Attachment 11 CONTRACTOR PERFORMANCE QUESTIONNAIRE.doc
DOC document 55 KB Posted
- Attached to
- RECOVERY FBNV 090003A Construct Water Wells/Waste Water Systems. RECOVERY FBNV 090003B Repair Water Wells.
- Solicitation number
- FA4877-09-R-0014
About this file
FA4877-09-R-0014 Solicitation Attachment 11 CONTRACTOR PERFORMANCE QUESTIONNAIRE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Prebid Questions and answers 8-7-2009.doc | DOC document | |
| Combined Prebid Questions and answers 8-7-2009.doc | DOC document | |
| Combined Prebid Questions and answers 8-4-2009.doc | DOC document | |
| Equipment matrix 7-29-09.xls | XLS spreadsheet | |
| DMAFB-DCG-Dec07.pdf | ||
| Sing-in sheet.pdf | ||
| Attachment 6 Sheet 7 Well 9.pdf | ||
| Attachment 6 Sheet 5 Well 4.pdf | ||
| Attachment 5 Design Requirements 090003B.pdf | ||
| Attachment 6 Sheet 1 - 4.mdi | MDI file | |
| Attachment 7 090003A AF FORM 66.xlsx | XLSX spreadsheet | |
| Attachment 9 090003A Section 01010 | — | |
| Attachment 2 Statement of Work 090003A.pdf | ||
| Attachment 6 Sheet 6 Well 6.pdf | ||
| FA4877-09-R-0014 RFP.doc | DOC document | |
| Attachment 4 Design Requirements 090003A.pdf | ||
| Attachment 10 090003B Section 01010 | — | |
| Attachment 1 DOL Wage Determination.pdf | ||
| Attachment 8 090003B AF FORM 66.xlsx | XLSX spreadsheet | |
| Attachment 3 Statement of Work 090003B.pdf | ||
| Attachment 6 Sheet 8 Site 5 Tank.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4877-09-R-0014
Attachment 11
CONTRACTOR PERFORMANCE QUESTIONNAIRE
The below-named contractor is being considered for award of a contract for Solicitation No. FA4877-09-R-0014, "Construct / Repair Water Wells". The scope of work includes digging wells, replacing pumps and support equipment to include electrical service entrances, electrical and water metering, Variable Frequency Drive (VFD), security support equipment, and fencing and out buildings. It also includes the replacement of a major 8” water line by taxiway Alpha. Additionally, it includes the replacement of the water tower at site 5 and all of its support equipment on Aerospace Maintenance and Regeneration Group (AMARG) and Davis-Monthan AFB.
A primary consideration in our selection process is the contractor’s history of performance of similar efforts. Please make every effort to be thorough in your answers/comments. Return the completed questionnaire to the following address:
355 CONS/MSCAA
3180 S. Craycroft Road
Davis-Monthan AFB AZ 85707-3522
Please refer any questions to: Bryan Jackson at (520) 228-5441 or you may email him at the following address: bryan.jackson@dm.af.mil
A. GENERAL INFORMATION
Contractor’s Name: ________________________________________________________________
Address: ______________________________________________________________________
Telephone Number: ______________________ Point of Contact: _______________________
B. RESPONDENT INFORMATION
Name: __________________________________ Title: _____________________________
Organization & Address: ___________________________________________________________
Telephone: ___________________ Fax: ________________ Email: ____________________
C. CONTRACT INFORMATION
Contract Number/Title: ____________________________________________________________
Period of Performance: _________________ Dollar Amount of Contract: _________________
Services Performed: ______________________________________________________________________________
D. PERFORMANCE INFORMATION
Choose the category on the below scale that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF Substantial Confidence, Limited Confidence, or No Confidence.
1 - Substantial Confidence: Based on the offeror’s performance record, the government has a high expectation that the offeror will successfully perform the required effort.
2 - Satisfactory Confidence: Based on the offeror’s performance record, the government has an expectation that the offeror will successfully perform the required effort.
3 - Limited Confidence: Based on the offeror’s performance record, the government has a low expectation that the offeror will successfully perform the required effort.
4 - No Confidence: Based on the offeror’s performance record, the government has no expectation that the offeror will be able to successfully perform the required effort.
5- Unknown Confidence: No performance record is identifiable or the offeror’s performance record is so limited that no confidence assessment rating can be reasonably assigned.
Please use the above ratings to describe the contractor’s performance in the following areas:
1. MANAGEMENT EFFECTIVENESS
| a. Contractor provided experienced managers and supervisors with technical and administrative abilities to meet contract requirements. |
| 1 2 3 4 5 |
| b. Contractor maintained appropriate staffing levels (number/ qualifications) |
| 1 2 3 4 5 |
| c. Contractor effectively managed materials requirements (i.e., maintained adequate stock levels) |
| 1 2 3 4 5 |
| d. Contractor effectively oversaw/managed subcontractors |
| 1 2 3 4 5 |
| e. Contractor’s overall management effectiveness |
| 1 2 3 4 5 |
COMMENTS/REMARKS:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
2. QUALITY OF SERVICE AND WORKMANSHIP
| a. Contractor maintained acceptable standards of workmanship |
| 1 2 3 4 5 |
| b. Contractor provided acceptable-quality materials |
| 1 2 3 4 5 |
| c. Contractor’s overall quality of service |
| 1 2 3 4 5 |
COMMENTS/REMARKS:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
3. TIMELINESS/ADHERENCE TO SCHEDULES
| a. Contractor completed scheduled tasks within stated time frames |
| 1 2 3 4 5 |
| b. Contractor was proactive in keeping you informed of schedule changes if they were going to occur |
| 1 2 3 4 5 |
| c. Contractor responded to emergency requirements in a timely manner |
| 1 2 3 4 5 |
| d. Overall contractor timeliness |
| 1 2 3 4 5 |
COMMENTS/REMARKS:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
4. QUALITY CONTROL
| a. Contractor provided an adequate quality control plan |
| 1 2 3 4 5 |
| b. Contractor adhered to its quality control plan |
| 1 2 3 4 5 |
| c. Contractor’s quality control resulted in little/no work on your part to achieve acceptable service (i.e.-few failed inspections) |
| 1 2 3 4 5 |
| d. Contractor documented its quality control checks/corrective actions |
| 1 2 3 4 5 |
| e. Contractor’s overall quality control |
| 1 2 3 4 5 |
COMMENTS/REMARKS: _______________________________________________________
5. CUSTOMER SATISFACTION
| a. Contractor maintained a professional working relationship |
| 1 2 3 4 5 |
| b. Contractor was reasonable and cooperative in resolving customer complaints |
| 1 2 3 4 5 |
| c. Contractor was flexible in responding to customer requirements |
| 1 2 3 4 5 |
| d. Overall customer satisfaction |
| 1 2 3 4 5 |
COMMENTS/REMARKS:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
6. Compliance with Environmental/Labor/Safety Requirements
| a. Environmental requirements |
| 1 2 3 4 5 |
| b. Labor laws |
| 1 2 3 4 5 |
| c. Workplace safety |
| 1 2 3 4 5 |
| d. Overall compliance |
| 1 2 3 4 5 |
COMMENTS/REMARKS:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
7. If a government contract, did the contractor receive any Contract Discrepancy Reports, Letters of Concern, or Cure Notices? __________ if yes, please describe:
8. If given the opportunity, would you award another contract to this contractor? Please explain response below.
FA4877-09-R-0014
Attachment 11