PWS_Draft_Fixed_Wing_Aircraft_Zone_1_through_4_SS.pdf

PDF 244 KB Posted

Attached to
North Warning System, Fixed-Wing Zone 1-4 Service Federal contract opportunity
Solicitation number
FA4890-14-R-0003
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 2 - Draft PWS zone 1-4

View the file

Other files for this federal contract opportunity

Other files attached to North Warning System, Fixed-Wing Zone 1-4 Service, newest first.
File Type Posted
FA4890-14-R-0003_RFP_Amendment_1.pdf PDF
Attachment_4_-_WAWF.pdf PDF
Attachment_2_-_Aircraft_Unavailablility_Record.pdf PDF
APPENDIX_2_-_Approximate_Site_Locations.pdf PDF
Attachment_5_-_NWS_Flight_Log.pdf PDF
FA4890-14-R-0003_RFP.pdf PDF
APPENDIX_1_-_Specifications_for_Fixed_Wing_Airlifts.pdf PDF
Attachment_1_-_PWS_Fixed_Wing_Aircraft_Zones_1-4.pdf PDF
Attachment_3_-_List_of_Aircraft.pdf PDF
APPENDIX_3_-_Mileage_Chart.xls XLS spreadsheet
Attachment_6_-_Zone_1-4_Cost_Summary_Report.xlsx XLSX spreadsheet
NWS_Fixed_Wing_Zone_1-4_Synopsis.pdf PDF
PWS_Draft_Fixed-Wing_Airlift_Support_for_NWS.docx DOCX document
Market_Research_FBO__-_R-0003.docx DOCX document
ATTACHMENT_1_for_Zone_1-4.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

NORTH WARNING SYSTEM

Fixed-Wing Air Transportation Service, 2,700 lbs – Zones 1 to 4

The PWS applies to fixed-wing air transportation service to the North Warning System in Canada. Appendix 1 provides specific guidance for the 2,700 lb areas of service. Appendix 2 lists approximate site locations.

1.0 DESCRIPTION OF SERVICES

1.1. The Contractor shall provide all personnel, services, equipment, tools, oil, facilities, supervision and direct materials necessary for the performance of the air transportation services hereunder, including sufficient number of ground personnel for adequate maintenance and ground operation, except as otherwise noted in this contract. The

Contractor’s price includes all costs of performance (including spares, aircraft basing, lodging, crew rotation costs, and aircraft heaters) and costs for fuel handlers, except for items covered under reimbursable expenses.

1.2. Prior to contract start the Contractor shall furnish the Contracting Officer/Contracting Officer’s Representative

(CO/COR) with the name, address, and telephone number of an agent who will serve as a liaison between the

Contractor and the CO/COR. The agent must have authority to schedule contract services. The agent shall be available by telephone at all times.

1.3. Contractor uncontrollable delays/diversions. In the event a flight is delayed/diverted because of weather or other uncontrollable factors, a minimum waiting period of four (4) hours is required before a flight can be canceled. The final decision for flight cancellation due to weather rests with the aircraft commander. Canceled flights shall be rescheduled and operated within 24 hours or as mutually agreed between the Contractor and the O&M Contractor on the direction of the Government. The requirement to give 72 hours written/email notice pursuant to paragraph 1.13

(Orders), does not apply to cancelled flights described in this paragraph 1.3. If the crew must remain overnight

(RON) through no fault of the Contractor or at the specific request of the CO/COR or HQ ACC AMIC Det 1

Representative, the Contractor will be reimbursed per diem rates consistent with Treasury Board of Canada, www.tbs-sct.gc.ca. Food and lodging arrangements are the Contractor’s responsibility at the Base of Operations.

The Government will reimburse the Contractor in accordance with the appropriate CLIN.

1.4. Flight delays/diversions caused by such events as maintenance and crew problems are considered Contractor controllable delays and shall be at the Contractor’s expense.

1.4.1. The contractor shall maintain a 95% reliability rate computed monthly by subtracting the total number of contractor-controllable delayed departures at the originating and en route stations from the contractor’s total number of scheduled departures and stating this as a percentage of total departures. Provide a matrix as referenced on attachment XX.

1.4.2. A delay shall be deemed to have occurred at the originating or en route station if the contractor’s aircraft departs the blocks more than 20 minutes after the scheduled departure time, except in those instances when the aircraft arrives at the next scheduled destination on time. Delays at originating and en route stations caused by factors beyond the control and without fault or negligence of the contractor shall be considered as contractor uncontrollable; a delay for any other reason shall be considered contractor-controllable and must be reported using the Aircraft Unavailability Record as specified in Attachment XX. The contractor uncontrollable delay time experienced at the origination and en route stations on a mission shall be added to the scheduled departure time at the next en route station for purposes of determining the scheduled departure time at that station on that mission.

