Amended PWS 355 EMS - Pressure Washer Installation.pdf

PDF 797 KB Posted

Attached to
355 EMS - Pressure Washer Install
Solicitation number
FA487725QA481
Issued by

About this file

This Performance Work Statement (PWS) details the requirements for removing and installing a pressure washer system for the 355th Equipment Maintenance Squadron at Davis-Monthan Air Force Base in Arizona. The primary objective is to replace the existing pressure washer in Building 4885, which is used for cleaning Aerospace Ground Equipment (AGE) for maintenance, inspection, and preparation for overseas shipment, with a new system that meets the base's 6-month corrosion control requirements.

The contractor must provide all necessary tools, personnel, and equipment to remove the old pressure washer and install the new system, which includes a heated pressure washer, guns/wands, soap storage tank, air compressor, and exterior hose reel system. Key installation specifications include modifying power connections from 460V/3-phase/8A to 208V/1-phase/30A, adjusting the gas line from 1" to ¾", and rerouting the exhaust vent. The project must be completed within 30 days of receiving materials, with work performed between 7:00 a.m. and 4:30 p.m., Monday through Friday. The contractor will provide a 1-year warranty on parts and labor, and must comply with base security, safety, and operational protocols.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page | 1

Performance Work Statement (PWS) For

BLDG 4885 Pressure Washer Install Contract

Objective. Remove and dispose of broken pressure washer and install new provided pressure washer for Bldg 4885, AGE SPUDS for utilization in AGE maintenance, inspection, and equipment preparation operations. Pressure washer is utilized to meet Davis-Monthan AFB’s 6 month corrosion control requirement on AGE Equipment and the preparation of AGE equipment for shipment to overseas locations.

1.0. Description of Services.

The contractor shall provide all tools, parts, equipment, materials, transportation, personnel, labor, supervision, and management necessary to perform AGE pressure washer removal/ install for the 355th Equipment Maintenance Squadron on Davis-Monthan AFB (DMAFB), AZ. The wash racks consists of the below equipment:

- 1 each heated pressure washer systems

- 1 each pressure washer guns/wands

- 1 each soap storage/supply tank and all related equipment

- 1 each air compressor used by the wash systems

- 1 each exterior hose reel systems including enclosures, reels, motors, and switches

1.1. Space Prep. Government will provide an open space clear of equipment based on the dimensions (24”L x 49”W x 49”H) consistent with chemical storage facility. Contractor will remove and dispose of old pressure washer system in accordance with local guidance.

1.2. Installation of System. The contractor shall provide all required equipment and material to install the pressure washer system. The pressure washer will be used to clean AGE equipment for inspection or in preparation for deployment and must include all specifications identified on Salient Characteristics..

- Current power for old unit: 460V/3-phase/8A New power requirements: 208V/1-phase/30A

- Gas line: Needs to be reduced from 1” to ¾”

- Exhaust vent/flue will need to be rerouted. The new units exhaust orientation is different than model currently installed. The draft diverter will also need to be corrected to match specs (minimum 36” above flue collar)

1.3. Schedule. Upon contract award and prior to commencing work, the contractor shall create a schedule of each phase of the work and submit to the Contracting Officer. The contractor shall submit an updated schedule when changes occur. This project should be completed within 30 days upon receiving all materials/parts to complete the job.

1.4. Working Hours. The contractor shall perform installation services between the hours of 7:00a.m. – 4:30p.m., Monday through Friday, excluding Federal Holidays. The contractor shall coordinate with the point of contact to schedule specific days and times to perform services. If the contractor desires to work after 4:30p.m., weekends, or Federal Holidays, the contractor must

Page | 2 submit the request to the Contracting Officer. Each request will be considered on a case-by-case basis.

1.5. Testing. Upon completion of installation, the contractor shall validate the operation of the equipment in the presence of Government personnel. If any component of the system does not function properly, the contractor shall make necessary adjustments/repairs at no additional cost to the government.

1.6. Warranty. All work performed shall be in accordance with standard industry practice and shall be free from failure, due to defective workmanship, for a period of 365 days from the date of project completion. Any new materials/products provided shall also be covered for a period of 365 days from completion if the items deemed defective were not caused by the following: misuse, negligence, force majeure, product modifications, product alterations or repairs performed by non-trained factory individuals. At time of project completion, the contractor shall provide too, the client the warranty package which include operation manuals and extended warranty information.

Any labor/service costs provided after the one-year term, regardless of extended warranty status, shall be incurred directly by the client and may include additional expenses covering travel, per diem, mileage, etc.

1.7. Contract Manager. The contractor shall designate a primary contract manager (CM), who will be responsible for contractor-performed services. Upon contract award, the contractor shall submit the name and telephone number of the CM, in writing, to the CO. The CM shall have full authority to act for the contractor on all matters relating to daily execution of the contract. The CM shall be present and available within 2 days of notification to meet on the installation with Government personnel designated by the Contracting Officer to discuss any contract issues or problem areas.

1.8. Wash Rack Availability. The wash rack will be available to the contractor during the hours of 7:00 a.m. – 4:00 p.m., Monday through Friday, except Federal Holidays and DMAFB down days, to perform maintenance and repair services. The contractor shall include the days and times they will perform maintenance services on their maintenance schedule. Additionally, the contractor shall contact the Aircraft Wash Rack Manager prior to arriving and departing Davis-Monthan AFB.

1.9. Contractor Arrival and Departure. The contractor shall contact the AGE Facility Manager, at 520-228-0672 or 520-228-6930, upon arrival and prior to departing DMAFB after maintenance and/or repair services are complete. An AGE representative will escort all contractors that do not have proper authorization for flight line access.

1.10. Contractor Report. Upon completion of maintenance and/or repairs, and prior to departing DMAFB, the contractor shall provide a report to the AGE Facility Manager with the following information:

a. Maintenance and/or repairs completed

b. Condition of the equipment inspected

c. Parts replaced

d. Warranty terms and conditions

e. Printed name and signature of technician

f. Notes or recommendations from the service technician

Page | 3

1.11. Contractor Warranty. The contractor shall provide a minimum 1 year warranty for all parts and labor.

1.12. Consumables and Non-Warranty Replacement Parts. The Government will provide or reimburse the contractor for consumables and non-warranty replacement parts, at cost.

1.13. Deliverables/Reporting Requirements.

Deliverable PWS Para Due to COR/CO Maintenance Schedule 1.2 CO Contractor Report 1.8 AGE Facility

Manager Listing of Employees 3.3 CO

2.0 Special Requirements.

2.1. Maintenance/Repair Delays. If the contractor is unable to perform maintenance or repairs due to circumstances beyond their control (e.g. awaiting parts), the contractor shall notify the AGE Facility Manager of the delay and provide the estimated downtime estimated maintenance or repair date. Wash rack downtime shall be kept to an absolute minimum. If maintenance or repairs cannot be completed by the estimated date, the contractor shall provide a new estimated maintenance or repair date.

2.2. Contractor Personnel Qualifications. The contractor shall ensure only fully qualified certified technician(s) perform preventive maintenance and repairs to the wash rack. The contractor shall provide proof of technician qualifications upon Government request.

2.3. Replacement Parts. The contractor shall only use new genuine replacement parts and materials that conform to the original equipment manufacturer’s specifications, of equal or better quality, unless otherwise approved by the Contracting Officer, or a designated representative.

Rebuilt assemblies/subassemblies may be used if the item meets the manufacturer’s specifications for reconditioning and the item is standard to industry practice, and carries the same warranty as a new assembly or subassembly. The contractor shall dispose of all used parts at a site outside of

DMAFB.

2.4. Safety. The contractor shall comply with all applicable laws and safety regulations.

Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the contractor’s obligation, and the Government will assume no liability or responsibility for the contractor’s compliance or non-compliance with such responsibilities.

2.5. Safety Equipment and Clothing. The contractor shall provide contractor employees with all safety equipment and clothing necessary/required to perform maintenance and repair services, at no additional cost to the Government. These item(s) shall meet all State, Federal and OSHA safety guidelines.

2.6. Processing Hazardous Materials (HAZMAT) for Use on DMAFB. The contractor shall

Page | 4 not bring or use any type of HAZMAT on DMAFB, until the HAZMAT has been approved by the Hazardous Materials Pharmacy (HAZMART). Upon contract award, the contractor shall submit Material Safety and Data Sheets (MSDS) to the Contracting Officer for all HAZMAT the contractor intends to use on DMAFB. The Aircraft Washrack Manager will contact the contractor if more data is required for HAZMAT use approval. The Aircraft Washrack Manager will also notify the contractor if the HAZMAT has been approved for use on DMAFB, including information for tracking HAZMAT by the contractor, if required.

