FA489018R00090001_Amendment_1.pdf
PDF 60 KB Posted
- Solicitation number
- FA489018R0009
About this file
Amendment 1 to Solication
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment:
1. Provide consolidated list of industry Q&A - 7 Jul 18
2. Provide revised 1449, Base Year changed to 11 Months (1 Nov 19-30 Sep 20), Updated List of Attachments
3. Provide revised WDs for all locations
4. Provide revised Attachment 11 HRMPF CLIN Spreadsheet - 7 Jul 18
5. Provide revised Attachment 12 Instruction to Offerors - 7 Jul 18
6. Provide revised Attachment 12a PPI Form
7. Provide revised Attachment 13 Evaluation Criteria - 7 Jul 18 (Revised Para 3.3.1.3.)
8. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA489018R0009
X 9B. DATED (SEE ITEM 11)
19-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Aug-2018
CODE
ACC AMIC /PKA
129 ANDREWS ST. SUITE 110
LANGLEY AFB VA 23665-2788
FA4890 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA489018R0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REASON FOR AMENDMENT
Notes on Updates:
1. Q&A listing on excel for posting FBO
2. Updated 1449: Base Year changed to to 11 Months (1 Nov 18 – 30 Sep 20) and updated the List of
Attachments.
3. Attchs 3-10 replaced WDs’with current July - Aug revisions
4. Attch 11: Updated PWS date in all CLINS descriptions and revised Summary Sheet.
5. Attch 12: Updated Notice to Offerors: Removed reference to New Mexico Gross Reciepts Tax (Para
3.3.1.3).
6. Attch 12a: Updated PPI form - Corrected paragraph reference.
7. Attch 13: Updated Evaluation Criteria - Removed reference to New Mexico Gross Reciepts Tax (Para
3.3.1.3).
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
LIST OF ATTACHMENTS
DOCUMENT DESCRIPTION PAGES DATE
Attachment 1 Performance Work Statement 46 pages 10 Jul 2018 Attachment 2 ACC DD 254 (Draft) 2 pages 13 Apr 2018 Attachment 3 WD 15-5473 Rev 05 (Davis Monthan AFB, AZ) 11 pages 27 Jul 2018 Attachment 4 WD 15-5455 Rev 09 (Holloman AFB, MO) 11 pages 03 Jul 2018 Attachment 5 WD 15-4341 Rev 09 (Langley AFB, VA) 11 pages 03 Jul 2018 Attachment 6 WD 15-4493 Rev 07 (Moody AFB, GA) 11 pages 03 Jul 2018 Attachment 7 WD 15-5513 Rev 06 (Mt. Home AFB, ID) 11 pages 30 Jul 2018 Attachment 8 WD 15-5593 Rev 09 (Nellis AFB, NV) 11 pages 02 Aug 2018 Attachment 9 WD 15-4379 Rev 08 (Seymour Johnson AFB, NC) 11 pages 11 Jul 2018 Attachment 10 WD 15-4439 Rev 06 (Shaw AFB, SC) 11 pages 11 Jul 2018 Attachment 11 MPF CLIN Spread Sheet 7 pages 07 Aug 2018 Attachment 12 Instructions To Offerors 10 pages 07 Aug 2018 Attachment 12a Past Performance Information (PPI Form) 2 pages 07 Aug 2018 Attachment 12b Subcontractor/Teaming Partner Letter 1 page 06 Jun 2018 Attachment 13 Evaluation Criteria 7 pages 07 Aug 2018
(End of Summary of Changes)
FA489018R0009
File details come from the government source that posted it.