10-R-0022 Renovate Bldg 465.doc
DOC document 416 KB Posted
- Attached to
- Renovate Building 465
- Solicitation number
- FA4887-10-R-0022
About this file
Solicitation for building 465 FA4887-10-R-0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1. Luke AFB Master Specs.zip | ZIP file | |
| SOW Renovate B465 For Admin D-B.doc | DOC document | |
| Drawings.zip | ZIP file | |
| 2. afi31-401.pdf | ||
| 3. DOD 5200.1-R.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Design Services IAW SOW
FFP
Design Services for Renovation of B465
FOB: Destination
NSN: Z111-OF-CBU-ILD
PURCHASE REQUEST NUMBER: F2U3080089A001
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Renovate B465 in accordance with SOW
FFP
Renovate B465
FOB: Destination
NSN: Z111-OF-CBU-ILD
PURCHASE REQUEST NUMBER: F2U3080089A001
SIGNAL CODE: A
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
Statement of Work for
NUEX 09-1448-7
Relocate FW/XP to B465 31 March 2010
56CES/CEPM
Luke Air Force Base, AZ 85309
Table of Contents
1. Introduction
2. Purpose
3. Scope
4. Statement of Work
5. Contract Objectives
6. Specifications
7. Applicable Documents
8. Special Notifications
9. Attachments
1. Introduction: This Statement of Work (SOW) sets forth basic requirements for Project NUEX 09-1448-7, Relocate FW/XP to B465. This construction project will require performance at Luke Air Force Base, Arizona. This SOW implements Design Build as a viable process for fulfilling the 56th Fighter Wing, Luke AFB, AZ, design and construction requirements. This project will be a renovation of Building 465 to accommodate the 56th FW Plans and Programs staff. The Contractor shall conduct meetings with Contracting and Civil Engineering. The existing infrastructure and work scope will require inspection to identify the extent of the current deficiencies. It must be acknowledged by the contractor that the work scope includes complete review of the facility and preliminary documents, validation of the preliminary work and standards referenced, and identification of deficiencies against present day standards for an Air Force and DOD building. The renovation will include, but is not limited to: replacing the HVAC system and associated ductwork and registers; repairing the roof; the demolition of walls and associated electrical and communications, floor coverings, doors and ceiling grids; the relocation of light fixtures, mechanical diffusers, and fire protection devices; and the installation of new walls, electrical and communication outlets/wiring, ceiling grids, paint, floor coverings, cove base and doors.
History: Luke Air Force Base, Arizona is a training base for the Air Education and Training Command (AETC) and is part of the general defense preparedness system of the United States Armed Forces. The 56th FW XP staff is currently housed in Building 416. The area occupied by the XP staff will be used to consolidate another squadron in support of future mission requirements. As such, Building 465 must be renovated to support the XP function. This facility site is located in the central part of the developed area of the base near the intersection of Fighter Country Avenue and Mustang Street.
2. Purpose: This project will renovate Building 465 on Luke Air Force Base by procuring design services, material, and construction to upgrade the facility. Under this contract, the contractor may be tasked with validating construction price/cost and scheduling. During the construction phase, the contractor will complete project design and construction, and will deliver and warrant the facility. The objective of this project is to deliver complete and usable repairs to the existing facility, such that it supports the present day mission and meets present day standards.
3. Design-Build: Essentially, Design-Build (D-B) is intended to facilitate the contractor’s long-term understanding of the Air Force’s project requirements, and will allow for independent surveys of existing conditions, collaborative participation, and resolution of building concerns prior to the start of construction. Given the contractor’s envisioned level of involvement, the contractor will serve as both the Architect of Record for the completed project, as well as the Contractor of Record. The contractor shall manage and perform D-B construction work as defined in this contract, to include completion of working drawings, permitting, construction, construction management, scheduling, inspection and testing, maintaining construction facilities and temporary controls, environmental protection, quality control, construction quality control, and project closeout.
A. Concept Definition: During the concept definition (CD) effort, the contractor will utilize a professional consultant, herein after referred to as the CD A/E. The provider of CD services is responsible for the development of the CD products from the information included in this SOW. Specifically, the effort will result in documents that are the basis for the design and construction efforts under this contract. This effort necessarily includes development of a design basis (to include applicable codes, standards, and guidance) and outline specifications.
B. Planning and Programming: The CD A/E (consultant) will provide investigative services, actively participate in constructability reviews of planning/programming documents, and prepare or assist with the preparation of the planning/programming documents. The results will be incorporated into the documentation. The project/program specific requirements are specified herein, and include, but are not limited to, site investigation, hazardous material surveys, topographical surveys, traffic studies, base comprehensive compliance surveys, utilities locating and surveying, maintainability and constructability reviews, programmed amount validation, construction permitting, environmental permitting, value engineering, site study and selection, requirements document development, project management plan development, DD Form 1391 preparation, and other project and/or program planning/programming activities required to satisfy higher authority requirements.