1.4.3. Failure to maintain a 95% schedule reliability rate will be reason for terminating the contract pursuant to FAR

52.212-4; however, nothing in this paragraph shall limit the right of the Government to terminate this contract for cause for other reasons or to limit any other rights and remedies provided the Government by law or under this contract.

1.4.4 The contractor may refuse any mission for safety reasons. However, missions must be rescheduled and flown as agreed to by NWS O&M Contractor.

1.5. The Contractor will obtain a flight number from the Operations & Maintenance (O&M) Contractor prior to leaving the base of operations. This flight number will remain unchanged until the aircraft returns to where the mission originated. Note that each trip must be assigned a new flight number (the next number in sequence).

1.6. The aircraft offered for the performance of this contract shall be Instrument Flight Rules/ Visual Flight Rules

(IFR/VFR) equipped. The type of aircraft will depend on weather, urgency of requirements, estimated time to perform the work and absolute limitations of civil twilight.

1.7. The Contractor shall be required to carry a survival kit and two fire extinguishers on the aircraft.

1.8. The Contractor shall be responsible for the removal, from all North Warning System (NWS) sites, of all hazardous, unused and waste materials owned or generated in the operations of the Contractor owned aircraft.

Examples of such materials include, but are not limited to, unserviceable aircraft component and parts, used engine fluids, and any used or unusable petroleum, oil, and lubricants (POL) products.

1.9 The Contractor shall provide a daily flight log within 24 hours upon completion of each mission to the NWS

O&M Contractor through the Logistic Support Site (LSS) Manager, if possible, or a commercial facility. Flight Log will include any required per diem, lodging and landing fees. In addition, the contractor shall perform a visual fuel sampling, a clear and bright test, each time NWS fuel is taken and the flight log will be annotated to reflect fuel sampling has been accomplished. If commercial fuel is acquired, then the contractor shall annotate the cost and location of where the fuel was purchased. (CDRL).

1.10. PROHIBITED ACTIVITIES

1.10.1. All air carrier employees are prohibited from possessing alcoholic beverages on any North Warning System site.

1.10.2. Weapons are normally prohibited on North Warning Sites. The Contractor must ensure that weapons are secured at all times in a designated area as determined by the O&M Contractor.

1.10.3. Smoking is allowed in designated areas only.

1.11 LIABILITY FOR PERSONAL CARGO.

Contractor shall be responsible for the loss and/or damage to the passenger baggage and personal equipment while such items are in his custody or on board his aircraft. Liability for these items is limited to the actual value thereof, not to exceed $2,800.00 US per passenger. In the event it should become necessary to off load passengers at any location or station, other than at the direction of the Contracting Officer, the Contractor shall be responsible for such off loading, passenger care, and safeguarding personal baggage from loss, theft, and/or weather damage, reloading, and all costs incident to such services until such time as the Contractor moves or causes to be moved such passengers to their intended destination or to such other location as directed by the Contracting Officer. The

Contracting Officer shall be notified immediately of any off loading.

1.12. RESPONSIBILITY FOR GOVERNMENT CARGO.

To the extent insurance required by this contract is not required for payment of third party claims, the balance of said insurance shall apply to Government cargo loss, damage or destruction thereto. In the event of an accident, the

Contractor shall be responsible for providing continuous protection of all cargo aboard the aircraft and for delivery of the cargo to the point designated by the COR or HQ ACC AMIC Detachment 1.

1.13. ORDERS.

The CO will issue all task orders. After task orders are issued, the Operations and Maintenance Contractor will provide the Contractor with a tentative flight schedule for the following month. At least 24 hours prior to the scheduled departure time, the O&M Contractor and the Contractor shall mutually agree to the actual flight departure time. The Contractor shall not initiate any action to perform any work under this contract, which would exceed the amount on the delivery order. The contractor will be paid a flat rate to position/deposition aircraft for missions in

Zone 2, Cambridge Bay in accordance with the rate in CLIN XXXX (and all corresponding Option year CLINs).

