or incidents which may indicate potential imminent risk to Government personnel or the environment. Following the notification, the Contractor shall be available to the CO for instructions regarding remediation of the release. Contractor should be aware of “you spill, you dig” policies, which means if you are the cause of the spill then you are responsible for the cleanup. To report a release or spill, contact the CO immediately.
1.3. The Contractor shall follow existing security procedures and instructions applicable to
MHAFB. The Contractor is responsible for providing required documents in a timely manner to maintain the submitted work schedule. Delays caused by documents not being submitted early enough are the responsibility of the Contractor.
1.4. The contractor shall adhere strictly to existing security procedures and instructions applicable to accessing MHAFB. Contractor personnel attempting to access MHAFB shall hold a current, valid identification (ID), (REAL ID Act Compliant). The U.S Government shall not be liable for delays resulting from pass coordination/approval.
Contractor shall allot time into its schedule for obtaining base access.
4. Operations Security. The contractor shall comply with the 366 FW OPSEC requirements and countermeasures to protect critical information as defined in AFI 10-701, Operations Security.
Contractors shall receive unit specific OPSEC briefing prior to the start of work. Briefing documentation must be completed by the respective unit OPSEC coordinator. The unit OPSEC personnel will provide guidance on protecting critical information, training materials, and other instructions as needed. The contractor will comply with the 366 FW OPSEC Policy that imposes a 100% shred requirement of all government related paper products using NSA approved devices only.
5. Emergency Situations. Installation access may be restricted at any time. Restricted access is reserved for emergency actions, exercises, or increased installation security.
6. Contractor Responsibility.
6.1. The Contractor is responsible for the wellbeing of their workers. The Government will not be responsible for supplying food or water to the Contractor’s workers. The Contractor should bring enough food and water for his/her workers to last the entire delivery period.
6.2. The Contractor shall provide the name and phone number of a supervisor that can make decisions for the Contractor and who is responsible for the performance of the work. The supervisor shall be designated in writing when the contract is awarded and must always be available during work hours. The supervisor shall read, write, and speak fluent English.
Additionally, the supervisor shall have sufficient technical knowledge regarding the requirements prescribed in this document. The identified Government representative shall have the right to request a replacement for any individual not deemed acceptable to the Government at any time.
SECURITY REQUIREMENTS
1. GENERAL: Contractor personnel employed under this contract shall meet the requirements of all security requirements addressed in this PWS. The 366th FW Information Protection (IP) office will provide oversight as the Servicing Security Activity (SSA). Sponsoring Air Force organization will ensure Integrated Visitor Groups complete all necessary security training, i.e. Information, Physical Security and Anti-Terrorism. The contractor shall ensure requirements for obtaining Contractor personnel security clearances/background checks, protecting Government property, safeguarding protected information/materials, and shielding Government AISs and non-automated information systems are met. The Contractor shall also perform in accordance with the Compliance with National Industrial Security Program Operating Manual (NISPOM). NOTE: Not all security requirements will apply to every contract. Please reference contract agreement to determine appropriate requirements.
2. Listing of Employees. The contractor shall maintain a listing of all employees performing work under this contract. The list shall be validated and signed by the Contracting Officer Representative (COR), and provided to the Contracting Officer (CO), SSA and host unit supervision. The contractor shall update the list when employees move positions, are replaced, or upon request. The Contract Manager (CM) will also provide visit notification identifying all integrated personnel regardless of clearance level. The list shall include the employees’ Names, Location of Performance, and Security Clearance.
a. Contractor Removal. The CO may direct the removal of a contractor employee from this contract for reasons of security or misconduct. All contractor personnel are subject to Security Forces jurisdiction and the authority of the installation commander while on USAF installations.
3. Security Support Provided by AF. Security support is provided by the AF to the contractor, including use of base destruction facilities, reproduction facilities, security badges, base visitor control, investigation of security incidents, base traffic regulations, the use of security forms and conducting inspections.
4. Pass and Identification Items. The Prime Contractor shall ensure the pass and identification items required for contract performance are obtained for employees.
Base identification badges will be furnished by the SSA and/or host USA for each contractor employee upon presentation of evidence of assignment. Other required badges will be furnished by the Government as necessary to complete task requirements.
5. Base Access. The Contractor shall provide a completed 366 SFS Form 30 for each employee requiring installation access to the Contracting Representative/Sponsor within five (5) business days following contract award. The Contracting Representative/Sponsor will complete the SF From 30 and forward to the Visitor Control Center (VCC), IAW current base access requirements, 14 days before base access is requested. Failure to meet the 14-day deadline may result in delayed base access. NOTE: The SF From 30 must include the contract number.
a. The VCC will complete the required base access background checks as indicated on the SF From 30 and will notify the Contracting Representative/Sponsor of the status of the access requests. After the base access request is approved, the Contracting Representative/Sponsor shall notify the Contractor, who will notify their employees that they can obtain their installation access ID at the MHAFB VCC at Bldg. 6400.
b. The Contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Action (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting and safeguarding For Official Use Only (FOUO) material.
c. Contractor personnel shall report to an appropriate authority any information or circumstances which they are aware of and may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.
d. The Contractor shall be responsible for safeguarding all Government property.
At the end of each work period, all Government facilities, equipment, and materials shall be secured.