C. Project Definition: The CD A/E (consultant) will provide investigative services, actively participate in constructability reviews of concept definition products, review and validate estimated project costs against the construction cost limitation (CCL), and assist in the preparation of proposal documents for the renovation. It is the intent of the Government to require the contractor to build on the results of these studies and investigative services as part of its cost, scope, and standards validation efforts and again during the design and construction phases of the project. The results of all surveys, investigations and constructability reviews may be incorporated into the project’s final definition documents at the discretion of the Government. The details in this regard will be developed with Luke Engineering personnel.
D. Concept Definition/Design: The project/program specific requirements are specified herein. The emphasis during the concept definition activities is ensuring the development of a product that clearly defines the project requirements in terms of either performance, appearance, criteria and/or specification with enough detail that the contractor can provide a quote with reasonable performance, cost (within the Construction Cost Limitation) and schedule risk. Greater emphasis shall be placed on maintainability, constructability, construction cost validation, and satisfaction of customer requirements and needs.
E. Technical Services: The contractor is the “Architect of Record” and, as such, will sign and seal all completed designs. The contractor is accountable for all aspects of the final design under Federal, State and applicable local laws. For reference purposes, a “completed design” within the process includes, (1) the design which is developed within the design and review process following Concept Definition and (2) as-built drawings accurately reflecting any modifications to (1) above. Drawing and final records, to include O&M manuals, will be in both AutoCAD and PDF formats, as finalized with personnel in Engineering at Luke Air Force Base.
F. Summary Status Reports: The contractor shall provide weekly and monthly progress reports for this contract. All information will be maintained in an electronic database (compatible with Microsoft Office Professional, current version) to facilitate summary retrievals. Reports will be acceptable in contractor format.
G. Quality Control (QC) Oversight: The contractor shall review, plan and/or develop QC procedures for this contract, and submit the Quality Control Plan within 15 calendar days after award under this contract for government approval.
H. Hazardous Materials: Materials survey may include destructive testing as necessary to ensure adequate investigation for hazardous materials. Base Environmental personnel and standards will be consulted for approval in this regard. The contractor is also required to provide monthly reports to the base HAZMAT flight tracking the quantity of materials brought onto or removed from LAFB for any materials requiring an MSDS form.
I. Working Drawings, Construction, and Delivery & Warranty: Design completion, construction, and the delivery and warranting of the project/facility are requirements of this contract. The contractor is required to proceed with the results of studies and investigations conducted during the investigatory Phase.
J. Design: Prior to beginning onsite construction, the contractor will initiate the Construction Phase by completing project working drawings and the various plans and schedules, including a construction schedule, using PERT, CPM, or NAS scheduling tools, and obtaining submittal approvals and permits. Working drawings and specifications shall comply with codes, laws and the RFP. The working drawings shall be submitted for review, as directed in this statement of work. The contractor shall be responsible for implementation, coordination, and execution of all regulatory reviews, ensure technical adequacy of the final design, and provide quality control of all phases of the contract. Further details regarding design requirements will be provided by the 56 CES/CEPM project manager.
K. Construction: Upon the approval of the Contracting Officer, the contractor may commence onsite construction activities. Further details regarding construction management requirements, inspection and testing, construction facilities and temporary controls, environmental protection, quality control system, construction quality control, and project closeout will be provided by the 56 CES/CEPM project manager.
L. Contractor Responsibilities:
1.
Security: The contractor shall obtain and monitor security badges used by their own staff during the duration of this contract, in accordance with Clause L-727 of this contract entitled Contractor Access to Air Force Installations.
2.
On-Site Field Oversight: The contractor shall provide the manpower, equipment, material, services, and transportation necessary to ensure oversight services during the construction phase of this contract.
3.
Safety Requirements: The contractor shall conduct operations in accordance with FAR Part 52.236-13 and Alternate 1.
4.
Storage: The contractor shall conduct operations in accordance with FAR Part 52.236-10.
5.
Pre-Final Inspection: The contractor shall conduct a pre-final walkthrough inspection and publish the pre-final inspection findings in a pre-final inspection report.
6.
Final Inspection: The contractor shall conduct a final inspection and publish the findings in a Final Inspection Report in accordance with the format specified at the pre-construction conference. The inspection shall concentrate on the items identified at the pre-final inspection and recorded in the pre-final report. The final inspection report shall also certify that all items of the design have been implemented and that the construction is complete. The final inspection report shall also include a record of “signed and sealed” design drawings and as-built drawings and specifications verifying that all development standards have been met. At the final inspection, the contractor shall present a completed DD Form 1354, Transfer and Acceptance of Real Property to the Base Civil Engineer (BCE) for signature and acceptance.
7.
Delivery/Warranty: The contractor shall complete all inspection and commissioning requirements prior to final inspection. Following final inspection, the contractor shall deliver to the Government the as-built drawings in the format and media as required by this contract. Further details regarding project closeout will be provided by the 56 CES/CEPM project manager. The warranty shall be issued in accordance with FAR 52.246-21. Extended warranties offered by the contractor and its subcontractors or suppliers may be accepted by the Government at its discretion.
