Repair Water Main, Tyndall Avenue, RFP: FA4861-09-R-A018 Contract:
Attachment #2
SPECIFICATIONS
FOR
REPAIR WATER MAIN, TYNDALL
AVENUE
RKMF 08-0020
NELLIS AIR FORCE BASE, NEVADA
OFFICE OF THE BASE CIVIL ENGINEER
APPROVED:
1-JUL-2009
CONTRACTING OFFICER DATE
(1-JUL-2009)
INDEX Page i
SPECIFICATION INDEX
DIVISION 00 PROCUREMENT AND CONTRACTING
REQUIREMENTS DATED PAGES
00 01 07 SEALS PAGE 01 Jul 09 1
00 01 15 LIST OF DRAWINGS 01 Jul 09 2-3
00 10 10 SUMMARY OF WORK 01 Jul 09 4-33
00 13 00
SUBMITTAL AND SUBSTITUTIONS
AF FORM 66, Schedule of Material Submittals 01 Jul 09 34-38
00 41 00 BID SCHEDULES 01 Jul 09 39-39
DIVISION 01 GENERAL REQUIREMENTS DATED PAGES
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES 01 Jul 09 40-42
01 22 00.00 10 MEASUREMENT AND PAYMENT 01 Jul 09 43
01 30 00 ADMINISTRATIVE REQUIREMENTS 01 Jul 09 44-47
01 33 00 SUBMITTAL PROCEDURES 01 Jul 09 48-55
01 35 13 SPECIAL PROJECT PROCEDURES 01 Jul 09 56-60
01 42 00 SOURCES FOR REFERENCE
PUBLICATIONS 01 Jul 09 61-66
DIVISION 02 EXISTING CONDITIONS DATED PAGES
02 41 00 DEMOLITION 01 Jul 09 67-74
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS
CONTAINING MATERIALS 01 Jul 09 75-92
INDEX Page ii
DIVISION 03 CONCRETE DATED PAGES
03 11 14.00 10 FORMWORK FOR CONCRETE 01 Jul 09 93-97
03 15 14.00 10
EXPANSION, CONTRACTION AND
CONSTRUCTION JOINTS IN CONCRETE
FOR CIVIL WORKS
01 Jul 09 98-100
03 20 01.00 10 CONCRETE REINFORCEMENT 01 Jul 09 101-104
03 30 53 MISCELLANEOUS CAST-IN-PLACE
CONCRETE 01 Jul 09 105-119
03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS
FOR BELOW GRADE CONSTRUCTION 01 Jul 09 120-132
DIVISION 04 MASONRY DATED PAGES
04 20 00 MASONRY 01 Jul 09 133-147
INDEX Page iii
SPECIFICATION INDEX
DIVISION 31 EARTHWORK DATED PAGES
31 00 00 EARTHWORK 01 Jul 09 148-161
DIVISION 32 EXTERIOR IMPROVEMENTS DATED PAGES
32 11 23 AGGREGATE BASE COURSE 01 Jul 09 162-171
32 12 10 BITUMINOUS TACK 01 Jul 09 172-176
32 12 17 HOT MIX BITUMINOUS PAVEMENT 01 Jul 09 177-193
32 13 13.03
AIRFIELDS AND HEAVY-DUTY CONCRETE
PAVEMENT LESS THAN 10000 CUBIC
YARDS
01 Jul 09 194-224
32 13 73 COMPRESSION JOINT SEALS FOR
CONCRETE PAVEMENTS 01 Jul 09 225-232
32 16 13 CONCRETE SIDEWALKS AND CURBS AND
GUTTERS 01 Jul 09 233-246
32 17 24.00 10 PAVEMENT MARKINGS 01 Jul 09 247-254
32 31 13 CHAIN LINK FENCES AND GATES 01 Jul 09 255-264
32 84 24 IRRIGATION SPRINKLER SYSTEMS 01 Jul 09 265-272
32 96 00 TRANSPLANTING EXTERIOR PLANTS 01 Jul 09 273-282
DIVISION 33 UTILITIES DATED PAGES
33 11 00 WATER DISTRIBUTION 01 Jul 09 283-302
(1-JUL-2009
SECTION 00 01 07 Page 1
SECTION 00 01 07
SEALS PAGE
06/09
The following design professionals certify that the Contract Drawings and Specifications were prepared by them or under their direct supervision.
Initials of each registered engineer appear in the Table of Contents following the titles of technical specification sections for which each design professional was responsible.
John P. Meng, P.E. (JPM)
Jacobs Engineering
-- End of Section --
SECTION 00 01 15 Page 2
SECTION 00 01 15
LIST OF DRAWINGS
01/07
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING TITLE
NO.