Positioning/depositioning will not be paid in Zone 1, Inuvik. The government shall provide at least 72 hours written/email notice to the contractor of any missions ordered that are not listed on the monthly schedule. If 72 hours notice is not given (except as provided in paragraph 1.3), (and all corresponding Option year CLINs). The contractor shall have the aircraft positioned and ready to take on passengers or cargo in accordance with this PWS and shall meet all scheduled take-off times. The CO/COTR/designated representative reserves the right to supersede or deny any flight requests made by the NWS O&M contractor to the Contractor if the CO/COTR/designated representative determines that the request is not in compliance with NWS Concept of Operations that have been agreed to by the

USAF and CF. It reserves the right to schedule a flight if deemed it serves the interests of the USAF/CF for the

NWS; this request will supersede any requests made by the NWS O&M contractor

1.14. MINISTRY OF TRANSPORTATION (Transport Canada)

Following the completion of any Civil Aviation Agency inspection, copies of the inspection report shall be forwarded to the Contracting Officer, HQ ACC AMIC/PKB, 11817 Canon Blvd. Ste. 306, Newport News, VA USA

23606.

2. SERVICE DELIVERY SUMMARY

PERFORMANCE

OBJECTIVE

PWS

PARAGRAPH

PERFORMANCE

THRESHOLD

METHODS OF

SURVEILLANCE

Perform all scheduled missions.

1.1

100% of the time.

100% Inspection, Monthly Summary

Report The Contractor shall maintain on-time schedule reliability.

1.4.1

95% of the time on an

Annual basis

100% Inspection, Monthly Summary

Report On-time delivery and accuracy of CDRLs

1.9, 4.9

98% on time delivery

100% Inspection

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. The Canadian Government, through the NWS O&M Contractor, shall provide:

3.1.1. 115V electricity and electrical hook-up, at some NWS sites.

3.1.2. Coordination of all hazardous material shipments with the Contractor.

3.1.3. Aviation fuel and refueling capability is available and will be provided at no cost to the airlift Contractor at

Cambridge Bay only. Fuel from this location shall be given the priority in scheduling refueling for aircraft vice commercial. Once the efficiency is determined and fuel is still purchased at a commercial location in direct support of this contract, the cost will be reimbursed.

3.1.4 Government personnel will provide the contractor a list of personnel authorized for flight prior to boarding.

The contractor shall not permit any unauthorized personnel to board the aircraft.

3.2. FUEL

3.2.1 The Contractor shall obtain written authorization from National Defense Headquarters, Attn: Director

Aerospace and Engineering Project Management (DAEPM), Radar & Communications System (R&CS 24), MGen

George R. Pearkes Building, Ottawa, Ontario K1A 0K2 prior to establishing a fuel “cache” at any NWS sites. The request shall reference applicable contract number.

3.2.2 The aviation fuel used at NWS sites is JET A-1 (A-3) fuel with three additives consisting of a fuel system icing inhibitor (FSII), static dissipater and a corrosion inhibitor. This fuel has a pour point of -52C degrees and has been designated as JET A-1 (A-3).

3.3. Hangar space for maintenance repairs and overnight storage of aircraft is available at Cambridge Bay LSS site.

3.4. Food and lodging is provided at Cambridge Bay and Hall Beach for Contractor personnel involved in the performance of this contract. The Contractor is responsible for their toiletries and towels. (Washer and dryers are available.) When operating from Iqaluit, Inuvik, or Goose Bay, food and lodging will be at the Contractor’s expense on a NON-cost reimbursable basis. Food and lodging at all other locations will be at the Contractor’s expense on a cost reimbursable basis by the government when government accommodations are not available.

3.5. Landing Fees. In the event the Contractor is directed by the CO/COR or HQ ACC AMIC Det 1 Representative to stop at a commercial airport, or other points, and is assessed a landing fee, the government will reimburse the

Contractor for such landing fees and all en route navigational service charges.

4. GENERAL INFORMATION

4.1. During the last week of each month, the NWS O&M Contractor will provide the Contractor with a tentative flight schedule for the following month. At least 24 hours prior to the scheduled departure time, the O&M

Contractor and the Contractor shall mutually agree to the actual flight departure time.

4.2 NOTICE OF ACCIDENTS

4.2.1. DOD Missions. When a Contractor’s aircraft is involved in an accident or incident in support of a DOD mission as defined in 49 CFR, Part 830, the Contractor will transmit the following information by the most expeditious means available, to the Transportation Branch (757-225-2377) at HQ ACC AMIC/PLGT, 11817 Canon

Blvd. Ste. 306, Newport News, VA USA 23606. On the next business day, notify the CO at HQ ACC AMIC/PKB

(757-225-3913), the COR at HQ ACC AMIC/PLG (757-764-2377), CCC (613-947-9663) and the HQ ACC AMIC

Detachment 1 (613)297-5015 or 613-296-2149).

4.2.1.1 Carrier and trip number

4.2.1.2 Aircraft type and number

4.2.1.3 Date and time of the accident

4.2.1.4 Last point of departure and point of intended landing of the aircraft.

4.2.1.5 Nature of the accident and the extent of known damage to the aircraft.

4.2.1.6 Total number of crewmembers and passengers on board.

4.2.1.7 Number of injured and fatalities aboard the aircraft.

4.2.1.8 Condition of baggage or government-owned material, if any, on board.

4.2.2 Notice of Accidents - Non - DOD Missions. When a contractor's aircraft is involved in an accident or incident in support of a non-DOD mission, as defined in 49 CFR, Part 830, the contractor will transmit the information in paragraph 4.2.1 above, by the most expeditious means available on the next business day to HQ ACC AMIC/PLGT

(757-225-2377), the CO at HQ ACC AMIC/PKB (757-225-3913), the COR at HQ ACC AMIC/PLG (757-764-

9490), CCC (613-947-9663) and the HQ ACC AMIC Detachment 1 (613-297-5015 or 613-296-2149).

4.2.3. Aircraft Medical Incidents. Report all aircraft medical incidents in flight, or while DOD passengers are under control of the aircraft captain, to the HQ ACC AMIC Detachment 1 (613) 297-5015 or 613-296-2149within 48 hours.

4.2.4. DOD Casualties. In cases where a death occurs on a Contractor’s aircraft, the following information shall be furnished via telephone to the numbers listed below: Name, Social Security Number (SSN) and component of service identified as Army-USA, Air Force USAF, Navy-USN, Marine Corps-USMC, Coast Guard-USCG. The following is a list of phone numbers for service casualty offices:

US Army: (800) 626-3317 US Navy: (800) 368-3202

US Marines: (800) 847-1597 US Air Force: (800) 433-0048

Coast Guard (USCG):

Atlantic Area Op’s Center: (757) 398-6390 (accidents east of Mississippi River)

Pacific Area Op’s Center: (510) 437-3701 (accidents west of Mississippi River)

A scanned informational copy shall be provided via email to the Transportation Branch (757-225-2377) at HQ ACC

AMIC/PLGT at accamic.lg@langley.af.mil.

4.3. RESERVED

4.4 INSURANCE

The contractor shall procure and maintain a level of insurance coverage commensurate with the commercial standard and in accordance with the host nation’s statutory limits during the entire period of performance under this contract.

4.5. NOTICE OF POST-AWARD/PRE-PERFORMANCE CONFERENCE

The Contractor shall attend a Post-Award conference conducted by the CCC (PWGSC) with the HQ ACC AMIC

Contracting Officer, Air Combat Command Contracting Officers Representative and HQ ACC AMIC Detachment 1 personnel in attendance. The Contractor shall be notified of the exact time and location of the conference at least 2 weeks prior to the scheduled conference date. The contractor shall bear all costs associated with this conference attendance.

4.6. PERFORMANCE OF SERVICE DURING CRISIS DECLARED BY THE PRESIDENT OR SECRETARY

OF DEFENSE OR OVERSEAS COMBATANT COMMANDER

In the event of a declared crisis, the Contractor is not relieved from the requirements of this contract. The contractor providing services designated as essential by the North Warning System Office (NWSO) or Air Combat Command

(ACC) is expected to use all means at its disposal to continue to provide services, in accordance with the terms and conditions of the contract during periods of crisis, or until appropriately released by the contracting officer.

4.7. METHOD OF MEASURING DISTANCE

In the event a flight is diverted diverted or put in a holding pattern due to adverse weather conditions or other direction by the Government, payment will be calculated by multiplying flight time minutes times the block speed of the aircraft (see Attachment 3, List of Aircraft) then divided by 60, then multiplied times the unit price in the schedule. Flight time minutes shall be computed from block out to block in. Payment will then be made in accordance with the schedule.

4.8. CANCELLATIONS: In the event a flight is canceled prior to the scheduled departure time due to contractor controllable reasons, movement of any aircraft into and out of scheduled service will be at the Contractor's expense. The Contractor shall notify the Contracting Officer Representative (COR) at (757) 225-2377 or Det 1.

at(613) 613-297-5015 or 613-297-2149immediately of any delay of aircraft departure including the reason thereof.