4. Scope: The work will include the following, with a performance period of 179 calendar days after issuance of a written Notice to Proceed.
A. The contractor will complete the design and concept development working from this 10% concept document, and documents incorporated by reference below.
B. The contractor will procure material and provide labor as necessary to complete the renovation of Building 465.
C. The contractor is responsible for construction quality on the project. The contractor is required to make their own field investigations to verify dimensions and other information shown on Government furnished reference drawings. Coordination between the (A-E) design disciplines in production of the contract drawings is the contractor's responsibility.
D. The contractor shall visit the job site to re-verify location, conditions, quantities and dimensions previously determined during the design portion of the project as part of his construction proposal preparation. The contractor shall coordinate with the Contracting Officer prior to the visit to the job site.
E.
The contractor shall confine construction operations at the site to areas permitted by law, ordinances, permits, and the contract documents and shall not encumber the site with any materials or equipment without prior written authorization. Subject to prior written approval of exact location, appearance, and color of each, the contractor may be permitted to set-up an office trailer/portable building, a similar job tool trailer, and a waste dumpster in a location designated and approved by the Contracting Officer. The contractor shall store his other materials and equipment at the site designated by the Contracting Officer at the end of each workday. Base appearance is a priority at LAFB. Staging areas are not allowed on the main base without prior permission. There is a contractor yard west of the 1300 area buildings for storage of supplies and equipment.
F.
The contractor shall coordinate all of his operations with and secure written approval from the Contracting Officer before using any portion of the site.
G.
The contractor shall be responsible for any cutting, fitting, or patching required to complete the work to ensure all parts fit properly.
H.
The contractor shall take positive actions to prevent work-generated refuse from entering the base sewage or storm drainage systems. Actions may include installation of temporary plugs, dikes, screens, strainers, or similar measures to prevent entry into the systems or other actions as required.
I.
The contractor shall be responsible for assuring that the existing adjacent site features are not damaged, and remain in their original condition at the completion of the contract work. If the contractor fails to clean up at the completion of the work, the Government may do so as required, and the cost thereof shall be charged to the contractor.
J.
All contractor-generated refuse and waste shall be hauled from the building construction area and deposited in his waste dumpster, or such waste shall be removed from the site daily to a disposal area to be selected by the contractor, and located outside the physical boundaries of the installation. This refuse and waste material shall be hauled in trucks with tight-fitting covers to prevent spillage on roadways. The construction site shall be kept neat, orderly, and safe for workmen at all times.
K.
During the performance of the work within the requirements of this contract, and until final completion and acceptance thereof, the contractor shall exercise the utmost care to avoid accident or injury to persons or property. He shall place and maintain all necessary barriers and safeguards, including watchmen, if necessary, about the work site for the prevention of accidents and shall take all precautions required to protect personnel and property to include the general public and properties adjacent to the work site.
L.
The contractor will provide complete testing of applicable equipment to serve as a basis for acceptance of the repaired installation.
M.
The contractor will provide training, and a complete operations and maintenance package, for the future operation of the renovated area (if necessary).
N.
The contractor will coordinate and schedule final turn-over and provide complete as-built documentation.
5. Statement of Work: This project work will include all, design services, demolition, disposal, material, labor, construction, and testing to deliver complete, operational, and usable systems. An outline of the work follows and the outline is not presented in any particular order for accomplishment of total work. The work will include but not necessarily be limited to:
A. Replace the HVAC system: The contractor shall replace the existing HVAC system with a new properly installed and balanced system. This will include removing the suspended ceiling as necessary for access.
B. Repair/Replace Roofing System: The contractor will inspect the existing roof to determine the areas requiring work and repair to match existing.
C. Replace tiles in the suspended grid ceiling system: The contractor shall replace water damaged and warped tiles in the existing grid-style suspended ceiling with new to match existing.
D. Replace floor covering: The contractor shall replace the existing carpeting throughout the entire facility with ceramic tile, to include cove bases. Please note, the existing floor tile adhesive (under the carpet) contains asbestos.
E. Provide secure room: The contractor shall install/modify the walls, ceiling, windows, ductwork, and doors as necessary to provide a secure room inside the building complying with Open Storage Classified; AFI 31-401, Information Security Program Management and DoD 5200.1R, Information Security Program, Appendix G.
i. Contractor will demolish existing suspended ceiling to include tiles in the affected room. All lights, sprinklers, heat detectors and any miscellaneous items are to remain. This is to allow workable area to extend walls to true ceiling. After all work is complete contractor will provide and install new ceiling grid and tiles. Grid and tiles will match the new system in the rest of the building. All existing items will be reinstalled in new ceiling grid and tiles.
ii. In existing walls contractor will be required to install/blow insulation into the cavities of the wall. This is to provide a sound barrier between the secure room and other areas of the building.
iii. Extend existing/new walls to the true ceiling. Walls will be built using 3-5/8” 20ga metal studs and 5/8” gypsum board on both sides. Install batt insulation into the cavities of the new walls. Gypsum board needs to be taped but no finish is required above ceiling. Seal all penetrations.