CS-01 COVER SHEET
CS-02 GENERAL NOTES
KP-01 KEY MAP
PR-01A PLAN/PROFILE STA: 7+11 TO STA: 10+28
PR-01 PLAN/PROFILE STA: 10+00 TO STA: 19+00
PR-02 PLAN/PROFILE STA: 19+00 TO STA: 28+00
PR-03 PLAN/PROFILE STA: 28+00 TO STA: 37+00
PR-04 PLAN/PROFILE STA: 37+00 TO STA: 39+64
PR-05 PLAN/PROFILE STA: 40+00 TO STA: 49+00
PR-06 PLAN/PROFILE STA: 49+00 TO STA: 58+00
PR-07 PLAN/PROFILE STA: 58+00 TO STA: 67+00
PR-08 PLAN/PROFILE STA: 67+00 TO STA: 76+00
PR-09 PLAN/PROFILE STA: 76+00 TO STA: 85+00
PR-10 PLAN/PROFILE STA: 85+00 TO STA: 94+00
PR-11 PLAN/PROFILE STA: 94+00 TO STA: 103+00
PR-12 PLAN/PROFILE STA: 103+00 TO STA: 112+00
PR-13 PLAN/PROFILE STA: 112+00 TO STA: 121+00
LT-01-TYN FIRE HYDRANT LATERAL TYNDALL ALIGNMENT
LT-02-TYN FIRE HYDRANT LATERAL TYNDALL ALIGNMENT
LT-03-TYN FIRE HYDRANT LATERAL TYNDALL ALIGNMENT
LT-04-TYN FIRE HYDRANT LATERAL TYNDALL ALIGNMENT
PR-14 PLAN/PROFILE STA: 125+00 TO STA: 132+00
PR-15 PLAN/PROFILE STA: 132+00 TO STA: 141+00
PR-16 PLAN/PROFILE STA: 141+00 TO STA: 150+00
PR-17 PLAN/PROFILE STA: 150+00 TO STA: 159+00
PR-18 PLAN/PROFILE STA: 159+00 TO STA: 168+00
PR-19 PLAN/PROFILE STA: 168+00 TO STA: 177+00
PR-20 PLAN/PROFILE STA: 177+00 TO STA: 186+00
PR-21 PLAN/PROFILE STA: 186+00 TO STA: 195+00
PR-22 PLAN/PROFILE STA: 195+00 TO STA: 204+00
PR-23 PLAN/PROFILE STA: 204+00 TO STA: 210+81
LT-05-FL FIRE HYDRANT LATERAL FLIGHTLINE ALIGNMENT
LT-06-FL FIRE HYDRANT LATERAL FLIGHTLINE ALIGNMENT
LT-07-FL FIRE HYDRANT LATERAL FLIGHTLINE ALIGNMENT
LT-08-FL FIRE HYDRANT LATERAL FLIGHTLINE ALIGNMENT
PR-24 PLAN/PROFILE STA: 211+00 TO STA: 217+00
SECTION 00 01 15 Page 3
PR-25 PLAN/PROFILE STA: 217+00 TO STA: 222+12
PR-26 PLAN/PROFILE STA: 223+00 TO STA: 228+18
PR-27 PLAN/PROFILE STA: 229+00 TO STA: 233+67
PR-28 PLAN/PROFILE STA: 234+00 TO STA: 241+73
PR-29 PLAN/PROFILE STA: 241+73 TO STA: 243+61
PR-30 PLAN/PROFILE STA: 244+00 TO STA: 247+99
PR-31 PLAN/PROFILE STA: 249+00 TO STA: 252+27
LT-09-IN FIRE HYDRANT LATERAL INTERMEDIATE ALIGNMENTS
PR-32 PLAN/PROFILE STA: 275+00 TO STA: 278+48
DT-01 DETAILS
DT-02 DETAILS
DT-03 DETAILS
DT-04 DETAILS
DT-05 DETAILS
HC-01 HORIZONTAL CONTROL
HC-02 HORIZONTAL CONTROL
HC-03 HORIZONTAL CONTROL
HC-04 HORIZONTAL CONTROL
HC-05 HORIZONTAL CONTROL
SECTION 00 10 10 Page 4
SECTION 00 10 10
SUMMARY OF WORK
1. PART 1 - GENERAL
1.1. SUMMARY
1.1.1. Description: Contractor shall furnish all labor, equipment, material, manufactured articles, labor, transportation, supervision, and all else necessary to perform all operations in connection with successfully completing the project REPAIR WATER MAIN, TYNDALL AVENUE, as specified herein, as required per attached specifications and referenced documents, and as shown on attached project drawings.
1.1.2. Definitions:
1.1.2.1. Contracting Officer: The Contractor shall be responsible for providing complete and usable facilities upon the completion of work. Henceforth, the term Contracting Officer refers to the Contracting Officer or his/her designated representative, and the term Contractor refers to the general contractor. The general contractor is responsible for all subcontractors, suppliers, and consultants under his employ.
1.1.2.2. Contracting Officer’s Representative: The Base Civil Engineer or his authorized representative is designated as the Contracting Officer's Representative (COR) (Construction Manager), for the purpose of technical surveillance and evaluation of the work performed under this contract. This designation in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract.
1.2. LOCATION: The project sites will be located at Nellis AFB.
1.2.1. Nellis Air Force Base (NAFB) is located approximately nine (9) miles north of downtown Las Vegas on Highway U.S-93 (Las Vegas Blvd). NAFB consists of three main areas: the Main Base, Area II, and Area III. The specific project locations are indicated on drawings accompanying each task order issued against this contract.
