UPS Q and As.docx

DOCX document 14 KB Posted

Attached to
UPS Replacement
Solicitation number
FA489720QA053
Issued by

View the file

Other files

File Type Posted
COMBOSOL-20QA053-UPS.pdf PDF
Base Access Procedures-20QA053-CS UPS.pdf PDF
SPECS-UPS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Can site provide drawings, room layout or elect one-line drawings of existing UPS system?

· No

2. Is existing UPS systems rated at 60kVA?

· Yes

3. Are we reusing existing feeders (input &output) and breakers?

· Yes

4. Is the existing UPS single feed or duel feed?

· Single

5. Is there a loading dock at the building?

· Yes

6. Is the UPS room located on first or second floor? If second floor we need elevator rating capacity?

· First

7. What’s the distance from loading dock to UPS room?

· 0 Feet

8. Is floor protection required during transfer of equipment in building during demo and install?

· No

9. Is there a clear unobstructed path from loading dock to UPS room for demo and install of equipment?

· Yes

10. Is RMP (remote monitor panel) required?

· Yes

11. Is REPO required for the UPS system?

· Yes

File details come from the government source that posted it. Updated .