iv. Demolish existing door and frame that enters the room. Contractor will replace door with a metal door and welded metal frame. Contractor will provide new door hardware that complies with 5200.1.R Appendix G (attached), consisting of: X-09 locking mechanism with a 1-inch full mortised throw dead bolt assembly, welded or pined hinges and a Balanced Magnetic Switch (BMS). Contractor will install door sweeps on door.
v. Run appropriate sized conduit for new fiber runs to the secure room. All conduit runs must not come any closer than 3’ from any other communication runs or electrical runs and all coupling must be welded or soldered so that these can’t be removed. Conduits must have a pull string. All bends must not exceed a radius specified by the 56th Communication Squadron due to fiber wire that will be installed by same. All conduit runs will be coordinated with a representative from 56th Communications Squadron.
vi. Provide supports for existing communications wires that are running above ceiling grid. Contractor will demolish all abandoned conduits, wires etc to help with new conduit runs for fiber.
vii. Install Advantor Intrusion Detection System (IDS). Contactor will be required to install a new Advantor security system for the secure room with a new BMS on the door to include all wiring, landing the wires in the panel and testing. Contractor shall purchase and install a 360 degree motion detector for the room. Contractor will be responsible to program the existing Advantor panel to ensure that it is reporting to the 56 SFS building 176.
viii. Contractor will be responsible to install a new electrical panel in the secure area. Contractor will run new electrical to panel from existing power supply. All circuits for the secure room, to include lights, outlets and the Advantor panel’s electrical supply, will be re-wired to this panel.
ix. Contractor to evaluate the electrical power for the building and determine the best source for a new feed for the sub-panel.
x. Contractor will include the services of an Advantor technician for final adjustments, final connections, and system testing. Advantor technician will also provide demonstration, instructions, and training to user’s resident personnel and CEOP alarms.
xi. All work will be coordinated with 56CES/Alarm Shop and 56 SFS/S5A.
xii. All vents, ducts and similar openings in excess of 96 square inches that enter or pass thru the secure room must be protected with either bars or grills.
xiii. All walls in the new secure briefing room area will be prepped, primed and painted. Contractor shall be responsible for filling in dings, dents flaws and nail holes in existing wall to include texture where necessary.
xiv. Contractor will repair any and all areas affected by this work to include texture, painting walls around doors and door frames.
F. The contractor shall repair any affected work areas to original condition if altered during the construction.
G. Restore work area cleanliness and order, and dispose of construction debris.
6. Contract Objectives: It is the Government’s intention to award a contract to complete the design and to construct, deliver, and warrant the project.
A. The contractor’s administration shall include the following:
1.
Full time site superintendence.
2.
Submission for approval of: A schedule of values, construction schedule(s) (Microsoft Project), material cut sheets, shop drawings.
3.
Submission for approval of: Dig permits, open flame permits, confined workspace permits (if applicable), utility outage requests, and invoices for partial payment(s).
4.
General work products should be in Microsoft Office format. Drawings, O&M manuals and final submittals are discussed in Section 3.E. Technical Services.
B. After the issuance of this contract, the contractor shall attend all meetings/teleconferences at the location specified by the Contracting Officer’s Technical Representative (COTR).
C. The contractor shall prepare and publish all meeting minutes following PCO approval, track all action items assigned, and shall document all items discussed at a meeting, as well as each meeting’s attendees.
7. Specifications: The division one general requirements shall be included as part of this requirement and specify minimum requirements that shall be used in developing the final design and construction of this project. Final specifications shall be prepared incorporating these requirements into the complete specification requirements for this project using CSI standard format and the Luke AFB Master specifications. A copy of the master specifications shall be provided.
8. Applicable Documents: Base specific documents are identified below. In addition, the contractor shall comply with all applicable (1) Federal, state, local, DOD, Air Force, and agency laws; statutes, ordinances, instructions, manuals, handbooks, regulations, guidance, policy letters and rules (inclusive of changes and amendments), (2) Presidential Executive Orders in effect on the date of issuance of this contract. It must be acknowledged by the contractor that the work scope includes complete review of the facility and preliminary documents, validation of the development of the design basis, and provision of the final design basis against present day standards for an Air Force and DOD airfield. Referenced documents may be obtained from the following URLs: http://www.afcesa.af.mil/library/ and/or http://www.ccb.org/.
A. Documents hereby incorporated by reference:
1.1 UFC 1-200-07a Design Build Technical Requirements
2.1 UFC 1-300-09 DD 1354 Guide
9. Special Notification: The contractor shall immediately report to the PCO, via telephone, any data or results generated during investigations pursuant to this contract which may indicate any potential imminent health risk to contracted or federal personnel, or to the public at large. Following this telephone notification, the contractor shall prepare a written notice with supporting documentation and deliver it to the COTR within three (3) working days. The contractor shall provide written notification in the form of a signed letter scanned into Adobe Acrobat Portable Document Format (*.pdf) and send it to the Contracting Officer via email. Upon request of the COTR, the contractor shall provide pertinent raw laboratory data within three (3) weeks of the telephone notification.
