QA Walk In Blast Booth - 21 June 2021 - FINAL.pdf

PDF 111 KB Posted

Attached to
Walk In Blast Booth Federal contract opportunity
Solicitation number
FA488721Q0022
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Walk In Blast Booth, newest first.
File Type Posted
Walk-in Blaster SOW - 21 June 2021 - FINAL.pdf PDF
Solicitation Amendment FA488721Q00220003 SF 30.pdf PDF
Solicitation Amendment FA488721Q00220002 SF 30.pdf PDF
QA Document_Walk In Blast Booth.docx DOCX document
Blast Room SOW - 14 June 2021.pdf PDF
Solicitation Amendment FA488721Q00220001 SF 30.pdf PDF
Solicitation - FA488721Q0022.pdf PDF
LAFB Walk In Blast Booth SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA488721Q0022 Question and Answer Document

Question 1 - What is the required delivery schedule after award?

- 180 days after contract award.

Question 2 - Is the supplier required to comply with requirements outline in the USAF Corrosion Control Facility Reference Guide?

- Yes, the supplier is required to comply with requirements outlined within the USAF Corrosion Control Facility Reference Guide.

Question 3 - Who will perform abatement (removal of Hexavalent Chromium) of the existing facility and the existing equipment prior to equipment removal?

- The Contractor is responsible for the abatement and must accomplish abatement of Hexavalent Chromium and any hazardous waste/universal waste in accordance with local, state, and federal laws.

Question 4a - Exactly where will the supplier need to place the equipment once removed from the existing facility?

- Equipment disposal is the responsibility of the contractor. The contractor shall determine their own off-base disposal procedures.

Question 4b - Will the removed equipment require any specific packaging, palletizing, protection, etc. upon removal, or simply placed on the ground?

- Equipment packaging shall be determined by the contractor to best fit their disposal methods. However, equipment that may contain chromium should be wrapped in plastic.

Question 5 - Does the 3/8" safety glass include or exclude internal glass wire reinforcement?

- Yes, the safety glass should include wire reinforcement.

Question 6 - Is the "electronically controlled pulse system" to be a "timed-pulse system with magnahelic gauge" or an "auto-pulse system with photohelic gauge"?

- The only requirement is that the electronically controlled pulse system is an “auto-pulse” system.

Question 7 - Do slide gates require internal sealing?

- Yes, slide gates shall be internally sealed.

Question 8 - Please confirm the Govt. is wanting the pay the added expense associated with "powder coating" when an industrial grade finish will be adequate for Arizona environment?

- The government does not require powder coating to be considered acceptable.

Question 9a - Does a "cleanroom approved" Air Shower mean an Air Shower that meets only those technical specifications listed in the SOW under Air Shower?

- Yes, the Air Shower is only required to meet those technical specifications listed within the SOW.

Question 9b - Does the Govt. want an Air Shower that is NIOSH compliant?

- No, NIOSH compliance is not required. The Govt. wants an Air Shower as specified in the SOW.

Question 10: What is the voltage, amperage and phase of the available power from the building?

- The available power is 277/480 volts, 225A amps, 30 phase (23 Open Breaker spaces).

Question 11: Please confirm that bidders can provide equivalent or better equipment for items specified in the new SOW that are brand name specific?

- The previously posted SOW has been updated to remove brand-specific requirements.

Quoters are to provide equivalent or better technologies to those specified in the SOW.