1.2.2. Creech AFB – Not Applicable to this project.
1.3. DESCRIPTION OF WORK
1.3.1. SCOPE OF WORK: The scope shall include, but not be limited to the following descriptions:
SECTION 00 10 10 Page 5
The purpose of this project is to replace aging water system infrastructure in the Tyndall area at the Nellis AF Base. Two existing looped water mains located on Tyndall Avenue and on the eastside of the Tyndall hangars (flight line side) at Nellis AF Base are over 50 years old and have reached the end of their service life. The Tyndall Avenue water main runs from Well No. 7 to Fitzgerald Boulevard and consists of approximately 7,000 LF of 10 inch and 8 inch cast iron pipe and approximately 6,000 LF of 12 inch and 14 inch asbestos concrete pipe (ACP). The flight line water main runs from the southwest side of Hangar #220 to Fitzgerald Blvd. and consists of approximately 6,750 LF of 8 inch cast iron pipe and approximately 2,750 LF of ACP. Also, there is approximately 3,800 LF of water pipe which loops the Tyndall Avenue water main to the flight line water main at various locations. The age and current conditions for both water mains & their valves pose a number of problems for the base which includes the following:
reduced chlorine residuals due to shallow water line depths, inadequate fire flows, inadequate isolation valves, higher repair parts inventory due to the numerous piping materials used and environment and personal health risks due to the use of ACP pipe.
The contractor is to replace water lines in accordance with the plans and specifications as prepared by the A-E, Carter & Burgess, and approved by the Nellis Air force base. This scope of work includes the replacement of all water lines as outlined in the plans with PVC water pipes. This includes approximately 1,200 lf of 8” PVC water main, 23,000 lf of 10” PVC water main and 2,000 lf of 12” PVC water main along with all necessary valves, fittings, and accessories. The existing water line will be abandoned in place at most locations and removed at any locations which conflict with the new water lines. The surfaces disturbed by construction shall be repaired to existing or better condition. Surface repair will include, without limit, such items as: asphalt concrete in parking and roadway areas, surface marking on the asphalt concrete, concrete drainage channel, concrete sidewalk, concrete curb, concrete pavement in the flight-line, landscaped areas and open unpaved areas. All of the existing fire hydrants are to be abandoned and removed by the contractor and new hydrants are to be installed at specified locations per plan. Also, the existing water services and fire services for each building are to be field verified and reconnected to the new water mains.
Newly constructed water lines and appurtenances shall not be put into service until they are properly pressure tested and disinfected. Services shall not be connected to the new water mains until the newly constructed mains are put into service. After all services have been connected to the new mains, the contractor can properly abandon old lines. There shall be no reduction in service anywhere on base. It is the contractor’s responsibility to determine the best way to perform construction phasing and water line replacement such that there will be a looped system able to supply fire demand at all times during construction.
All construction shall comply with the latest approved editions of the American Water Works Association (AWWA), Uniform Plumbing Code (UPC), the International Building Code (IBC), and the Uniform Design and Construction Standards for Potable Water Systems. Also, there are many codes indicated in the
SECTION 00 10 10 Page 6 specifications requirements for this project which must be referenced and adhered to during construction.
It is expected that trench excavation will require removal of various types of material, including cemented soils and rocks (caliche). The hardness of cemented soils can range from moderately cemented to strongly cemented and can occur in subsurface soils at erratic thickness, hardness and lateral extent. Rock excavating techniques should be anticipated if there is caliche present in the soils. The contractor is to verify subsurface conditions prior to bid. The cost for the excavation of rock and cemented soils encountered shall be considered as included in the unit prices bid for pay items requiring excavation and no additional compensation will be allowed.
1.3.2. PERFORMANCE PERIODS: The Contractor is to commence work within 1 calendar day after the notice to proceed (NTP). Construction may begin after pre-construction submittals have been approved and a secondary NTP is issued.
Contractor is to prosecute the work diligently. Completion of the project includes final cleanup and close out submittals.
Pre-Construction Submittals Within 30 days from NTP
Commence Construction Within 5 days of Secondary NTP
Complete Project Within 360 days from NTP
1.3.3. SINGLE, PRIME CONTRACT: The work will be constructed under a single, prime contract.
1.3.4. TESTING: Quality control testing is the responsibility of the Contractor, and shall be performed by an independent commercial testing laboratory. The type and amount of testing is stated in the applicable specifications; the cost of the testing shall be incorporated in the bid price for each applicable line item.
1.3.4.1. Contractor shall forward all water quality clearance sample results to Bio- Environmental Engineering prior to activation of the new main line.
1.4. RESTRICTIONS:
1.4.1. Airfield:
1.4.1.1. Aircraft and emergency fire department vehicles always have the right of way. Construction personnel, vehicles and equipment must yield to taxiing aircraft at all taxiway crossing points.
1.4.1.2. The Contractor must only use designated taxiway crossing points, unless otherwise directed.
1.4.1.3. Runways must be cleared of equipment and personnel and be operationally ready within five minutes in the case of In-Flight Emergencies (IFEs), unless the runway is physically unable to accept aircraft. No contractor vehicles, equipment, or personnel shall be on or crossing any active runway, except during construction period closures as outlined above or when clearance is requested from and granted by the control tower.