10. Attachments:
A. Luke AFB Division One Specifications.
B. AFI 31-401, Information Security Program Management C. DoD 5200.1R, Information Security Program, Appendix G.
WAGE DETERMINATION
General Decision Number: AZ100001 03/12/2010 AZ1
Superseded General Decision Number: AZ20080001
State: Arizona
Construction Type: Building
Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma
Counties in Arizona.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 03/12/2010
BRAZ0003-003 11/23/2009
COCONINO, MARICOPA, MOHAVE, PINAL (Area West and North of the
San Francisco River to the Gila River), & YUMA COUNTIES
Rates Fringes
Bricklayer - Cement Block
Layer............................$ 24.62 4.57
BRAZ0003-008 11/23/2009
PIMA AND PINAL (Area East and South of the San Francisco River to the Gila River) COUNTIES
Rates Fringes
Bricklayer - Cement Block
Layer............................$ 24.62 4.57
CARP0408-001 07/01/2009
Rates Fringes
CARPENTER........................$ 23.00 7.24
* CARP1327-001 01/01/2010
Rates Fringes
DRYWALL HANGER...................$ 19.25 3.06
ELEC0570-003 12/01/2009
PIMA, PINAL (Southern Part), AND YUMA COUNTIES
Rates Fringes
Electrician/Wireman..............$ 22.20 18%+4.70
ZONE DEFINITIONS: ZONE PAY - Workmen employed in Zones B and C shall be paid Zone Pay as follows:
Zone B............an additional $ 1.25 per hour
Zone C............an additional $ 3.75 per hour
Zones shall be created in Tucson, Arizona, the headquarters of the Union. Zones may be established in other localities by mutual consent of the parties hereto (Section 1.03).
Zones and the applicable rates of pay shall be the same for all Employers coming under the terms of this Agreement.
In Tucson, Zone A shall be the area within a twenty-nine (29) mile radius from a basing point at the City Hall.
Zone B shall be the area from the outer limits of the twenty-nine (29) mile radius, extending out another seventeen (17) miles (a 46 mile radius total).
Zone C shall be the area from the forty-six (46) mile radius, extending to the outside limits of the Local Union's jurisdiction.
If any owner's contiguous property falls within more than one
Zone, it shall all be considered to be within the closer
Zone.
ELEC0640-005 06/21/2008
COCONINO, MARICOPA, MOHAVE, and PINAL (Area North and West of the boundary line beginning at a point where Papago Indian
Reservation Road No. 15 crosses the Pima-Pinal County line, then Northeasterly on Road No. 15 to the intersection with
Highway FAS-267, extending North on FAS-267 to the intersection with Florence Canal, North & East on Florence Canal to the intersection of the line "Second Guide Meridian East" then
North to the Maricopa-Pinal County Lines) COUNTIES
Rates Fringes
Electrician/Wireman..............$ 24.80 3%+7.09
ENGI0428-003 06/01/2009
Rates Fringes
Power Equipment Operator
(2) Crane under 15 tons.....$ 24.16 9.31
(3) Crane,15 tons to 100 tons........................$ 25.24 9.31
(4) Crane, 100 tons and over........................$ 26.27 9.31
IRON0075-002 08/01/2009
Rates Fringes
IRONWORKER, STRUCTURAL
Zone 1:.....................$ 26.52 17.59
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson
Zone 2: 050 to 100 miles - Add $4.00
Zone 3: 100 to 150 miles - Add $5.00
Zone 4: 150 miles & over - Add $6.50
LABO0383-005 06/01/2009
Rates Fringes
LABORER (Brick/Block Tender).....$ 16.72 4.35
PAIN0086-003 04/01/2009
Rates Fringes
PAINTER..........................$ 19.35 4.70
PAIN0086-005 07/01/2009
Rates Fringes
GLAZIER..........................$ 25.75 5.25
PLUM0469-002 07/01/2009
ZONE A: COCONINO, MARICOPA, MOHAVE & YUMA COUNTIES
ZONE B: PIMA AND PINAL COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER
Zone A......................$ 30.55 14.10
Zone B......................$ 27.28 13.85
SFAZ0669-001 01/01/2009
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 28.90 16.00
SHEE0359-002 08/01/2006
PIMA and PINAL (South of the 33rd Parallel) COUNTIES
Rates Fringes
Sheet Metal Worker (Including
HVAC)
Zone 1......................$ 23.29 3%+7.88
Zone 2......................$ 25.29 3%+7.88
ZONE DEFINITIONS:
Zone 1: 0 to 35 miles from the City Hall in Tucson
Zone 2: Over 35 miles from the City Hall in Tucson
SHEE0359-003 07/01/2007
COCONINO, MARICOPA, MOHAVE, PINAL (North of the 33rd Parallel), and YUMA COUNTIES
Rates Fringes
Sheet Metal Worker (Including
HVAC)............................$ 26.00 3%+10.35
SUAZ2004-001 01/14/2004
Rates Fringes
Cement Mason/Finisher............$ 15.25 5.01
Laborers
Concrete Worker.............$ 8.88 0.00
Form Setter.................$ 9.63 0.00
General/Cleanup.............$ 11.37 2.91
Waterproofing...............$ 12.59 0.00
PLASTERER........................$ 15.00 0.00
Power Equipment Operator
Backhoe.....................$ 14.78 0.00
TILE FINISHER....................$ 11.00 0.00
TILE SETTER......................$ 14.98 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
CLAUSES INCORPORATED BY FULL TEXT
L-706
INSPECTION AND ACCEPTANCE (JUL 1993)
Inspection and acceptance will be a destination(s) specified in Section “E” hereof.