Should the Government cancel a scheduled flight after the contractor's aircraft has already departed (has left the ground) its home base enroute to position, or has already positioned for a scheduled flight when notice of cancellation is given, the Government shall reimburse the contractor for the entire scheduled positioning leg and depositioning leg, even if the aircraft does not arrive at the positioning destination, at the mileage rate set forth in the mileage CLIN in the schedule. The government will incur no liability for costs until the aircraft departs the base of operations to position at the scheduled location.

4.9. Cost Summary Report - The Contractor shall submit a bi-monthly flying/cost summary report containing the following information: (CDRL)

4.9.1. Total hours/miles billed on current invoice and copy of flight logs for that period.

4.9.2. Total passengers and total cargo carried.

4.9.3. Total of reimbursable expenses on current invoice and applicable receipts.

4.9.4 Contract year to date total of hours/miles and reimbursable expenses expended per CLIN and SUBCLIN and remaining balances per contract.

4.10. The contractor shall provide a notice, by CLIN, when 75 % of the estimated quantity or total funded amount have been used. This notice shall be sent via fax or e-mail simultaneously to the HQ ACC AMIC/PKB, CCC, and

HQ ACC AMIC/PLGT and AMIC Detachment 1.

4.11. RESERVED

4.12. The airlift contractor shall supervise loading the aircraft and be responsible for proper weight and balance of all cargo loaded on the aircraft. Actual weight shall be used for each mission when transporting passengers and or cargo. Actual weight is defined as interrogated or scaled weight when transporting passengers. Scaled weight shall be used when loading and transporting cargo. An additive weight of 20 lbs. per person may be used for hand carried baggage.

APPENDIX 1

1.0 SPECIFICATIONS FOR FIXED WING AIRLIFTS -

1.1 Cargo and Personnel Movement. The Contractor shall provide multi-engine fixed wing aircraft equipped with removable and/or foldable passenger seating with seat belts, which provides seating for at least eight passengers.

The aircraft shall also have the capacity of transporting any combination of passenger(s) and/or cargo totaling a minimum of 3,300 or 2,700 lbs pounds, depending on CLIN requirements. The type of aircraft ordered will be the smallest aircraft commensurate with mission requirements. This payload does not include aircraft crewmembers and

Contractor equipment required for the performance of this contract. The aircraft shall be capable of transporting the total payload a range of 350 GCSM nonstop under IFR conditions. The aircraft shall be in compliance with established Canadian safety requirements and be equipped with tie-down devices to restrain the movement of cargo.

1.2 All flights shall originate at the applicable LSS. The Contractor shall be responsible for transporting personnel and cargo from origin to Long Range Radar (LRR) sites. (NOTE: The airstrips at the LRR sites are gravel inactive airstrips that are not maintained and are not under NOTAM Regulations). Requests for cross-zone flying shall be submitted to either the CO/COR or HQ ACC AMIC Detachment 1 for review and approval prior to flying the mission.

1.3 Zone 1 and 2 (INUVIK & CAMBRIDGE BAY).

1.3.1 - Inuvik. From LSS Inuvik to Single Point (Bar-2) Tuktoyuktuk (Bar-3), Cape Parry (Pin-M), and return to

Inuvik by any combination of intermediate stations. .

1.3.2. Cambridge Bay. From LSS Cambridge Bay (Cam-M) to Lady Franklin PT (Pin-3), Shepherd Bay (Cam-3) and communities of Gjoa Haven (Cam-CB) and Coppermine and return to Cambridge Bay by any combination of intermediate stations.

1.4 Zone 3 and 4 (HALL BEACH & IQALUIT)

1.4.1 The routes are from LSS Iqaluit to Dewar Lakes (Fox-3), Cape Hooper (Fox-4),Broughton Island (Fox 5), Cape Dyer (Dye-M), Brevoort Island (Baf-3), Resolution Island (Baf-5) and communities of Pangnirtung and

Broughton Island, LSS Hall Beach NWT (Fox-M), Pelly Bay (Cam-4) and Dewars Lakes (Fox-3) and communities of Spence Bay and Pelly Mission and return to Iqaluit by any combination of intermediate sites.

