Design Addendum #2 QYZH 11-8017 (Repair Life/Safety Deficiencies, Dorm 2422)
14 April 2017
This addendum is to remove the suspended ceiling work in the hallways and add the additional work of relocating any cameras moved or altered.
Specifications ‐ Section 01 00 00 (General Requirements); Revise Para B 6, delete reference to ceiling work.
‐ Section 09 51 23 (Acoustical Tile Ceilings); Remove entire section
- Section 02 41 00 (Demolition); Add paragraph B to section 3.4 Relocations. Paragraph B is as follows: “Contractor will remove and replace any security cameras that are damaged, altered, or are required to be moved due to construction. Cameras will be required to be mounted in a location to provide adequate coverage of the area. Coordinate final locations of replaced altered, removed or damaged security cameras with the Contracting Officer before installation. Interior cameras will be Hikvision 3 MP 1080p 2.8mm fixed lens Dome cameras, or equivalent. Exterior cameras will be Hikvision 3 MP 1080p 2.8-12mm varifocal outdoor dome cameras, or equivalent. All work will be required to conform to latest issue of the National Electric Code. The contractor will also be required to provide all documentation of components provided, and employees provided by the contractor will be required to possess pertinent certifications and qualifications for the work provided. All equipment required will be provided by the contractor. A commissioning test will be required to ensure system is functioning correctly. Contractor will provide an industry standard warranty on all cameras replaced.”
Design Drawings ‐ A‐120; Remove suspended ceiling work demolition and replacement. Remove keyed note 1. Contractor will still be required to replace any light bulbs/fixtures and ceiling panels damaged and/or removed for the replacement of the fan coil units.