Performance Work Statement Construction 1.pdf
PDF 142 KB Posted
- Attached to
- Sources Sought for Wash Rack Conversion
- Solicitation number
- FA487724QA311
About this file
This document is a Performance Work Statement (PWS) for the conversion of an automatic car wash to a manual vehicle wash rack at Davis-Monthan Air Force Base in Arizona.
The PWS requires the contractor to provide all necessary tools, materials, supplies, equipment, transportation, personnel, labor, supervision, and management to inspect, maintain, and convert a single automatic car wash into three manual vehicle wash bays. The key specifications include installing commercial-grade pumps, electrical panels, stainless steel holding tanks, compressors, booms, and a foaming brush system. The contractor must also provide startup supplies, safety equipment, and comply with all security and safety requirements on the base. This PWS is attached to a Sources Sought notice for the Automatic to Manual Wash Rack Conversion, seeking responses from interested contractors to confirm their capability and business size. The contract will be awarded by the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Picture Diagram WashRack Final 1.pdf | ||
| Salient-Characteristics-Template (002).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement For the
Automatic to Manual Wash Rack Conversion
1.0 Description of Services. The contractor shall provide all tools, parts, equipment, and material (to include detergents and operating supplies), transportation, personnel, labor, supervision, and management necessary to perform construction on the wash rack at Davis-Monthan AFB, AZ
1.1 Conversion from Automatic to Manual. Contractor will demo and remove all existing equipment. Properly dispose of all equipment off base. Provide 3 manual wash bay pumping stations with following specifications: a. PUMPS: Pulley-drive CAT Plunger Pumps
b. ELECTRICAL PANELS: High-quality, solid-state controls for long trouble-free service. (UL Listed).
c. STAINLESS STEEL SUPPLY TANKS.
d. MOTOR: 5 HP TEFC Three phase
e. SOLENOID VALVES: Stainless Steel solenoid valves for both soap and wax lines.
f. GRAVITY-FEED SYSTEMS feature a stainless holding tank with float valves for uninterrupted water supply.
g. PRESSURE GAUGES: Stainless case, Glycerin-filled gauges for accurate readings of output pressure.
h. HOUR METER: Ideally suited for indication of pump system running time for maintenance and service requirements.
i. STAINLESS STEEL FRAME: Constructed with adjustable isolators on each leg.
1.2 Items Provided by Contractor
3. Provide 1" Water Softener, Commercial Grade, 71,000 Max Grain Capacity, Digital controller
4. Provide 5HP 3 Phase 2-Stage 80 Gallon Air compressor with auto-drain and regulator as needed
5. Provide qty 3 stainless steel 360 degree ceiling mount dual booms (wand and brush)
6. Provide air powered foaming brush system, 3 bay, with solenoids, pumps, stainless mixing tank, and all controls
7. Provide Qty 3 stainless remote boxes with controls
8. Provide 30 gallons of Wash Soap, 30 gallons brush soap, 30 gallons wax, and 20 bags of salt for system startup
9. Provide all rental equipment required to complete installation
10. Provide all labor, travel, perdiem to provide a turn-key installation
11. Provide all electrical work including breaker panels, disconnects, conduit, and wiring to provide a complete installation
12. Provide all pluming required including installation qty 2 oversized PVC conduits to each ceiling mounted boom. One conduit provide and pull high pressure hose for wand, One conduit provide and pull hose for brush.
1.3 Safety Equipment and Clothing. The contractor shall provide contractor employees with all safety equipment and clothing necessary to perform services, at no additional cost to theGovernment.
These item(s) shall meet all State, Federal and OSHA safety guidelines.
1.5 Safety. The contractor shall comply with applicable laws and safety regulations. Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor, and the Government will assume no liability or responsibility for the contractor’s compliance or noncompliance with such responsibilities.
1.5 Security Requirements
- List of Employees. The contractor shall maintain a current list of employees, with each employee’s name and social security number. The list shall be provided to the contracting Officer and the 355 LRS Security Manager. An updated listing shall be provided when an employee’s status or information changes.
-Pass and Identification Items. The contractor shall ensure the pass and identification items required for contract performance are obtained for employees and Non-Government owned vehicles.
-Retrieving Identification Media. The contractor shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires;
e.g. terminated for cause, retirement, etc.
-Traffic Laws. Contractor employees shall comply with all base traffic regulations.
Contractor employees are subject to random vehicle speed control check. Failure to adhere to base traffic regulations may result in the loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phone is strictly prohibited while driving on Davis- Monthan AFB unless a hands free device is used.
-Weapons, Firearms, and Ammunition. Contractor employees are prohibited from processing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately owned while on DMAFB.
-Random Personnel and Vehicle Searches. Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of the base driving privileges, debarment from the base, or other administrative action.
-Reporting Requirements. Contractor personnel shall report to an appropriate Government authority any information or circumstances of which they are aware may pose a threat the security of Department of Defense personnel, contractor personnel, resources, and classified or unclassified defense information.
-Physical Security. The contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
-On-Base Security Forces and Fire Protection. For Security Forces dial 228-4444 from any inside or outside line. The fire departments’ phone number from an on base phone is 911.
File details come from the government source that posted it. Updated .