APPENDIX 2

APPROXIMATE SITE LOCATIONS

Zone Type Site Code Site Name Latitude Longitude

1 SRR Bar-1 Komokuk Beach 69 35' 42.6" 140 10' 48.9"

1 LRR Bar -2 Shingle Point 68 55' 34.0" 137 15' 55.0"

1 SRR Bar -3 Tuktoyaktuk 69 26' 36.8" 132 59' 56.6"

1 SRR Bar -4 Nicholas Peninsula 69 55' 29.0" 128 58' 27.4"

1 SRR Bar -B Stokes Point 69 19' 48.7" 138 44' 13.4"

1 SRR Bar -BA3 Storm Hills 68 58' 39.4" 133 56' 29.6"

1 SRR Bar -DA1 Liverpool Bay 69 36' 15.1" 130 53' 37.7"

1 SRR Bar -E Horton River 70 00' 57.1" 126 56' 37.5"

1 LSS LSS-I Inuvik 68 18' 15" 33 28' 58.0"

1 SRR Pin-1BD Keats Point 69 40' 21.8" 121 40' 21.3"

1 SRR Pin -1BG Croker River 69 15' 31.5" 119 13' 13.8"

1 LRR Pin –M Cape Parry 70 10' 17.0" 124 43' 30.0"

2 SRR Cam-1A Jenny Lind Island 68 44' 57.9" 101 51' 10.0"

2 SRR Cam -2 Gladman Point 68 40' 48.9" 97 48' 40.5"

2 LRR Cam -3 Shepherd Bay 68 47' 34.0" 93 26' 27.0"

2 SRR Cam -A3A Sturt Point North 68 57' 48.0" 103 51' 10.0"

2 SRR Cam -B Hat Island 68 19' 05.5" 100 04' 12.7"

2 SRR Cam –CB Gjoa Haven 68 38' 08" 95 50' 59"

2 SRR Cam -D Simpson Lake 68 35' 41.3" 91 57' 25.5"

2 LSS LSS-C Cambridge Bay 69 07' 18.0" 105 08' 07.0"

2 SRR Pin -2A Harding River 68 50' 07.3" 116.57' 58.4"

2 LRR Pin -3 Lady Franklin 68 28' 45.0" 113 13' 32.0"

2 SRR Pin -CB Bernard Harbour 68 45' 19.3" 114 56' 23.4"

2 SRR Pin -DA Edinburgh Island 68 29' 10.1" 110 51' 53.5"

2 SRR Pin -EB Cape Peel West 69 01' 08.7" 107 49' 23.1"

Coppermine 67 49’ 00” 115 08’ 36”

3 SRR Cam -4 Pelly Bay 68 26' 13.4" 89 43' 33.3"

3 SRR Cam -5A Cape McLoughlin 68 39' 52.7" 85 35' 28.8"

3 SRR Cam -FA Lailor River 69 06' 39.0" 83 32' 23.0"

3 SRR Fox-1 Rowley Island 69 04' 01.9" 79 03' 53.9"

3 SRR Fox -2 Longstaff Bluff 68 53' 54.6" 75 08' 27.4"

3 LRR Fox -3 Dewar Lakes 68 39' 01.0" 71 14' 05.0"

3 SRR Fox -A Bray Island 69 13' 26.2" 77 13' 49.1"

3 SRR Fox -B Naduardjuk Lake 68 37' 11.3" 73 12' 41.0"

3 SRR Fox -CA Kangok Fiord 68 38' 51.5" 69 07' 45.5"

3 LSS LSS-F Hall Beach 68 46' 27.0" 81 14' 27.0"

4 SRR Baf-2 Cape Mercy 64 57' 27.5" 63 34' 40.4"

4 LRR Baf -3 Brevoort 63 20' 20.0" 64 09' 28.0"

4 SRR Baf -4A Loks Land 62 30' 22.7" 64 31' 04.5"

4 SRR Baf -5 Resolution Island 61 35' 47.6" 64 38' 19.2"

4 LRR Dye-M Cape Dyer 66 39' 52.0" 61 21' 27.0"

4 SRR Fox -4 Cape Hooper 68 28' 20.9" 66 47' 55.4"

4 SRR Fox -5 Broughton Island 67 32' 07.7" 63 47' 20.1"

4 LSS LSS-Q Iqaluit 63 45' 23" 68 33' 21"

Pangnirtung 66 08' 43" 65 42' 47"

Coppermine 67 49' 00" 115 08' 36"

FOX-M 68 46' 27" 81 14' 27"

Pelly Bay 68 32' 04" 89 48' 29"

Nain 56 32' 57" 61 40' 49"

Hopedale 55 26' 54" 60 13' 43"

Makkovik 55 04' 37" 59 11' 11"

SRR = Short Range Radar

LRR = Long Range Radar

LSS = Logistic Support Site

File details come from the government source that posted it. Updated .