SECTION 00 10 10 Page 7
1.4.1.4. The Contractor shall be issued a hand held radio in order to be able to communicate with the airfield control tower. The on-site project manager shall be expected to continuously monitor the airfield frequency.
1.4.1.5. Unless authorized by the Contracting Officer, no contractor vehicles, equipment or personnel shall cross the painted red security lines located at various locations on the Airfield. Security Police are authorized to use deadly force in such breaches of security.
1.4.1.6. Other airfield contracts may be underway at the same time as this contract, and therefore the contractors may have to share haul routes, and work in the proximity of one another. The contractor shall fully comply with Contract FAR Clause 52.236-8, Other Contracts.
1.4.1.7. The Contractor may be required to cease project operations on the airfield during IFEs or as directed by the Installation Commander. These delays typically are for one to two hours at a time. Every effort will be made by Base Operations, Civil Engineering, and the Contracting Office to minimize all potential delays and to inform the Contractor as early as possible of such delays so that critical work can be effectively scheduled around such events.
For bidding purposes, assume work stoppages will occur once during each project and last for two hours each occurrence.
1.4.1.8. All contractor personnel shall be briefed by Base Operations prior to being allowed to drive on flight line road and if required, on the airfield. The Contractor shall clear the airfield, the flight line road and the hangar approach apron entrance areas when directed by Base Operations to do so for any circumstance or when aircraft are parked. Security Force personnel are authorized to use deadly force in these areas. Flying activity is minimal on weekends.
1.4.1.9. For all work on the flight line side (east side) of the aircraft hangars, the contractor shall prepare & submit a construction phasing plan for government review and approval. The contractor shall coordinate on a daily basis with the airfield Base Operations Office his daily work plan and shall be available to meet with Contracting Office, the AF project manager, CE, Base Operations, the individual aircraft hangar facility manager(s) and / or their units on a Bi-weekly basis to plan & coordinate well in advance of work, which hangar apron entrances the contractor plans to saw-cut, trench and work on and to determine the time frame that will work best for the hangar user. Should a schedules conflict occur, the hangars user's needs shall take precedence over the contractor's work schedule. The construction phasing plan & bi-weekly planning meetings shall take into account and address the following government requirements:
1.4.1.9.1. The contractor shall limit the amount of open trenching to the lesser of 500 linear feet or the length necessary to accommodate one day of pipe trenching as called for in the General Waterline Notes section on the drawings. The contractor shall not infringe on or close down any portion of the flight line road that runs the full length of airfield parking apron or
SECTION 00 10 10 Page 8 any flight line entry point from Tyndall Avenue. The contractor shall keep at least one lane open for vehicle traffic at the flight line entry point(s) for any work scheduled to take place at these locations.
1.4.1.9.2. The contractor shall schedule his work on the aircraft parking apron & hangar apron entrances adjacent to the Red Flag aircraft hangars #220, #222, #224, and #226 and the Green Flag aircraft hangars #237, #239, and #242 & their operations buildings located at the South end of the flight line IAW the following schedule to avoid any conflict with the Red Flag & Green Flag scheduled aircraft training exercises:
• For Red Flag hangar areas, use 17 Oct 2009 through 14 Jan 2010 or 14 Mar 2010 through 4 Aug 2010.
• For Green Flag hangar areas, use 21 Nov 2009 through 22 Jan 2010 or 5 Jun 2010 through 15 Jul 2010.
• The government reserves the right to change the contractor’s construction window dates for military exercises in the remote event a Flag exercise schedule must change or if aircraft, equipment & personnel access to a hangar or flight line facility must be temporarily maintained in conflict with the contractor’s proposed construction schedule. The contractor shall accept this requirement as an important consideration of the work, that the construction dates between military exercises and or on individual hangar apron entrances can change.
1.4.1.9.3. The contractor shall refer to construction drawing sheet KP-01 for an overview of the flight line project and sheets PR-14 & PR-15 for the Red Flag hangar areas and sheet PR-16 & PR-17 for the Green Flag hangar areas.
1.4.1.9.4. The contractor shall provide each facility user(s) sufficient advance notice (2 weeks) and adequate time to remove their aircraft & equipment from those hangars with only "one" apron entrance scheduled for contractor work. Should the user's operational requirements for those hangars with one apron entrance still require hangar access & egress, the contractor shall provide for & install aircraft load rated steel trench plates with beveled edges. For those hangars with two (2) apron entrances, the government prefers the contractor trench and complete work on one entrance at a time but the contractor has the option of trenching both entrances, provided he or she shall provide for & install aircraft load rated steel trench plate covers at one entrance or the other at all times to allow the hangar user & their aircraft & equipment access to the hangars from the flight line or vice versa. The steel plate trench covers shall be capable of supporting a fully fueled F-22 fighter at 63.5 Kips and include beveled edges. The F-22 main gear at 80% of aircraft weight will weigh 51 Kips and are 12.5ft apart.
SECTION 00 10 10 Page 9
1.4.1.9.5. The contractor shall submit the steel plate cover design for government review & approval. The steel cover design shall be sealed, dated & signed by a registered professional Civil or Structural Engineer.