56 CES/CEPM-M, Building 343, 13970 W. Lightning St, Luke AFB, AZ 85309-11 Is designated as the office responsible for inspecting the work while the Contracting Officer is responsible for final acceptance of the work.
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| POP 23-SEP-2010 TO |
21-MAR-2011
| N/A |
| 56 CIVIL ENG/CECS-F2U308-(FA4887) |
AL REGAL
13970 GILLESPIE DRIVE
BLDG 343
ENGINEERING SECTION
LUKE AFB AZ 85309
623-856-6462
FOB: Destination F2U308
| 0002 |
| POP 23-SEP-2010 TO |
21-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination F2U308
CLAUSES INCORPORATED BY REFERENCE
| 52.211-10 |
| Commencement, Prosecution, and Completion of Work |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
Section G - Contract Administration Data
L-713 (56 CONS/LGCP) ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (SEP 06)
Contractors shall use Wide Area WorkFlow (WAWF) (https://wawf.eb.mil) to submit payment requests in electronic form. Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests, prescribes policies and procedures for submitting and processing payment requests in electronic form to comply with 10 U.S.C. 2227, and is referenced in this contract. Vendors are encouraged to access farsite.hill.af.mil, and read DFARS 252.232.7003 in full text.
To begin self-registration process, contractors must contact DISA WESTHEM, Area Command Ogden, Customer Service Center, 1-866-618-5988 and request CAGE code input into WAWF system.
Point of contact for assistance, to include self-registration, submission of payment request, training, etc. is Mr. Alex Skarlatos, Contract Specialist, 623-856-7179/x227, alex.skarlatos@luke.af.mil. Training will be provided, by appointment, when requested.
THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICE(S) AND ADDITIONAL E-MAIL(S) CORRECTLY THROUGH WAWF:
FORMCHECKBOX
Stand-Alone Invoice FORMCHECKBOX (Fast Pay – FAR 52.213-1)
FORMCHECKBOX
Construction Payment Invoice
FORMCHECKBOX
Invoice + Receiving Report (Combo)
FORMCHECKBOX
Performance Based Payment Invoice
Invoice as 2-In-1 (Services Only)
Progress Payment Invoice
Cost Voucher Invoice (FAR 52.216-7, 52.216-13, 52.216.14, 52.232-7)
Contract Number: FA4887-10-C-00XX
Delivery Order:
Issue-by DoDAAC:
FA4887
Admin DoDAAC:
FA4887
Inspected By DoDAAC/BPN:
F2U308 Ship-To Code/BPN:
FA4887
Service Acceptor/BPN:
FA4887
Pay DoDAAC:
F67100
ADDITIONAL E-MAIL NOTIFICATIONS;
INSPECTOR:
robert.beausoleil@luke.af.mil
ACCEPTOR/CONTRACTING OFFICER:
caley.cyphers@luke.af.mil/carol.cherapan@luke.af.mil
CONTRACT ADMINISTRATOR ON THE CONTRACT:
caley.cyphers@luke.af.mil Payment information may be accessed using DFAS website at https://www.dfas.mil. Your purchase order/contract number or invoice will be required to check status of your payment.
DISA WESTHEM
Area Command Ogden Customer Service Center
CONUS ONLY: 1-866-618-5988
Section H - Special Contract Requirements
CLAUSES INCORPORATED BY FULL TEXT
L-701
ARIZONA PRIVILEGE TAX INFORMATION (APR 1999)
There are certain Arizona Taxes that are applicable to any contract. The offeror may contact the State of Arizona, Revenue Department, Sales Tax Audit Section, 1160 W. Monroe, Phoenix, AZ 85007, to determine the taxes and the base upon which such taxes must be paid. Such taxes, if any, shall be considered as being included in the offeror’s price as stated in the bid schedule. These taxes are applicable to out-of-state as well as in-state firms.
Arizona Revised Statues (A.R.S.) 42-5061, Retail classification, imposes the transaction privilege tax on the business of selling tangible personal property at retail. A.R.S. 42-5061 (V)(3) defines “selling at retail” as a sale for any purpose other than for resale. Therefore, sales intended for resale are not taxable. The tax base for the retail classification is the gross proceeds of sales or gross derived from the business. All retail sales are subject to tax unless specifically exempted by statute.
COMMODITIES AND SERVICES
“Sales made directly to the United States government or its departments or agencies by a manufacturer, modifier, assembler or repairer” are not subject to tax (A.R.S. 42-5061(K)(1)). Note: Only sales by a manufacturer, modifier, assembler or repairer are 100% exempt. However, all other sales “made directly to the United States government or its departments or agencies” are deductible from the retailer’s tax base at a rate of 50% (A.R.S. 42-5061(L)).
CONSTRUCTION
A.R.S. 42-5075(B), Prime contracting classification, indicates that the tax base for prime contracting is 65% of the gross proceeds of sales or gross income derived from the business. Sales of tangible personal property to a person engaged in the business of prime construction contracting are not subject to tax if the property is incorporated or fabricated into the real property or project (A.R.S. 42-5061 (A)(27)).
CLAUSES INCORPORATED BY FULL TEXT
L-702 AIR FORCE ENVIRONMENTAL, SAFETY, AND OCCUPATIONAL HEALTH MANAGEMENT SYSTEM (ESOHMS) CONFORMANCE REQUIREMENTS FOR CONTRACTS PERFORMED ON AIR FORCE INSTALLATIONS (APRIL 2010)
In accordance with Executive Order (EO) 13148, Greening the Government through Leadership in Environmental Management, all contracts requiring contractor personnel to perform activities on the installation that have the potential to significantly impact the environment shall comply with the following:
(1) ESOHMS Information Requirements: For contracts that include FAR Clause 52.223-5 (Pollution Prevention and Right-to-Know Information) and/or its alternative paragraph (c)(7), which states “The contractor shall provide all information needed by the Federal facility to comply with the …environmental management system as described in Section 401 of E.O. 13148, the contractor shall comply with the following:
Information Requirements:
(a) AIR: Excavation - When disturbing more than a tenth of an acre, a dust control permit must be obtained from Maricopa County Environmental Services Department. Equipment (generators, abrasive blasting, and solvent/degreaser tanks) that remains located on the base for more than 30 days must be listed and provided to the Air Program Manager. Luke AFB is located in a non-attainment area and is regulated by Maricopa County. Any activities that include earthmoving (fugitive dust) (MC Rule 310), abrasive blasting (MC Rule 312), spray coating procedures (MC Rule 315), solvent degreasing (MC Rule 331), architectural coatings (MC Rule 335), or surface coatings requirements (MC Rule 336) reference must be made to the Maricopa County Air Regulations at http://www.maricopa.gov/aq to ensure activities or products used are in compliance with these regulations.
(b) ASBESTOS: No asbestos containing material shall be used on any government installation, Luke AFB, Gila Bend AFAF, or Fort Tuthill. A Material Safety Data Sheet (MSDS) is required for all building materials except for wood, glass, or steel. The MSDS’ shall be submitted to the Contracting Officer (CO) via the AF Form 3000 within seven (7) calendar days after issuance of the written Notice to Proceed (NTP).
(c) HAZARDOUS MATERIALS MANAGEMENT: In accordance with FAR Clause 52.223-3, the Contractor shall provide Material Safety Data Sheets (MSDS) to the Contracting Officer (CO) for all hazardous materials (HAZMAT) to be used during the project prior to contract award. The CO or Quality Assurance Personnel (QAP) shall provide MSDS’ to 56 CEV/CEAN for review prior to the contractor bringing products on base. The contractor shall inventory all HAZMAT, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on base. A HAZMAT inventory shall be maintained at all times and contain the nomenclature, manufacturer, part number, quantity, storage location, and the process in which the material is used. All HAZMAT stored at Luke AFB shall be managed in accordance with federal, state, local, and Air Force regulations. Identified HAZMAT shall be managed and tracked in the installation’s approved HAZMAT tracking system. If a HAZMAT is required to be tracked, the contractor shall complete required documents to support installation requirements. Contractor shall report monthly HAZMAT inventories/usage to the CO or QAP. QAPs shall provide inventory/usage to the Hazardous Material Management Office (Bldg 927).
(d) LEAD-BASED PAINT: Lead based paint shall not be used during any painting process. An MSDS shall be submitted for all paint products.
(e) PLUMBING FIXTURES: No plumbing fixtures shall be installed at Luke AFB unless they conform to the voluntary standard NSF/ANSI Standards 24 and 61. Products certified under these standards are tested to ensure no leaching from the fixtures exceeds 11 parts per billion (lead).
(f) POTABLE WATER: The contractor shall ensure all potable water connections have an ASSE approved anti-siphon device attached to the hose bib prior to mixing chemicals. Any anti-siphon device or backflow prevention device installed by the contractor as part of his work will be identified to the Backflow Prevention Manager, 56 CES/CEOIU, for addition to the base inventory. The type of device selected for installation and the installation location shall be approved by the Backflow Prevention Program Manager prior to installation.
