Salient-Characteristics-Template (002).pdf

PDF 200 KB Posted

Attached to
Sources Sought for Wash Rack Conversion
Solicitation number
FA487724QA311
Issued by

About this file

This document is a Salient Characteristics Template for a federal contract opportunity to convert an automatic car wash at Davis-Monthan Air Force Base into a 3-bay manual wash system. The contractor shall provide all equipment, materials, and labor to demolish the existing automatic system and install the new manual wash bays, including pumping stations, air compressors, water softeners, booms, brushes, and other required accessories. Specific technical requirements are provided for the dimensions, electrical, warranty, and other specifications of the equipment. The Salient Characteristics are attached to a Sources Sought notice with Solicitation Number FA487724QA311, which seeks capability statements from interested vendors for the Automatic to Manual Wash Rack Conversion project. The Performance Work Statement and a picture diagram are also included as attachments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SALIENT CHARACTERISTICS

FOR

Requirement Title

1.0. SCOPE OF WORK:

All proposed products shall meet or exceed the following minimum specifications outlined in this Salient Characteristics. All items shall be delivered to the ________ Squadron

1.1. PRODUCT PERFORMANCE SPECIFICATION:

Item must meet the following minimum specifications:

SPECIFICATIONS

Please adjust Headers to item requirement

Dimensions L x W x H:

Weight:

Electrical Requirement:

Warranty:

Volume Capacity:

Temperature Range:

Features:

Accessories:

Headers

Convert existing automatic drive thru wash bay to a 3 bay manual wash system. Demo and remove all existing equipment. Properly dispose of all equipment off base. Provide qty 3 manual wash bay pumping stations with the following specifications: *See quote

None

*refer to quote

Provide all electrical work including breaker panels, disconnects, conduit & wiring to provide a complete installation. Provide all pluming required including installation qty 2 oversized PVC conduits to each ceiling mounted boom. One conduit provide and pull high pressure hose for wand, One conduit provide and pull hose for brush.

Provide 1" Water Softener, Commercial Grade, 71,000 Max Grain Capacity, Digital controller

Provide 5HP 3 Phase 2-Stage 80 Gallon Air compressor w/ auto-drain & regulator as needed. Provide qty 3 stainless steel 360 degree ceiling mount dual booms (wand/brush). Provide air powered foaming brush system, 3 bay, w solenoids, pumps, stainless mixing tank & all controls Provide Qty 3 stainless remote boxes with controls 8. Provide 30 gallons of Wash Soap, 30 gallons brush soap, 30 gallons wax, and 20 bags of salt for system startup.

*refer to quote

*listed on quote

355 LRS

File details come from the government source that posted it. Updated .