1.4.1.9.6. Piping and related materials shall remain in the contractor's storage area, except during the same day the materials are installed. The contractor shall deposit all excavated material & debris on the west side of the trench & away from parked aircraft. Any excess backfill material shall be removed from the flight line and government property or stored for re-use as backfill at the pre-designated contractor's storage yard.
Under no circumstance shall the contractor allow foreign object debris (FOD) to accumulate on the flight line.
1.4.1.9.7. The contractor shall collect lose debris his crew or the construction effort generates each day to prevent any FOD from becoming airborne that can cause aircraft engine damage. During periods of work inactivity, between work phases and /or when a trench must remain open or when new placed concrete slabs must cure, the contractor shall provide for & install an adequate number of steel plate trench covers of sufficient size and strength that are aircraft load rated with beveled edges to allow for continued aircraft, personnel & equipment access to the hangar(s) from the flight line.
1.4.1.9.8. The contractor shall provide for & install lighted barricades for all construction areas not steel plated and flaggers at essential jobsite locations considered necessary by the Contracting Officer or Base Operations. Concrete paving of the utility trenches shall be accomplished as each construction location is completed. In all cases, the contractor shall make every reasonable effort to keep the Contracting officer, the AF Project Manager, the Base Operations Management and all individual aircraft hangar users who shall be affected by pending trench work or water outages, informed of his or her work plans & schedule and shall minimize the time a hangar apron entrance must be closed or remain closed to complete work.
1.4.1.10. For all work on Tyndall Ave along the west side of the aircraft hangars, the Contractor shall prepare and submit a construction plan for phasing the work for government review & approval. The contractor shall maintain 2 way traffic flow along Tyndall Ave throughout the project and provide for and install suitable H-20 traffic truck load rated steel plate cover where traffic is required to cross trenches, lighted barricades, traffic cones and flaggers where required to maintain 2 way safe vehicle traffic flow and away from exposed & excavated work areas including trenches. The contractor shall schedule and conduct work to prevent interference wit the facilities and systems outside the specific portion of the project under construction.
1.4.1.10.1. The contractor shall maintain pedestrian access to the buildings at all times and vehicle access to building parking lots except that such access may be interrupted for a maximum duration of 10 hours. Access and
SECTION 00 10 10 Page 10 travel along streets and parking areas shall be maintained to the greatest extent possible. Where street crossings are required, one half of the street shall remain open at all times, except that streets may be interrupted for a maximum duration of 10 hours only when necessary. Work shall be scheduled so that no more than 500 linear feet (as measured along the road centerline) or water pipe is under construction at any location and at not more than two concurrent construction locations. Asphalt paving of the utility trenches shall be accomplished as each construction location is completed. Exceptions to these conditions may be made in specific situations if requested by the contractor in advance and if deemed necessary & in the best interests of the AF by the Contracting Officer.
1.4.1.10.2. Provide steel plate covers for trenches and other excavations which must remain open after working hours. Piping and related materials shall remain in the contractor’s storage area, except during the same day the materials are installed. Before the end of each workday, all excavation material in excess of required backfill shall be either removed from government property, or removed and stored for re-use as backfill at the area indicated for the contractor’s storage yard. Excess excavation material and debris shall not be allowed to accumulate at the jobsite.
Work that requires interruption of water services shall be limited to one section piping, between two adjacent isolation valves at any time.
1.4.1.10.3. Piping outside the specific section under construction shall remain in operation throughout the entire construction process. Maximum time for interruption of water service to individual buildings is limited to 10 hours.
The 10 hours shall include time for disconnection and reconnection of piping.
1.4.1.10.4. A path for emergency vehicles to all buildings & facilities shall be maintained at all times. To create and maintain this path, provide all required traffic control devices such as no parking signs, traffic cones, barricades, etc. The contractor shall remove construction equipment from the work site and store at the contractor’s storage area at the end of each day.
1.4.1.10.5. A general notice of up-coming construction shall be given to all facility users by the government. But three (3) days prior to a facility experiencing a water outage, the contractor shall be required to notify the facility occupants with a written notice of the scheduled utility outage.
The government will supply the contractor a template copy of the written notice.
1.4.2. FAA Notification: Contractor shall submit the required FAA Form 7460-1 to the FAA via https://oeaaa.faa.gov/oeaaa/external/portal.jsp for all new construction, work on the exterior of existing facilities, and all crane usage. Contractor will follow any and all requirements dictated by the FAA or Nellis AFB Airfield Operations personnel in response to the FAA Form 7460-1 submittal.
SECTION 00 10 10 Page 11
1.4.3. NELLIS AIR FORCE RANGE & BASE SECURITY REQUIREMENTS:
Range requirements not Applicable to this project.