6. Retrieving Identification Items. The Contractor shall retrieve all identification items from employees who depart for any reason before the contract expires (e.g., terminated for cause, retirement, etc.) Additionally, the Contractor shall retrieve all identification items from employees ,or have the individuals surrender the identification media to the VCC, at termination of the contract. Personnel who still base access for other contracts must reapply for a new base access pass based on that contract.
7. Mutable Identification Items. IAW DoDM-5200.08V3_AFMAN31-101V3 and DoDM 1000.13V1, individuals holding more than one acceptable credential must use the credential most accurately depicting the capacity in which the individual is acting for the specific visit to the installation. The Contracting Representative/Sponsor must ensure all personal are briefed on this requirement.
a. Personnel (e.g., contractors) in possession of another acceptable credential (e.g., retired identification, family member identification, etc.) must complete an SF From 30 for the issuance of a new contractor identification for specific period of the applicable contract.
b. Personnel not complying with this standard can be subject to administrative actions and could be barred from the installation.
8. Security Clearance/Background Check. When applicable all personnel performing on this PWS will have a security clearance/background check equivalent to the requirements listed in the contract. Personnel will complete the appropriate documentation (SF-85, Questionnaire for Non-Sensitive Positions or SF-86, Questionnaire for National Security Positions) through National Background Investigation Services (NBIS) website. Documentation of a completed/adjudicated application is required prior to issuance of a Common Access Card (CAC).
9. Controlled/Restricted Areas. The Contractor shall implement local base procedures for entry to Air Force controlled/restricted areas where contractor personnel will work. The Contractor must request specific access to Restricted/Controlled Areas through the appropriate government representative at least 2 weeks prior to requiring access. The government representative will ensure access to Restricted/Controlled Areas is approved by owning agency and that any required training and Entry Authority Lists (EALs) are completed prior to contractor personnel entering the Restricted/Controlled Area. The Contractor is responsible for ensuring all personnel accessing the Restricted/flightline Controlled Area meet all access requirements. The contractor will be provided with a format for the EAL as needed. When applicable an AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by the sponsoring agencies Security Manager before a Restricted Area Badge will be issued.
10. Controlled Unclassified Information. The contractor shall comply with DoDI
5200.48_DAFI16-1403, Controlled Unclassified Information, for identification, protection, and training requirements of CUI. The contractor shall be responsible for training their personnel and accomplishment of the out-processing procedures identified in DoDI 5200.48_DAFI16-1403. The contractor shall comply with DoDM 5400.07_AFMAN33-302, Freedom of Information Act (FOIA) Program, requirements.
Unclassified DoD information not approved for public release on non-DoD Information Systems will be protected IAW DoDI 8582.01, Security of Non-DoD Information Systems Processing Unclassified Nonpublic DoD Information.
a. Foreign Disclosure. Due to the nature of the MHAFB mission, foreign integration and sensitivity of information and materials, the contractor will ensure all personnel are aware of and comply with foreign disclosure procedures. Release of CUI and Classified Military Information must be approved by the 366 FW Foreign Disclosure Officer (FDO).
11. Operations Security (OPSEC). The contractor shall comply with 366 FW OPSEC requirements and countermeasures to protect critical information as defined in AFI 10-701, Operations Security. Contractors shall receive unit specific OPSEC briefing prior to the start of work. Briefing documentation must be completed by the respective unit OPSEC coordinator.
The unit OPSEC personnel will provide guidance on protecting critical information, training materials and other instructions as needed. The contractor will comply with the 366 FW OPSEC Policy that imposes a 100% shred requirement of all government related paper products using NSA approved devices only.
12. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.
13. Physical Security. The Contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
a. Key Control/Access Badge Control. The Contractor shall establish and implement methods of making sure all keys/badges issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The Contractor shall not duplicate any keys issued by the Government.
b. Traffic Laws. The Contractor and its employees shall comply with base traffic regulations.
c. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on DOD Installations.
i. Domestic Violence/Lautenberg Amendment. Contractor personnel who have duties in, have access to, or are otherwise involved in the storage, issue, disposition of, or transporting firearms or ammunition shall complete DD Form 2760, Qualification to Possess Firearms or Ammunition, annually. The DD Forms 2760 shall be maintained by the CM and be made available to the KO and COR office upon request. Any person who has been convicted of a crime of domestic violence is not eligible to perform these duties. All personnel have an affirmative, continuing obligation to inform their supervisors if they have, or later obtain, a qualifying conviction. Candidates selected to fill these positions certify they have not been convicted of a crime of domestic violence, or who is subject to a protective order for domestic violence prior to assuming the duties of the position. These activities are covered by 18 U.S.C. § 922.
| SPECIFICATION SHEET |
| Concrete Foundation Materials (Concrete, Base Course, #4 Rock) |
| Mountain Home AFB, ID 26 FEB 2026 |
| 2. MATERIAL SPECIFICATIONS / SALIENT CHARACTERISTICS. |
| Delivery Schedule: The contractor shall deliver 500 U.S. tons delivered by approximately 8 May 26. |
| Delivery Schedule: The contractor shall deliver 410 U.S. tons by 8 May 26. |
| Delivery Schedule: Starting on or around 10 May 26, the contractor shall deliver 300 cubic yards of 4500 psi concrete as needed, across multiple days. 820 RHS will coordinate with contractor with 48 hours notice prior to delivery of concrete, includin... |
| b. Soils. (Base Course and 4 Rock). |
| c. Concrete. |
| 3. Military Installation Requirements |
| 6. Contractor Responsibility. |
| SECURITY REQUIREMENTS |
File details come from the government source that posted it. Updated .