This document is an amendment to a pre-renovation asbestos survey for Building 1300 at Mountain Home Air Force Base. The survey identified the following asbestos-containing materials (ACM) requiring abatement prior to renovation: flat texture on drywall, joint compound, grout associated with ceramic tile, and various 9"x9" vinyl floor tiles and mastics. The survey also assumed the presence of thermal system insulation and wiring throughout the building that may contain asbestos.
The related federal contract opportunity is for the actual asbestos abatement services required for Building 1300. The solicitation number is FA489724QC034, and it is being issued by the Department of the Air Force Air Combat Command. The description states that 366 CE at Mountain Home AFB requires asbestos abatement services for Building 1300 in accordance with the Performance Work Statement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2 combo final.pdf | ||
| Amendment 2 Bldg 1300 measurements.pdf | ||
| Amendment 1 PWS-Rev 3 B1300 Abatement-Final.docx | DOCX document | |
| PWS-Rev 3 B1300 Abatement-Final.docx | DOCX document | |
| Combo_Final.pdf | ||
| WD 2015-5513 REV 22.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1 Copyright © 2022 Atlas Technical Consultants
2791 S. Victory View Way Boise, ID 83709
208.376.4748 | oneatlas.com
November 8, 2023 Atlas File Number: B231878e
CHUCK SHOEMAKER
MOUNTAIN HOME AFB
1303 Liberator Street, Facility 1300 Mountain Home AFB, Idaho
Project: Building 1300 Pre-renovation Survey
MR. SHOEMAKER:
Atlas Technical Consultants, LLC (Atlas) has conducted a client-directed asbestos survey, including approximately 5,200 square feet of office space on the west portion of Building 1300 located at Mountain Home AFB. The survey was conducted on October 23, 2023 prior to renovation.
At the time of the survey, the building was occupied and furnished. Portions of the structure may not have been accessible, specifically wiring. Our survey identified the following Asbestos Containing Materials (ACM):
Sample Number* Material Location %
Asbestos Category1 Friable2 Quantity3
3-15, 16, 17 Flat Texture on drywall
Walls within Central Closet, NW Storage Closet
2% Chrysotile RACM No ~450 SF
4-18, 19, 20 Joint compound associated with
Flat Texture
Walls within Central Closet, NW Storage Closet
2% Chrysotile RACM No ~45 SF
7-28, 29
Grout associated with 2” Blue Ceramic
Tile
Floors in Men’s Bathroom, NW Storage Closet, Utility Closet
2% Chrysotile II No ~400 SF
13-41,42 Tan 9”x9” Vinyl Floor Tile and Black Mastic
Central Closet
8% Chrysotile in Tile, 2%
Chrysotile in Mastic
I No ~8 SF
Page | 2
2791 S. Victory View Way Boise, ID 83709
208.376.4748 | oneatlas.com
Sample Number* Material Location %
Asbestos Category1 Friable2 Quantity3
14-43, 44
Light Brown 9”x9” Vinyl
Floor Tile and Black Mastic
Engineering Flight under carpet, Central Closet
8% Chrysotile in Tile, 4%
Chrysotile in Mastic
I No
Unknown, due to location under carpet4
15-45, 46
Dark Brown 9”x9” Vinyl
Floor Tile with Black Mastic
Room 208 underneath carpet
2% Chrysotile in Tile, 8%
Chrysotile in Mastic
I No
Unknown due to location under carpet4
NA
Thermal System
Insulation
Heating unit pipes throughout offices Assumed RACM Yes
Unknown due to location within walls
NA Wiring Throughout Assumed II No
Unknown due to location within walls
*Atlas sample ID numbers referenced above represent the homogenous materials in an area followed by a sequential sample number. For example, sample 2-3 represents homogenous area two (2) with a sequential sample number of three (3). During this inspection, Atlas observed 16 homogenous materials with a total of 48 samples collected.
1 Category, as defined by NESHAP, below.
2 Friability of building material as it exists in the building, as installed, and as observed during the inspection. Condition may change depending upon demolition or renovation techniques.
3 Quantities are estimations only and must be verified by the Abatement Contactor.
4 Asbestos containing 9” x 9” vinyl floor tile was found beneath carpet through the planned renovation space. Atlas was unable to verify the amount of vinyl floor tile present without removing carpet throughout the area. Approximately 4,400 square feet of carpet was observed throughout the renovation space that may conceal asbestos containing vinyl floor tile.