1.5 SITE VISIT: Contractors are urged to attend the site visit that will be scheduled by Base Contracting prior to the bid opening. (See Contract FAR Clauses 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigation and Conditions Affecting the Work)
1.6 NOTICE TO PROCEED: At the beginning of a project, the Contracting Officer shall initiate a Notice to Proceed (NTP) to allow design/construction work to begin. This shall not occur until after the appropriate bonds have been received by the Contracting Officer after contract award. The performance times for the project are described in paragraph “Performance Periods”. At the beginning of a project, the Contracting Officer shall initiate a Notice to Proceed #1(NTP1) so that the Contractor can perform <design> initial material tests, get submittals approved, and mobilize equipment. At the beginning of the first construction performance window, and if all necessary submittals have been approved by the Contracting Officer, the Contracting Officer shall initiate a NTP2 to allow actual demolition/construction work to begin. The performance times for the project are described in Paragraph 1.3.2 "Performance Periods", on page 001010- Error! Bookmark not defined..
1.7 GOVERNMENT-FURNISHED-PROPERTY (GFP): Not Applicable to this project.
1.8 WORKING HOURS: Standard working hours are from 7:00 a.m. to 4:00 p.m. Monday through Friday excluding Federal Holidays and the day after Thanksgiving. Deviations to this schedule will be considered if it is in the best interest of the government as determined by the Contracting Officer. The Contractor has the option of working 24 hours per day, seven days per week, excluding Federal Holidays. If the Contractor plans on working hours other than 7:00 am to 4:00 pm, Monday through Friday, he must submit to the Contracting Officer a work schedule at least three working days prior. It shall note the activities planned and the planned hours of work so that the construction inspectors can plan their work schedule. If inspectors are required to perform in excess of their normal duty days/hours solely for the benefit of the contractor, the actual cost of inspection at overtime rates will be charged to the contractor. These adjustments to the contract price shall be deducted from the next payment authorized after overtime rates have been determined.
1.9 COORDINATING AND SCHEDULING
1.9.1 Work Coordination: In order for the work to progress smoothly and cause minimal difficulties, it will be necessary for the contractor, construction inspector, project engineer, and Contracting Officer to maintain close and active coordination. Whenever work which will be "hidden" or which has not
SECTION 00 10 10 Page 12 been scheduled will be accomplished, notice must be given to both the Contracting Officer and the contract inspector as early as possible to ensure inspections are accomplished as required. If proper inspections are not accomplished as a result of such lack of notification, the Contractor bears the risk of possibly removing completed work and reaccomplishing such uninspected work at no cost to the government. All work schedules will be coordinated with the appropriate representatives of the Contracting and Technical Offices. All work shall be programmed and accomplished in such a manner that minimum inconvenience will be caused to the government. The Contractor shall provide a 2-3 week projected schedule that shall be updated at least on a weekly basis.
1.9.2 Progress Schedule: Progress schedules will only be required as specified in individual task orders. The schedule contemplated by Contract FAR Clause 52.236-15, Schedules for Construction Contracts, shall be accomplished on and in accordance with the instructions pertaining to AF Form 3064, Contract Progress Schedule, and as specified herein. A "network analysis system" may be used to supplement the proposed progress schedule.
• The Contract Progress Schedule shall be plotted weekly, from Saturday through Friday, beginning with the date of receipt of the Notice to Proceed (NTP) through the contract completion date. Once approved, schedules will not be changed without Contracting Officer direction and/or approval.
• The Work Elements, column B on the Contract Progress Schedule, shall be limited to 16 items and shall begin with the appropriate bond cost as item #1. Thereafter, each element shall be identified by the applicable, major element of work (e.g., 02000 Site Work, 03000 Concrete, etc.).
• The percentage of each listed work element of the job shall be shown opposite each major work element in Column C of the Contract Progress Schedule and may be expressed in whole numbers or may be carried out to two (2) decimals.
• In order to assist in evaluating the Contract Progress Schedule, as well as the progress of construction, the contractor shall supplement the Contract Progress Schedule with a Schedule of Values worksheet which will identify each subelement of work along with its dollar and percentage values.
• High dollar value material items may be submitted for payment prior to installation in conformance with Contract FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, but must be clearly and separately identified in the Schedule of Values (either as a major or subelement of work) specified in the approved Contract Progress Schedule.
SECTION 00 10 10 Page 13
1.9.3 Progress Reports: Progress reports will only be required as specified in individual task orders. The report contemplated by Contract FAR Clause 52.236-15, Schedules for Construction Contracts, shall be accomplished on and in accordance with the instructions pertaining to AF Form 3065, "Contract Progress Report", and as specified herein.
• Progress Reports shall be submitted weekly on the Monday following completion of the previous rating period.
• Whenever the cumulative percentage of the work is 5% or more below the scheduled percentage, the Progress Report shall be accompanied by a letter of explanation for the delay and a plan detailing how the contractor intends to get back on schedule.
1.9.4 Estimated Line Items/Daily Quantity Certification:
• The contractor shall submit a daily running total of all such work completed. Submittals shall be in the format similar to that proscribed by Attachment #4 to the solicitation and may be supplemented with delivery tickets, waybills, worksheets, etc.
• The forms shall be completed for each workday of the performance period, even if no work was accomplished, and shall be submitted daily to the project inspector for verification and forwarding to the Contracting Officer.