3.0. General Information

3.1. Data. The Government has unlimited rights to all deliverables of this contract to include intellectual property rights.

3.2. Reporting Requirements. Contractor personnel shall immediately report to an appropriate Government authority any information or circumstances of which they are aware may pose a threat to the security of Department of Defense personnel, contractor personnel, resources, and classified or unclassified defense information.

3.3. List of Employees. Upon contract award, the contractor shall provide a list of employees that will perform services on DMAFB, with each employee’s name, driver’s license number and state of issue to the Contracting Officer. The contractor shall provide an updated list when an employee's status or information changes. The name of any contractor employee that is terminated during the period of the contract must be reported to the Contracting Officer in writing within one workday of the employee’s termination.

3.4. Pass and Identification Items. The contractor shall ensure the pass and identification items required for contract performance are obtained for employees and non-Government owned vehicles.

3.5. Retrieving Identification Media. The contractor shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires;

e.g. terminated for cause, retirement, etc.

3.6. Traffic Laws. Contractor employees shall comply with all base traffic regulations. Contractor employees are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of seat belts is mandatory for all vehicle occupants. The use of cell phones is prohibited while driving on base, unless the phone is a hands-free cell phone.

3.7. Random Personnel and Vehicle Searches. Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of base driving privileges, debarment from the base, or other administrative action.

3.8. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor owned vehicle or privately owned vehicle while on Davis-Monthan AFB.

Page | 5

3.9. Physical Security. Contractor employees shall safeguard all Government property and controlled forms provided for contractor use. At the end of each work period, the contractor shall secure all Government facilities, equipment, and materials. The contractor shall establish and implement methods of ensuring all Government lock combinations, are not lost, misplaced, or used by unauthorized persons. The contractor shall prohibit the use of lock combinations, issued by the Government, by any persons other than the contractor’s employees. The contractor shall also prohibit and the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in performance of contract work requirements in those areas.

3.10. Contractor Personnel Travel on the Installation. All contractor personnel will limit their travel on the installation only to specific areas required for performance of services, specified break and meal areas, or travel directly to and from these locations.

3.11. Federal Holidays. The Federal Government observes the following holidays. (Note: If the holiday falls on a Saturday then the holiday will be observed as recognized by the Federal Government). The contractor shall not normally be required to provide routine services on holidays, or the actual day set aside for observation.

New Year’s Day Labor Day Martin Luther King’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Juneteenth Thanksgiving Day Independence Day Christmas Day

3.12. Continuation of Essential DoD Contractor Services During Crisis. This requirement has been determined not to be essential and does not require continued support during a crisis, as defined in the Department of Defense Federal Acquisition Regulation Supplement (DFARS), Subpart 237.76, Continuation of Essential Contractor Services.

3.13. Contractor Employee Appearance. Contractor employees shall present a professional, conservative, and neat appearance. Contractor personnel shall report for duty in a professional manner, in appropriate attire befitting the work environment, and have complied with socially acceptable standards of personal hygiene. While performing services, contractor employees shall be neat and clean (free of visible dirt and stains), well-groomed and appropriately dressed.

The contractor employee's clothing shall fit correctly to provide a professional, modest appearance, in keeping with normally accepted commercial standards of dress for the work being performed.

3.14. Communication. Contractor employees shall maintain open, professional, and respectful communication with Government personnel (military and civilian) and other contractor employees. The COR will report valid complaints in writing to the CO for action. Valid complaints will be considered a performance failure. The contractor shall resolve all substantiated complaints immediately upon notification of the complaint. Contractor employees are required to identify themselves as a contractor at all times while on the job.

Page | 6

4.0. Government Provided Items and Services

4.1. Government Furnished Services. The Government will provide the contractor with a source of water and electricity.

4.2. Sludge and Debris Removal. The Government is responsible for the removal of sludge and debris.

4.3. Warranties. The Government will provide existing wash rack warranty information to the contractor and the contractor shall take advantage of all existing warranties.

4.4. Emergency Services. The Government will provide security forces services (call (520) 228- 4444 for emergencies only), and fire protection services (call (520) 228-3333). There is no emergency room on DMAFB, therefore contractor personnel shall call (520) 228-3333 for medical emergencies.