The United States Environmental Protection Agency’s National Emission Standard for Hazardous Air Pollutants (NESHAP), Asbestos Final Rule currently classifies asbestos under three separate categories; they are as follows:
Category I Non-friable ACM: This category includes all asphalt roofing products and resilient flooring products (floor tile and sheet flooring). In theory, these materials consist mostly of cohesive elements which rarely release significant numbers of asbestos fibers into the air, even when they are damaged. In practice, however, roofing and flooring can become brittle or crumbly with age and be damaged enough by construction equipment to release fibers into the air during removal. At this point, the EPA requires special methods during removal and handling of the materials to protect people against fiber release. If, on a specific renovation or demolition project, there is a chance of
Page | 3
2791 S. Victory View Way Boise, ID 83709
208.376.4748 | oneatlas.com fiber release associated with roofing or flooring, we assume that special methods (abatement by removal) will be required. In the case of intentional burning, all ACM, friable or non-friable, must be removed prior to any such activities.
Category II Non-friable ACM: This category includes all other non-friable asbestos containing materials. These materials must always be removed using special abatement methods if they are expected to be disturbed or damaged in any way during renovation or removal activities.
Regulated Asbestos Containing Materials (RACM): All friable asbestos containing materials, including Category I and II materials that have become or will become friable due to renovation or demolition activities. Friable asbestos is defined as any material containing more than one percent asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
These materials must always be removed using special abatement methods prior to any renovation or demolition activity.
Atlas was able to perform some limited destructive sampling, which included exposing walls, ceilings, removing floor coverings, etc. However, Atlas cannot guarantee that hidden ACM is not still present in the building without complete deconstruction of the structure. Additional sampling may be necessary if demolition or renovation activities expose previously unidentified suspect materials. During demolition or renovation activities, a National Emission Standard for Hazardous Air Pollutants (NESHAP) Competent Person must be on site in the event additional ACM is discovered and/or disturbed as outlined in Environmental Protection Agency (EPA) regulations 40 CFR Part 61.
A representative sample of the building materials will need to be collected prior to demolition or renovation activities in order to perform lead waste characterization for disposal. Additionally, the contractor will need to follow OSHA’s Lead in Construction Rule and either provide historical data no older than one (1) year that shows similar techniques, equipment, and the same personnel completing the present tasks, or an initial exposure assessment will need to be performed during demolition or disturbance of painted components.
Atlas is pleased to have this opportunity to serve you and looks forward to a continuing relationship as your environmental consultant. If you have any questions regarding this letter or the attached analytical results, please feel free to contact Atlas at (208) 376-4748.
Respectfully Submitted, Caleb Gans Reviewed by: Jennifer Babione Environmental Technician Environmental Services Manager
Page | 1
2791 S. Victory View Way Boise, ID 83709
208.376.4748 | oneatlas.com
October 25, 2023 Atlas File#: B231878e
CHUCK SHOEMAKER
MOUNTAIN HOME AIR FORCE BASE
1303 LIBERATOR STREET, FACILITY 1300
MOUNTAIN HOME, ID 83648
Project: Building 1300 - Mountain Home AFB, ID
Date Received: 10/24/2023
Project Number: Date Reported: 10/25/2023
Atlas Technical Consultants, LLC has conducted the following survey of the above-mentioned project per the client’s request. Please reference the Cover Letter for location, quantity, and condition of each of the materials sampled below.
ASBESTOS BULK SAMPLE ANALYSIS REPORT
Sample Number
Lab Number
Sample Type, Location, and Description
Asbestos Fibers
Non- Asbestos
Fibers
Non- Fibrous
Materials Comments
1-1 B206932
Layer 1 – paint – men’s room, SE wall, S corner – tan resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery
NAD 100% other
Layer 3 – paint – cream resilient NAD 100% other
Layer 4 – orange peel texture – white semi compact powdery
NAD 100% other
Layer 5 – drywall – white semi compact powdery with fibers
NAD 10% cellulose 90% other
1-2 B206933
Layer 1 – paint – men’s room, SW wall, W corner – tan resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery
NAD 100% other
Layer 3 – drywall – white semi compact powdery with fibers
NAD 10% cellulose 90% other
1-3 B206934
Layer 1 – paint – room 201, SE wall, E corner – white resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery
NAD 100% other
Layer 3 – drywall – white semi compact powdery with fibers
NAD 10% cellulose 90% other
1-4 B206935
Layer 1 – paint – utility room, NE wall – white resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery with fibers
NAD 2% cellulose 98% other
Layer 3 – drywall – tan semi compact powdery with fibers
NAD 10% cellulose 90% other
1-5 B206936
Layer 1 – paint – engineering flight, NE wall, SE corner – white resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery with fibers
NAD 2% cellulose 98% other
Page | 2
2791 S. Victory View Way Boise, ID 83709
208.376.4748 | oneatlas.com
Sample Number
Lab Number
Sample Type, Location, and Description
Asbestos Fibers
Non- Asbestos
Fibers
Non- Fibrous
Materials Comments
Layer 3 – drywall – white semi compact powdery with fibers
NAD 10% cellulose 90% other
1-6 B206937
Layer 1 – paint – engineering flight, SW wall, central – white resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery with fibers
NAD 2% cellulose 98% other
Layer 3 – drywall – white semi compact powdery with fibers
NAD
10% cellulose, 1% fiberglass 89% other
1-7 B206938
Layer 1 – paint – breakroom, SW wall doorway – white resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery
NAD 100% other
Layer 3 – drywall – white semi compact powdery with fibers
NAD 10% cellulose 90% other
1-8 B206939
Layer 1 – paint – room 208, SW wall, S corner – white resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery
NAD 100% other
Layer 3 – drywall – white semi compact powdery with fibers
NAD 10% cellulose 90% other
1-9 B206940
Layer 1 – paint – room 208, NE wall, N corner – white resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery
NAD 100% other
Layer 3 – drywall – white semi compact powdery with fibers
NAD 10% cellulose 90% other
2-10 B206941
Layer 1 – paint – engineering flight SW wall window sill – white resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery with fibers
NAD 2% cellulose 98% other
Layer 3 – paint – cream resilient NAD 100% other
Layer 4 – joint compound – white semi compact powdery with fibers
NAD 2% cellulose 98% other
2-11 B206942
Layer 1 – paint – engineering flight, N corner – white resilient
NAD 100% other
Sample loose in bag
Layer 2 – orange peel texture – white semi compact powdery with fibers
NAD 2% cellulose 98% other
Layer 3 – paint – cream resilient NAD 100% other
Layer 4 – joint compound – white semi compact powdery with fibers
NAD 2% cellulose 98% other
2-12 B206943
Layer 1 – paint – men’s room entry - tan resilient
NAD 100% other
Layer 2 – joint compound – white semi compact powdery with fibers
NAD 2% cellulose 98% other
2-13 B206944 Layer 1 – paint – room 208 W doorway – white resilient NAD 100% other
Page | 3
2791 S. Victory View Way Boise, ID 83709
208.376.4748 | oneatlas.com
Sample Number
Lab Number
Sample Type, Location, and Description
Asbestos Fibers
Non- Asbestos
Fibers
Non- Fibrous
Materials Comments
Layer 2 – joint compound – white semi compact powdery with fibers
NAD 2% cellulose 98% other
2-14 B206945
Layer 1 – paint – 208 NW wall upper – white resilient
NAD 100% other
Layer 2 – orange peel texture – white semi compact powdery with fibers
NAD 2% cellulose 98% other
Layer 3 – mastic – tan brittle NAD 100% mastic
Layer 4 – texture – off-white semi compact powdery
NAD 100% other
Layer 5 – joint tape – cream fibrous NAD 100% cellulose
Layer 6 – joint compound – white semi compact powdery
NAD 100% other
3-15 B206946
Layer 1 – paint – central closet SW wall – cream resilient
NAD 100% other
Layer 2 – flat texture – white semi compact powdery with fibers
2% Chrysotile 98% other
Layer 3 – drywall – white semi compact powdery with fibers
NAD
10% cellulose, 1% fiberglass 89% other
3-16 B206947 Flat drywall – central closet SW wall PS
3-17 B206948 Flat drywall – NW storage closet SW wall PS
4-18 B206949
Layer 1 – paint – central closet, SW wall – cream resilient
NAD 100% other
Layer 2 – flat texture – white semi compact powdery with fibers
2% Chrysotile 98% other
Layer 3 – joint tape – cream fibrous NAD 100% cellulose
Layer 4 – joint compound – white semi compact powdery with fibers
2% Chrysotile 98% other
Layer 5 – drywall – white semi compact powdery with fibers
NAD
10% cellulose, 1% fiberglass 89% other
4-19 B206950 Flat joint compound – central closet, SW wall
PS
4-20 B206951 Flat joint compound – central closet, SW wall
PS
5-21 B206952
Layer 1 – paint – east hall N corner – white resilient
NAD 100% other
Layer 2 – 2’ x 4’ ceiling tile – tan semi compact fibrous
NAD
60% cellulose, 35% mineral wool 5% other
5-22 B206953 2’ x 4’ ceiling tile – room 201 E corner - tan semi compact fibrous
NAD
60% cellulose, 35% mineral wool
5% other
5-23 B206954
Layer 1 – paint – 208 N corner – white resilient
NAD 100% other
Layer 2 – 2’ x 4’ ceiling tile – tan semi compact fibrous
NAD
60% cellulose, 35% mineral wool 5% other
5-24 B206955
Layer 1 – paint – engineering flight, N corner
NAD 100% other
Layer 2 – 2’ x 4’ ceiling tile – tan semi compact fibrous
NAD
60% cellulose, 35% mineral wool 5% other
Page | 4
2791 S. Victory View Way Boise, ID 83709
208.376.4748 | oneatlas.com
Sample Number
Lab Number
Sample Type, Location, and Description
Asbestos Fibers
Non- Asbestos
Fibers
Non- Fibrous
Materials Comments
5-25 B206956
Layer 1 – paint – engineering flight, E corner – white resilient
NAD 100% other
Layer 2 – 2’ x 4’ ceiling tile – tan semi compact fibrous
NAD
60% cellulose, 35% mineral wool 5% other
6-26 B206957
Layer 1 – 6” ceramic tile – men’s room shower area – blue hard aggregate with fibers
NAD 2% cellulose 98% other
Layer 2 – mortar – grey cementitious granular
NAD 100% other
Layer 3 – concrete – tan cementitious aggregate granular with fibers
NAD 2% cellulose 98% other
6-27 B206958
Layer 1 – 6” ceramic tile – men’s room shower area – blue hard aggregate with fibers
NAD 2% cellulose 98% other
Layer 2 – mortar – grey cementitious granular
NAD 100% other
Layer 3 – concrete – tan cementitious aggregate granular with fibers
NAD 2% cellulose 98% other
7-28 B206959
Layer 1 – 2” ceramic tile – men’s room floor
– blue hard aggregate
NAD 100% other
Layer 2 – grout – grey semi compact powdery with fibers
2% Chrysotile 2% cellulose 96% other
Layer 3 – mortar – grey cementitious granular
NAD 100% other
7-29 B206960 2” blue ceramic tile – men’s room floor PS
8-30 B206961
Layer 1 – 4” cove base – women’s bathroom N corner – green compact pliable
NAD 100% other
Layer 2 – mastic – cream pliable NAD 100% mastic
8-31 B206962
Layer 1 – 4” cove base – women’s bathroom N corner – green compact pliable
NAD 100% other
Layer 2 – mastic – cream pliable NAD 100% mastic
Layer 3 – mastic – tan pliable NAD 100% mastic
Layer 4 – paint – off-white resilient NAD 100% other
Layer 5 – texture – white semi compact powdery with fibers
NAD 2% cellulose 98% other
9-32 B206963
Layer 1 – sheet vinyl flooring – women’s N corner – square beige compact layered resilient
NAD 100% other
Layer 2 – backing – off-white fibrous NAD 20% fiberglass 80% other
Layer 3 – mastic – cream brittle NAD 100% mastic
9-33 B206964
Layer 1 – sheet vinyl flooring – women’s N corner – square beige compact layered resilient
NAD 100% other
Layer 2 – backing – off-white fibrous NAD 20% fiberglass 80% other
Layer 3 – mastic – cream brittle NAD 100% mastic
Layer 4 – mastic – tan brittle NAD 100% mastic
Page | 5
2791 S. Victory View Way Boise, ID 83709
208.376.4748 | oneatlas.com
Sample Number
Lab Number
Sample Type, Location, and Description
Asbestos Fibers
Non- Asbestos
Fibers
Non- Fibrous
Materials Comments
10-34 B206965
Layer 1 – 4” cove base – men’s room E corner – brown compact pliable
NAD 100% other
Layer 2 – mastic – tan brittle NAD 100% mastic
Layer 3 – texture – white semi compact powdery
NAD 100% other
10-35 B206966
Layer 1 – 4” cove base – men’s room N corner – brown compact pliable
NAD 100% other
Layer 2 – mastic – tan brittle NAD 100% mastic
11-36 B206967
Layer 1 – 4” cove base – room 208 E corner – red compact pliable
NAD 100% other
Layer 2 – mastic – cream pliable NAD 100% mastic
Layer 3 – texture – white semi compact powdery
NAD 100% other
11-37 B206968
Layer 1 – 4” cove base – engineering flight, W corner – red compact pliable
NAD 100% other
