Draft AT PWS App F List of Illustrations 1Apr21.doc

DOC document 2 MB Posted

Attached to
Aerial Targets III FY23 - Industry Day Invitation
Solicitation number
FA489021CPKCA
Issued by

About this file

This document contains draft documentation for a federal solicitation seeking aerial target services. The documentation includes a draft Performance Work Statement, draft Sections L and M of the solicitation, and appendices with figures outlining typical maintenance flows for small and large aerial targets, engine concepts of operation, range instrumentation diagrams, command destruct systems, and other technical details. The documentation appears to be in preparation for a pre-solicitation Industry Day being hosted by HQ ACC AMIC on April 8, 2021 regarding the recompete for the Aerial Target III contract. Interested parties can register for the Industry Day online to receive additional information and have the opportunity to review and provide feedback on the draft documentation prior to the April 1, 2021 planned posting of materials.

View the file

Other files

File Type Posted
Govt questions to industry 1-1 appts (SAM-FBO).pdf PDF
FA489021R0012 VID list 8Apr21 (SAM-FBO).xlsx XLSX spreadsheet
ATIII Industry Day Briefing 8Apr21 (FINAL-as briefed).pptx PPTX presentation
Draft Section M 1Apr21.docx DOCX document
Draft Section L 1Apr21.docx DOCX document
Draft AT PWS App C Pubs-Forms 1Apr21.docx DOCX document
Draft AT PWS App D GFE 1Apr21.docx DOCX document
Draft AT PWS App A Definitions 1Apr21.doc DOC document
Draft AT PWS App E GFF 1Apr21.docx DOCX document
Draft AT PWS - FA489021R0012 (Basic) 1Apr21.docx DOCX document
Draft AT Performance Incentive-Award Fee Plan 1Apr21.docx DOCX document
Draft AT PWS App G GFV 1Apr21.docx DOCX document
Draft AT PWS App H Workforce Min Quals 1Apr21.docx DOCX document
Draft AT PWS App B CDRL List 1Apr21.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT AERIAL TARGETS PWS

APPENDIX F- LIST OF FIGURES

Solicitation FA4890-21-R-0012

Figure 1. Typical SSAT Maintenance Flow

Figure 2. Typical FSAT Maintenance Flow Figure 3. FSAT F110 Engine CONOPS Figure 4. FSAT F100 Engine CONOPS

Figure 5. Range Instrumentation Overview Figure 6. GRDCS/DLS/DLS-r Sites Figure 7. Radio Systems Distribution Figure 8. Radio Sites Figure 9. Command Destruct System (Drone) Figure 10. Command Destruct System (Missile) Figure 11. APTM Data System Figure 12. RICS TPS-75 Data to AATTCS Figure 13. JTIDS Data Link

Figure 14. GRDCS Data Link to Eglin

Figure 15. Mission Video Distribution

Figure 16. Wind Site Data System

Figure 1. Typical SSAT Maintenance Flow (Sheet 1 of 3)

Figure 1. Typical SSAT Maintenance Flow (Sheet 2 of 3)

Figure 1. Typical SSAT Maintenance Flow (Sheet 3 of 3)

Figure 2. Typical FSAT Maintenance Flow (2 Pages)

Figure 3. FSAT F110 Engine CONOPS

Figure 4. FSAT F100 Engine CONOPS

Figure 5. Range Instrumentation Overview

Figure 6. GRDCS/DLS/DLS-r Sites

Figure 7. Radio System Distribution

Figure 8. Radio Sites

Figure 9. Command Destruct System (Drone)

Figure 10. Command Destruct System (Missile)

Figure 11. APTM Data

Figure 12. RICS TPS-75 Data to AATTCS

Figure 13. JTIDS Data Link

Figure 14. GRDCS Data Link to Eglin

Figure 15. Mission Video Distribution

Figure 16. Wind Site Data System

PERFORM RECEIPT/ACCEPTANCE INSPECTION

STORE TARGET

PERFORM INTEGRATED CHECKOUT

PERFORM ENGINE RUN

INSTALL MUNITIONS

INSTALL RECOVERY SYSTEM

TRANSPORT TO LAUNCHPAD

DETERMINE CONFIGURATION

IR?

SLICK WING?

EA?

INSTALL APC-4 PODS

RECEIVE TARGET THROUGH NORMAL SUPPLY CHANNELS

FUEL TARGET

PERFORM PREFLIGHT INSPECTION

CONT’D ON SHEET 2

PERFORM PREP FOR LAUNCH

PERFORM WEIGHT AND BALANCE

PERFORM RATO ALIGNMENT/ BUILD-UP/ INSTALLATION

UPLOAD PAYLOADS

SLICK?

IR?

INSTALL CHAFF/FLARE IF REQUIRED

PERFORM PRELAUNCH CHECKS

LAUNCH DRONE

EA?

INSTALL DRONE ON LAUNCH RAIL

INSTALL SQUIBS

INSTALL

DLQ-9 PODS

INSTALL CHAFF

INSTALL FLARES

CONT’D ON

SHEET 3

FROM SHEET 1

FROM SHEET 2

PERF0RM SALTWATER DECONTAMINATION

WATER RECOVERY?

PERFORM POST FLIGHT INSPECTION

LAND RECOVERY?

DRONE DAMAGED?

FIELD LEVEL REPAIR?

DEPOT LEVEL REPAIR?

PROCESS PART FOR RETURN TO DEPOT

NO DAMAGE

RECOVER

DRONE

DISPOSE OF PART LOCALLY

COMPLETE COMPOSITE REPAIR AS REQUIRED

RETURN DRONE TO SERVICE

COMPLETE FUEL SYSTEM REPAIR AS REQUIRED

COMPLETE ENGINE

REPAIR AS REQUIRED

COMPLETE AVIONICS REPAIR AS REQUIRED

GO TO FIELD LEVEL REPAIR

Aircraft Delivered

Perform acceptance inspection, which includes records check/update, BPO, borescope eng, ATP and safe flight

Is engine a “ferry” engine?

Swap engine, ship “ferry” engine back to AMARG

SAFE

Y

N

MANNED

More than 50 acft hrs remaining?

Engine Cycles remaining?

QF-16 flown Manned for MCS/FCS/PP

Swap Engine

PMT A and B; Follow

-6 inspections

Remove CAD/PAD

Begin Deman

-220 Engine?

Swap Engine to -200D

PMT A/B Current?

Maintain IAW the -6 series T.O.s and as supplemented

200 hr service life Block 15

300 hr service life Blocks 25 & 30

Maintain IAW the -6 series T.O.s and as supplemented

200 hr service life Block 15

300 hr service life Blocks 25 & 30

Request Govt disposition

Engine Start

Destruct Checks

NULLO Prep

Preflight Checks and Bomb build

Launch

NULLO FLIGHT

Drone Flight Terminated?

Recover

Is Drone Serviceable?

Drone Code D (Destroyed)

Sufficient service life?

TOWER N4 OFF SHORE DATA LINK AND ANTENNA SYSTEM

TOWER N2 ST GEORGE ISLAND DATA LINK AND ANTENNA SYSTEM

F-1 1 Apr 21

File details come from the government source that posted it. Updated .