This Statement of Work (SOW) details the requirements for providing a five-stall toilet trailer to Andersen Air Force Base (AAFB) Airfield in support of the 11 Air Task Force (ATF) and 11 Combat Air Base Squadron (CABS). The toilet trailer must be delivered and installed by 20 October 2025, with a rental period from 15 October to 31 December 2025, covering approximately 78 days. The trailer should preferably connect to both a military-style 3-phase, 60-amp generator and standard American household receptacles.

Key requirements include weekly cleaning and supply replenishment, waste removal, and compliance with base security protocols. The contractor must provide securing mechanisms for inclement weather, ensure 24/7 repair capabilities with a 4-hour response time, and obtain proper entry authorization for employees. All personnel must pass background checks and be escorted by ATF or CABS members. The contractor is responsible for delivering, installing, and removing the trailer while maintaining the site, disposing of waste in compliance with local environmental regulations, and following all base safety and traffic procedures.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

for

Toilet Trailers Andersen AFB Airfield

1. GENERAL: The contractor shall provide all personnel, labor, materials, transportation, and equipment to provide One Five (5) Stall Toilet Trailer to include cleaning services to Andersen AFB airfield in support of the 11 Air Task Force (ATF) and 11 Combat Air Base Squadron (CABS) for approximate 78 days. Personnel means contractor’s employees and any sub-contractors supporting these contract requirements.

2. SUMMARY: The toilet trailer and any required associated equipment for cleaning and maintenance shall be delivered, installed, completed and ready for use no later than 20 October 2025. The rental period shall run from 15 October 2025 to 31 December 2025. Any extension or early termination will be communicated in writing by the Contracting Officer.

3. DESCRIPTION: One Five (5) Stall Toilet Trailer. Is preferred that the units should be able to connect to both a military-style 3-phase, 60-amp generator (via cannon plugs) and standard Type B American household receptacles for AC power. However, this is not strictly required.

Picture below are for reference only.

4. SERVICING:

a. Waste Removal: Tank is completely emptied using a vacuum truck and waste is properly disposed of.

b. Cleaning & Sanitizing: Interior is thoroughly cleaned and disinfected with sanitizing solutions.

c. Supply Replenishment: Toilet paper is replaced, hand sanitizer refilled (if applicable), and chemical deodorizer.

d. Inspection & Maintenance: Unit is inspected for damage, proper door function, and ventilation.

e. Water Refill: Fresh water tank is refilled.

f. Waste Removal: Grey water tank is emptied.

g. Supply Replenishment: Soap and paper towels (if applicable) are refilled.

h. Cleaning & Sanitizing: Sink basin and surrounding surfaces are cleaned and sanitized.

5. SAFETY:

a. The contractor shall provide securing mechanisms that prevent damage to surrounding areas and keeps the toilet trailers and all supplied equipment in place during sudden inclement weather or high wind conditions. Should typhoon conditions be declared, it will be the sole responsibility of the contractor to secure the units.

b. The contractor must follow all safety and traffic procedures while operating on base.

6. SET UP/TEARDOWN:

a. The contractor shall remove all units and restore the area to its original condition, free of waste, debris, and any material used in the setup..

b. Frequency: The contractor may make pre-coordinated deliveries and removal.

7. REQUIREMENTS AND DETAILS:

a. The contractor shall provide: One Five Stall Toilet Trailers for an approximate 78 days

b. The contractor shall be responsible for the delivery, mobilization, and demobilization of the toilet trailers at the designated location. Please see below for location and placement.

c. The contractor shall clean up all debris and remove and properly dispose of all associated materials with the mobilization and demobilization of the toilet trailers.

d. The contractor shall provide for cleaning and supply replenishment of the unit once a week.

e. The contractor shall provide clean (non-potable) water and shall ensure sufficient cleaning water is available for a minimum of two days utilization.

8. SECURITY:

a. All contractor personnel or representatives entering the Government installation shall abide by all security regulations of the base installation commander.

b. The contractor must have all personnel badged at the Andersen Air Force Base (AAFB)

Pass and Registration Section to work on this contract. The contractor shall interface with the 36TH CONS, 36th Security Forces and the AAFB Air Field Flight Line Control personnel to ensure they have completed all requirements and have been granted access to AAFB and the area where the latrine unit(s) will be emplaced and serviced.

All personnel will undergo a background check (note: there is minimum 72 hours required for processing checks). The contractor shall be escorted by 11 ATF or 11 CABS members. Any persons denied entry during the background check, will be prohibited from entering AAFB. All contractor personnel who are cleared for entry will receive a contractor’s badge and are required to register all vehicles in accordance with current AAFB guidelines. The contractor’s badge will be issued to provide access and permission to AAFB and portable toilet designated area on the flight line seven days a week, 24 hours a day. The contractor shall ensure that all necessary requirements are completed and badges issued to personnel involved in the delivery, installation, checkout and turnover of portable toilets and handwashing stations one calendar week prior to the delivery date. Vendor shall begin working badging requirements upon receipt of award.

9. Other Requirements:

a. In the event of an incident that involves damage to contractor or government property, or personnel, the contractor shall immediately:

1. Inform the Contracting Officer (CO) within 24 hours after the occurrence; and

2. Provide details of the accident in writing to the CO and the command safety office within 48 hours.

b. A competent, English-speaking supervisor or superintendent, with the authority to act on behalf of the contractor, must always be present at the delivery site during mobilization/demobilization of the portable toilets and handwashing stations.

c. The contractor shall provide a 24/7 capability to repair and/or replace any items that fail during the time-period of rental. An employee must be on site within 4 hours from call of item failure

1. Contractor shall provide a 24/7 emergency contact number for service or incident response.

d. The Latrine Trailer shall be verified to comply with the requirements of this SOW prior to acceptance of units. Any noted defects or anomalies will be corrected prior to final acceptance of units.

e. All waste disposal must comply with applicable local environmental and sanitary regulations.

f. Obtain an Entry Authorization List for employees, and adhere to all flightline driving regulations for Andersen AFB prior to performance of the contract.

STATEMENT OF WORK
for
5. SAFETY:
6. SET UP/TEARDOWN:
7. REQUIREMENTS AND DETAILS:
8. SECURITY:
9. Other Requirements: