SOW_NUEX_09-1308_Clean_and_Repair_Well__7_Pump.docx
DOCX document 31 KB Posted
- Attached to
- Well 7 Inspect/Repair at Luke AFB
- Solicitation number
- FA4887-16-T-0013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section_M.docx | DOCX document | |
| Section_L.docx | DOCX document | |
| FA4887-16-T-0013-P00001_Well_7_Inspection_and_Repair.pdf | ||
| FA4887-16-T-0013_Well_7_Solicitation.pdf | ||
| SCA_WD.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
NUEX 09-1308
Clean And Evaluate The Existing Condition Of Well #7 Luke Air Force Base, Arizona 01 July 2016
1. OVERVIEW
The Arizona Department of Environmental Quality (ADEQ) standard for maximum Nitrate levels is 10mg/L (10ppm). The maximum level for Arsenic is .01mg/L (10ppb). Well # 7 has not been in use since June of 2009. At that time the nitrate levels were well under the limit. Arsenic levels were above the limit. We have no data from that time period, but recent samples indicate that Nitrate levels are approximately 4ppm and Arsenic levels are approximately 20ppb, twice the limit. The Arizona registration number for this well is 55-609884. It is 1,144 feet deep. The static water level is approximately 327 feet below ground level. It has an 18” diameter casing, and discharges into an 8” line. There are four (4) reported screen intervals at 534-561, 564-572, 904-922, and 965-975 feet below ground. Other wells on the base range from 740 to1150 feet in depth. The well was placed in service in 1968. It is 48 years old. The eight inch discharge line is currently capped. The pump can however discharge through a 4” bypass line that feeds into a storm drain.
2. DESCRIPTION OF WORK
2.1. This project includes all of the necessary tools, equipment, and manpower needed in order to clean, remove, test, evaluate, and analyze the condition of Well #7.
2.2. Performance Period: All work shall be completed within 183 calendar days after the Notice to Proceed (NTP) is issued.
2.3. Hazardous Material Abatement: No asbestos, lead or other hazardous substances are known to exit. The Contractor shall report any suspicious material immediately to the Contracting Officer
2.4. Design Drawings: This project does not require design drawings, but will require a simple one-line diagram indicating the locations for zonal sampling and keynotes regarding flow spinner flowmeter logging is to be conducted.
2.5. Calculations: In order to identify where the zone specific samples should be collected, a spinner flow meter tool will be lowered down the 3-inch diameter access tube into the well casing below the pump intake at three (3) different line speeds. Data collected will include the depth, line speed and impeller rotation rate of the spinner tool. With this data, the quantity of water entering the well casing, along with the well profile will be calculated. This information will then be used to identify the location of the specific zonal sampling points.
2.6. Survey: The contractor shall perform two (2) down-well video surveys; one before cleaning begins, and one after cleaning is complete. Details of how the survey shall be conducted are listed in paragraph 2.7.4 below.
2.7. General Construction:
2.7.1 Demolition: The Government does not expect or foresee any demolition in this project, but the Contractor shall contact the Contracting Officer (CO) or his/her designated representative if any demolition becomes necessary as a part of this project.
2.7.2 Well Evaluation: Pull existing pump equipment for access into the well. Inspect the pump column pipe, pump bowls, and ancillary equipment. Provide recommendations for repair, cleaning, and/or replacement.
2.7.3 Cleaning: Remove and clean the dedicated pumps. Mechanically clean the well casings/screens/perforations in order to remove scale and encrustation. Chemically clean the well casing in order to remove biocide buildup.
2.7.4 Video Survey/Log: Develop a video survey/log before and after the mechanical/chemical cleaning is completed. Perform Down Well Video Survey to:
2.7.4.1 Confirm total depth and diameter of the well.
2.7.4.2 Determine the static water level.
2.7.4.3 Evaluate the condition of the casing for breaks, tears and buckles.
2.7.4.4 Determine the location and conditions of the perforations.
2.7.4.5 Evaluate the amount and location of encrustation
2.7.5 Spinner Flow Meter Log: Conduct spinner flowmeter logging in order to identify distinct flow zones, their flow rates, and total contribution into the well.
2.7.6 Collect and analyze depth specific water samples from flow zones specified by the government after evaluating the results from the spinner flow meter log.
2.8 Zonal Sampling:
2.8.1 Install test pump equipment in order to collect down well zonal water samples below the pump intake. Existing pump-head equipment will not permit access of a spinner logging tool and sampling equipment.
2.8.2 Conduct a down well spinner log while pumping at a constant rate.
2.8.3 Conduct zonal sampling after 12 to 24 hours of constant pumping.
2.8.4 Analyze a minimum of five (5) dynamic zonal samples for arsenic, fluoride, nitrate, and Total Dissolved Solids (TDS)
2.8.5 Review the zonal sampling data in order to determine/recommend which zones might be sealed off in order to improve the pumped ground water quality.