• Payment of unit priced items will be made based on quantities that have been verified and accepted by the Government. At no time may the total used exceed the maximum total authorized for each line item
1.10 HAUL ROUTE
1.10.1 Specified Haul Route: The Contractor shall follow specified haul routes for this project, unless otherwise directed. The Contractor may make changes to the route only with the prior approval of the Contracting Officer at no additional cost to the Government. The Contractor shall restore the area to its original condition at the end of the contract period unless specific, written approval has been granted by the Contracting Officer.
1.10.2 Haul Route Cleanup: Refer to paragraph “Cleanup”.
1.11 MATERIAL STORAGE
1.11.1 Storage Area: Unless otherwise indicated, no on-base storage facilities are available for contractor owned supplies, tools, materials or equipment.
Buildings and structures which are part of the contract may be used for storage providing the space is not required for government occupancy and the contractor accepts full responsibility for the material stored therein. The
SECTION 00 10 10 Page 14
Contractor shall be responsible from protecting all construction materials from weather damage.
1.11.2 Storage Site: the Contracting Officer shall designate a storage site for contractor-owned supplies, tools, materials, and/or equipment in close proximity to the jobsite. All job equipment and material not in use, but to be installed in or used on the project by the Contractor may only be stored in this area. Security for the equipment and material storage shall be by the Contractor at his risk. Contractor shall install and maintain temporary fencing around storage area. Fence shall be a minimum of 6 feet high and have tan screening material so visibility through fence is obstructed. Fence shall be of sufficient strength to withstand imposed wind loads, shall remain in place for the duration of the contract, and be removed at the end of the contract at the contractor’s expense. Site shall be returned to its original condition.
1.12 UTILITIES SERVICES
1.12.1 Water and Electricity: In accordance with Contract FAR Clause 52.236-14, Availability and Use of Utility Services, all reasonable amounts of domestic water and electricity will be made available to the Contractor by the Government from existing system outlets and supplies. Normal quantities of electricity and water necessary to make final tests of completely installed systems will be furnished by the Government. With prior coordination with the Contracting Officer, the Contractor shall be given access to water hydrants to obtain water for construction activities. The Contractor shall provide and install a double back flow preventer with meter to all water hydrants made available to them for project use.
1.12.2 Telephone: Commercial telephone lines are not available to the contractor.
Separate communication arrangements must be made by the Contractor as necessary.
1.12.3 Temporary Utility Connections: The Contractor shall, at his own expense, make all temporary connections and install distribution lines. The Contractor shall furnish to the Contracting Officer a complete system layout drawing showing type of materials to be used and method of installation for all temporary electrical systems. All temporary lines shall be maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed and the area restored to its original (or better) condition by the Contractor prior to final acceptance of the construction. The point of connection shall be coordinated with the Government technical representative prior to connection. If additional outlets are needed they will be provided at the Contractor's expense.
1.13 EMERGENCY MEDICAL TREATMENT: The Mike O’Callaghan Federal Hospital will provide emergency medical treatment to employees of the Contractor for injuries incurred while working at Nellis AFB NV. The Contractor will be required to
SECTION 00 10 10 Page 15 reimburse the Government at an established rate for non-beneficiaries in accordance with AF Regulation 168-11. After receiving initial emergency treatment, the Contractor will provide the hospital with the name of a physician and/or hospital to which injured personnel can be transferred for further treatment and care. Follow-on care after initial emergency treatment will not be provided. There is very limited medical services available at Creech AFB and on the NTTR. The Contractor will be required to reimburse the Government at an established rate for non-beneficiaries in accordance with AF Regulation 168-11. After receiving initial emergency treatment, the Contractor will provide the hospital with the name of a physician and/or hospital to which injured personnel can be transferred for further treatment and care. Follow-on care after initial emergency treatment will not be provided.
1.14 CODES: All design and construction must be in compliance with the International Building Code (IBC-2006) (or most recent edition), Department of Defense Unified Facilities Criteria Standards (UFC), all Public Laws (P.L.), Executive Orders (E.O.), Code of Federal Regulations (CFR), Department of Defense Instructions (DODI), Department of Defense Directives (DODD), and Clark County, State of Nevada, and Federal standards, codes, and laws or other higher authority documents as applicable.
Any discrepancies between code or standards provisions and the contract documents shall immediately be brought to the Contracting Officer’s attention, and the more stringent requirements shall apply unless otherwise directed. All project design and construction shall meet requirements stated in the Nellis AFB Design Compatibility Guidelines. Contractors shall be responsible for obtaining any copies of all items referenced in this paragraph. Department of Defense criteria can be retrieved at:
http://cbbs.spk.usace.army.mil.
1.15 NELLIS AIR FORCE BASE ENTRY
1.15.1 Conformance with Regulations/Directives: The Contractor shall conform to base regulations and directives pertaining to security, safety, traffic, fire and personnel clearances, insofar as they pertain to the Contractor's activities as directed by the Contracting Officer.
1.15.2 Contractor Access: Reference contract clause CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS for details on obtaining base access passes for contractor personnel.
1.15.3 Enhanced Security Measures: During elevated force protection levels there may be increased security and more restricted access to Nellis AFB.
1.15.4 Additional Information: The following procedures and requirements for construction contractors requiring access, if followed, will assist in reducing delays in gaining access to work areas.