(g) WASTEWATER: No chemical products shall be dumped in any drainage system, storm drain, wash rack, septic system, or sanitary sewer. Prior to final payment, the contractor shall remove all remaining and residual chemicals from the installation. If there are questions concerning specific wastewater products, please contact 56 CES/CEAN.
(h) SOLID WASTE: Report monthly the amount of Construction & Demolition (C&D) material generated and recycled to 56 CES/CEAN. C&D debris is defined as material produced during the construction, renovation, demolition or deconstruction of residential and commercial buildings and its infrastructure. C&D debris typically includes concrete, wood, metals, gypsum wallboard, asphalt, and roofing material. If the contractor generates a potential waste or hazardous waste during the contract period, the contractor shall contact the base Hazardous Waste Manager at (623) 856-6501 for proper reporting and disposal procedures.
(2) ESOHMS Training Requirements: In accordance with the memorandum dated 11 Dec 2006, Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations, all contractor personnel working on the installation shall complete Air Force-provided initial ESOHMS awareness-level training and comply with the following:
(a) 56 CONS Contractor Administrator(s) shall provide (1) Key contractor personnel with initial ESOHMS awareness-level training at the pre-construction meeting and (2) An electronic version of the training via email upon request. It is the responsibility of key contractor personnel to disseminate the initial ESOHMS awareness-level training to all prime and subcontractor employees.
(b) The initial ESOHMS awareness-level training can be accomplished in approximately fifteen (15) minutes.
(c) All contractor employees who work on the installation shall complete initial ESOHMS awareness-level training no later than sixty (60) days after contract award.
(d) Neither the installation nor contractor personnel are required to document contractor employee initial ESOHMS awareness-level training. However, key contractor personnel shall follow-up with all employees to ensure successful completion of the training.
(3) ESOHMS Refresher Training Requirements: Contractor employees who complete initial ESOHMS awareness-level training remain current for a period of 365 days from date of completion. Key contractor personnel shall ensure all prime and subcontractor employees are current throughout the performance of the contract.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
L-704 REQUIRED INSURANCE (JUN 2001) (IAW FAR 28.306(b)) Reference FAR clause entitled "Insurance..." the Contractor shall, at it's own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
a. Workman's Compensation and Employees Liability Insurance as required by law except that if this contract is to be performed in a State, which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen's Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence of bodily injury and $20,000 per occurrence for property damage shall be required.
CLAUSES INCORPORATED BY FULL TEXT
L-708
BASE FIRE PREVENTION PROGRAM (JUN 2001)
The contractor will be required to comply with the Fire Prevention Program regulations of the military installation to be serviced under this contract. The names of the installation(s), the applicable regulations, and the locations where these regulations may be reviewed are listed below:
Name of installation(s): Luke AFB, Arizona,Gila Bend, Fort Tuthill
Regulation No. and Title: AFI 32-2001, The Fire Protection Operations and Fire Prevention
Program, and Luke AFB Regulation 32-2001 Fire Prevention and Protection
Date: 01 Apr 99 and 27 Jun 03
Location: Bldg 450, Luke AFB, Arizona
CLAUSES INCORPORATED BY FULL TEXT
L-710
SMOKING IN AETC FACILITIES (JUL 1993)
Contractors are advised that the commander has placed restrictions on the smoking of tobacco products in AETC facilities. AFI 40-102, Tobacco Use in the Air Force, and its AETC supplement 1, outline the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as are Government personnel. Smoking is permitted only in designated smoking areas.
CLAUSES INCORPORATED BY FULL TEXT
L-712
INFORMATION CONCERNING BONDS (SEP 2006)
(a) Performance and Payment Bonds. Within 10 days after receipt of the signed contract or notice of award, the contractor shall furnish two bonds, each with good and sufficient surety or sureties acceptable to the government; namely a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds shall be as follows, but are not required for contracts of $30,000 or less:
(1) Performance Bond. The penal sum of the performance bonds shall equal 100 percent of the contract price.
(2) Payment Bond: The penal sum shall be 100 percent of the original contract price.
(b) In determining the penal sum of bonds for requirements contracts, the price payable for the estimated quantity shall be considered the contract price. When determining the penal sum of bonds for indefinite quantity contracts, the minimum quantity or value of the contract, as described in FAR 16.504(a), shall be considered the contract price. When the minimum value of the contract is exceeded, the Government may require additional bond protection in accordance with the guidance at FAR 28.102-2.
(c) Bonds will be furnished by the contractor to the government prior to commencement of contract performance.
L-724
UTILITIES CONSERVATION (JUL 1993)
The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc.,, will be furnished by the government at no cost to the contractor. Long distance and Defense Switched Network (DSN) telephone services will not be provided.
L-727
CONTRACTOR ACCESS TO AIR FORCE INSTALLATION (APR 2010)
(a) Security Requirements. The contractor shall adhere to the installation security requirements as provided for in AFI 31-601, INDUSTRIAL SECURITY, and Luke Supplement thereto in this contract. When work under this contract requires entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, The Air Force Installation Security Program, AFI 31-501, Personnel…