Layer 2 – mastic – cream pliable NAD 100% mastic
Layer 3 – texture – white semi compact powdery
NAD 100% other
12-38 B206969
Layer 1 – paint – engineering flight, SW wall, window #1 – white resilient
NAD 100% other
Layer 2 – window caulking – white pliable NAD 100% other
Layer 3 – texture – off-white semi compact powdery
NAD 100% other
12-39 B206970
Layer 1 – paint – engineering flight, SW wall, window #2 – white resilient
NAD 100% other
Layer 2 – window caulking – white pliable NAD 100% other
Layer 3 – texture – off-white semi compact powdery
NAD 100% other
12-40 B206971
Layer 1 – paint – engineering flight, SW wall, window #3 – white resilient
NAD 100% other
Layer 2 – window caulking – white pliable NAD 100% other
Layer 3 – texture – off-white semi compact powdery
NAD 100% other
13-41 B206972
Layer 1 – 9” vinyl floor tile – central closet
– tan compact aggregate resilient with fibers
8% Chrysotile 92% other
Layer 2 – mastic – black pliable with fibers 2% Chrysotile 98% other
13-42 B206973 9” tan vinyl floor tile with black mastic – central closet
PS
14-43 B206974
Layer 1 – remnant carpet mastic – engineering flight, S corner – tan pliable with fibers
NAD 2% cellulose 98% other
Layer 2 – vinyl floor tile – light brown compact aggregate resilient with fibers
8% Chrysotile 92% other
Layer 3 – mastic – black bituminous pliable with fibers
4% Chrysotile 96% other
Page | 6
2791 S. Victory View Way Boise, ID 83709
208.376.4748 | oneatlas.com
Sample Number
Lab Number
Sample Type, Location, and Description
Asbestos Fibers
Non- Asbestos
Fibers
Non- Fibrous
Materials Comments
14-44 B206975 9” light brown vinyl floor tile with black mastic – central closet
PS
15-45 B206976
Layer 1 – remnant carpet mastic – room 208 N closet – tan pliable with fibers
NAD 2% cellulose 98% other
Layer 2 – vinyl floor tile – dark brown compact aggregate resilient with fibers
2% Chrysotile 2% cellulose 96% other
Layer 3 – mastic – black bituminous pliable with fibers
8% Chrysotile 92% other
15-46 B206977 9” dark brown vinyl floor tile – room 208 N closet with carpet mastic and black mastic
PS
16-47 B206978
Layer 1 – paint – exterior walls – multiple layers off-white over tan resilient
NAD 100% other
Layer 2 – grout – dark grey cementitious granular aggregate
NAD 100% other
Layer 3 – CMU – grey cementitious granular aggregate
16-48
B206979
Layer 1 – paint – exterior walls – multiple layers off-white over tan resilient
NAD 100% other
Layer 2 – grout – dark grey cementitious granular aggregate
NAD 100% other
Layer 3 – CMU – grey cementitious granular aggregate
Glossary of Acronyms
NAD - No Asbestos Detected TRACE - Detectable but not quantifiable PS – Positive Stop – Not Analyzed IS - Insufficient Sample -percentages may be inaccurate
Sampled by: Caleb Gans
Analyzed by: Thomas Johnson Microscopist
Sample components are identified using polarized light microscopy (PLM) coupled with dispersion staining methods as determined by visual estimation.
Small asbestos fibers may not be detected by PLM due to the resolution limitations of the optical microscope. Detecting asbestos in non-friable organically bound materials is not consistently reliable using PLM analysis. The non-detection of asbestos fibers in floor tile by PLM is of itself inconclusive. Confirmation by Transmission Electron Microscope (TEM) is recommended for negative floor tile samples. This test report relates only to the items tested in the sample as submitted to the laboratory.
Analysis method: Polarized Light Microscopy (PLM) by EPA/600/R-93/116 with Central Stop Dispersion by NIOSH 9002 American Industrial Hygiene Association (AIHA) Performance Analytical Testing (PAT) Laboratory Number 101571
Building 1300 - Site Map
NOTES:
LEGEND
Figure 1
Pre-Renovation Asbestos Survey 1303 Liberator Street, Facility 1300 Mountain Home AFB, ID
Modified from Floor Plan by: GD November 7, 2023 Drawing: B2301878e
Phone: (208) 376-4748 Fax: (208) 322-6515 Web: oneatlas.com
2791 S. Victory View Way Boise, ID 83709
Light Brown 9"x9" VFT w/ Black Mastic
9"x9" VFT Assumed Under Carpet
Grout associated with Blue 2" Ceramic Tile
Dark Brown 9"x9" VFT w/ Black Mastic
Tan 9"x9" VFT w/ Black Mastic
Flat DW Texture & Joint Compound
· Not to scale
· TSI and Wiring Assumed
Positive Throughout
· VFT - Vinyl Floor Tile
· DW - Drywall
NW Storage Closet
Utility Closet
Womens Restroom
Shower Storage
Mens Restroom
Break Room
Engineering Flight
Central Closet