Addendum__1 _2_August_2016.pdf
PDF 29 KB Posted
- Attached to
- CRU Flooring Bldg. 205 Federal contract opportunity
- Solicitation number
- FA4897-16-B-0006
About this file
Addendum 1 2 August 2016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_FA4897-16-B-0006.pdf | ||
| FA4897-16-B-0006-0003.pdf | ||
| FA4897-16-B-0006-0002.pdf | ||
| FA4987-16-B-0006-0001.pdf | ||
| Site_Visit_Meeting_Minutes_-_29_June_2016.pdf | ||
| Questions_and_Answers.pdf | ||
| Attachment_7_-_Certificate_of_Insurance.pdf | ||
| Attachment_2_-_Schedule_of_Material_Submittals.xls | XLS spreadsheet | |
| FA4897-16-B-0006_IFB.pdf | ||
| Attachment_5_-_Construction_Data_Sheet_-_17_Jun_15.pdf | ||
| Attachment_3_-_Wage_Determination_-_Building.pdf | ||
| Attachment_4_-_Grand_View_Gate_Information.pdf | ||
| Attachment_1_-_CRU_Floor _Hangar_205_Specifications.pdf | ||
| Attachment_6_-_Determination_of_Responsibility.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item 1:
PROJECT QYZH09-0064
Repair CRU Floor, FACILITY 205
ADDENDUM #1
2 August 2016
Contractor shall use Sherwin Williams General Polymers Industrial floor coating, or equal.
Item 2:
Contractor shall use Sherwin Williams AquArmor MCS Moisture Control System, or equal, to provide moisture vapor remediation.
Item 3:
Floor coating color shall be light grey. Provide color chips for approval.
Item 4:
Stripe the lines for building 205 in accordance with the attached diagram.
Item 5:
Section 01 11 00 – Strike paragraph 1.2.1.2
| Item 1: |
| Item 2: |
| Item 3: |
| Item 5: |
File details come from the government source that posted it. Updated .