2.9 Testing And Analysis:
2.9.1 The Contractor shall ensure the selected laboratory is certified by the Arizona Department of Health Services. The Contractor shall analyze and test environmental samples using standardized methods in current editions of approved testing references such as SW-846,”Test Methods of Evaluating Solid Wastes, Physical/Chemical Methods”; 40CFR 136, “Guidelines Establishing Test Procedures for the Analysis of Pollutants”; and ”Standard Examination of Water and Wastewater”. The Contractor shall ensure the defensibility of test and analytical results through execution and scientifically sound activities as outlined in the appropriate portion of the approved Sampling and Analysis Plan (SAP).
2.9.2 The Contractor shall perform services in support of the AF Safe Drinking Water Surveillance Program and in compliance with the Safe Drinking Water Act (SDWA) In addition, the Contractor shall also comply with all applicable federal, state and local laws/regulations. All DoD and AF directives including but not limited to AFI48-144, AFI32-1066, AFI32-1067, and AFI10-246 apply as well.
3. GOVERNMENT FURNISHED INFORMATION, PROPERTY, OR SERVICES
3.1. The Contractor is responsible for reviewing all available information and forming their independent, professional conclusions/interpretations of the equipment conditions and/or requirements that are necessary to meet the requirements in the Statement of Work.
3.2. Upon the Contractor’s request, the Government will provide all prior and relevant research, studies, documents, plans, drawings, monitoring reports, permit applications and permits connected with this project.
4. GENERAL INFORMATION
4.1. GENERAL
4.1.1 The contractor shall furnish all materials, equipment, and personnel necessary to design, manage, and accomplish the project. The Contractor shall thoroughly review the SOW and Request For Proposal (RFP) for constructability, then advise the contracting officer of potential problem areas prior to submitting a cost proposal. No alterations, additions or deletions shall be made unless prior written approval is given by the Contracting Officer. Under no circumstances is the Contractor to begin any work on the project until a Notice to Proceed (NTP) is issued by the Contracting Officer.
4.1.2 The Contractor shall identify and comply with applicable federal, state, and local environmental laws, statutes, and regulations, as applied to each installation through the appropriate EO’s AF/Military instructions, manuals, handbooks, regulations, guidance, and policy letters. This includes but is not limited to AFI 32-7001, as well as American Petroleum Institute Codes, National Association of Corrosion Engineers, National Fire Protection Agency, Steel Structures and Painting Counsel, Uniform Fire Code, and National Environmental Accreditation Conference. All work must meet or exceed acceptable standards of the building trades.
4.2. SITE VISIT
The Contractor shall inspect the site where services are to be performed. This site review shall satisfy the Contractor’s need to identify all general and local conditions that may affect the cost of the contract. Failure to inspect the site will not constitute grounds for claims after contract award.
4.3. SPECIAL DELIVERY/WARRANTY
4.3.1. N/A.
4.4. REQUIRED SUBMITTALS
4.4.1. Submittals are required for this project and are listed along with their due dates on the AF Form 66, Schedule of Material Submittals. All Submittals must be on an AF3000
4.4.2. Project Schedule: within one week of Notice to Proceed, provide a legible project schedule on AF Form 3064 in printed and PDF format for construction services to include dates of anticipated work completion.
4.4.3. Contractor Quality Control Reports shall be drafted in accordance with Luke Master Specifications, Section 014500. Provide such reports to the government project manager by COB of the first work day of the following week.
4.4.4. A written safety program shall be submitted prior to work start in accordance with Luke Master Specification, Section 010700.
4.4.5. When required per Schedule of Submittals, Contractor shall submit on an AF Form 3000 all product, material, shop drawing and designs to include Material Safety Data Sheets (MSDS) to the Contracting Officer for approval before any and all items are brought to or installed on project sites at Luke AFB.
4.4.6. Contractor shall submit on Luke AFB Form 317 “Contractor’s Reporting Environmental Entry Form” all products used on this project. These items will be tracked monthly and reports will be turned into Mr. Oscar Mabry or Ms. Teri Wesley at the Hazmat office phone number (623) 856-4748 or 4749.
4.4.7. Demolition List: the Government reserves the right to salvage any/all equipment or materials prior to construction start. The Contractor shall submit a list of equipment to be demolished for Government review. A list of all items with delivery instructions will be provided in return to identify items for Government salvage. All other items will be the Contractor’s responsibility to dispose.
4.4.8. The government reserves the right to request submittals on any product or service for duration of the contract.
END STATEMENT OF WORK