• At Nellis AFB, construction contractors may access the base through the Main Gate, Tyndall Gate, Range Road Gate, and Area II Gate. However, all commercial vehicles and vehicles larger than pickup trucks will be
SECTION 00 10 10 Page 16 required to access the base through the Area II gate only (or Range Road Gate for Area III access); the turnoff to the Area II gate is across from the racetrack on Las Vegas Blvd approximately 3 miles north of the Main Gate. At Creech, all construction contractors may access the base through the commercial gate located on the south east area of the base off of Highway 95.
• Each employee and their vehicle may be subjected to search before entry.
Each employee will be expected to comply with all directions provided by security personnel at the access gates. Failure to fully comply with directions provided by security personnel will result in access being denied. Before attempting access, ensure there are no weapons or other prohibited items in the vehicle as they will be confiscated if found.
Further, no practical jokes or wise remarks will be tolerated. Security of Nellis AFB is treated as serious business and full cooperation is required.
• Personnel cannot show up at the gate without prior notification for access and expect to gain access. Verbal access cannot be provided.
• Once access to the base has been granted, each contractor employee will be expected to proceed to the work site and not go to other facilities except in the performance of their work. Access to the flightline can only be allowed through additional authorization.
• Expect some delays in gaining access to the base especially between the hours of 6:30 AM to 8:00 AM due to heavy traffic volumes.
• Gate Hours: Gate hours are subject to change by the Government at any time due to military activities. Contractor shall be responsible for coordinating with the Contracting Officer for base access.
1.15.5 Unauthorized Activity: The contractor shall inform all personnel working under his/her jurisdiction (including subcontractor and supplier personnel) that access to areas outside of the immediate work area (excluding cafeterias and restrooms near the work site, direct haul and access routes, Contracting and Civil Engineering offices, and points of supply and storage) is prohibited.
Circulation of said personnel will be limited to official business only. Persons engaged in unauthorized reconnaissance of other contractor or government activity will be referred to the Contracting Officer for disposition. Infractions involving possible compromise of national security will be turned over to the FBI for disposition.
1.16 BASE REGULATIONS: Contractor employees and visitors are subject to the same restrictions as government personnel.
1.16.1 Smoking: Smoking is permitted in designated, outside smoking areas only.
No smoking will be allowed within any base facility.
1.16.2 Seatbelts: The use of seatbelts by all vehicle operators and passengers is mandatory on Nellis AFB and in the state of Nevada. On Nellis AFB, vehicle
SECTION 00 10 10 Page 17 operators and passengers caught not wearing their seatbelt will be issued a traffic citation and may lose their on-base driving privileges.
1.16.3 Firearms/Illegal Drugs: No firearms or illegal drugs are allowed to be brought onto Nellis AFB. By accepting a vehicle pass, each person gives their consent to a search of their vehicle while it is entering, on, or leaving Nellis
AFB
1.16.4 Speed Limit: The speed limit on base is 25 MPH; in base housing areas and flightline it is 15 MPH; and in parking lots it is 5 MPH.
1.16.5 Cell Phones: Use of non-hands-free cell phones while driving on an AF installation is prohibited.
1.16.6 Parking: Contractor vehicles and equipment will be parked in common parking areas or as otherwise approved in writing by the Contracting Officer.
1.17 SECURITY
1.17.1 Physical Security: The Contractor shall provide physical security for the materials and work under his control, and shall immediately notify the Contracting Officer when equipment, material or work area is damaged.
1.17.2 Security Personnel: If the Contractor elects to provide security personnel, Contractor security personnel will not carry weapons on base (including MACE and night sticks). It is the responsibility of the Contractor to notify security police, through the Contracting Officer, of security personnel who will be in the area.
1.17.3 Communications: In accordance with Air Force Instruction 33-211, all communications with DoD organizations are subject to communications security (COMSEC) review. Contractor personnel will be aware telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, civilian contractor personnel are advised any time they place a call to, or receive a call from, a USAF organization, they are subject to COMSEC procedures. The contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees.
1.18 SAFETY AND ACCIDENT PREVENTION
1.18.1 General: Compliance with the current U.S. Army Corps of Engineers "Safety and Health Requirements Manual", EM 385-1-1; Occupational Safety and Health Act (OSHA) Public Law 1910 and 1926; Air Force Occupational Safety and Health (AFOSH) standards, and current Nellis AFB safety regulations is mandatory. The prime Contractor shall be held responsible to insure that
SECTION 00 10 10 Page 18 his/her workforce and any subcontractor or supplier workforce comply to the above safety requirements.
1.18.2 Temporary Barriers: Contractor shall install and maintain temporary barriers around construction work areas to prevent unauthorized personnel from area.
1.18.3 Safety Briefings: Contractors operating on base will be responsible to brief and ensure their employees, subcontractors, and suppliers comply with all traffic rules and regulations as well as entry procedures.
1.18.4 Nellis AFB Security Police: All instructions given by Security Police personnel will be complied with immediately. All on-base traffic rules are contained in Air Force Instruction (AFI) 31-204, Motor Vehicle Traffic Supervision.
1.18.5 Equipment and Tools: Equipment to be used on the project shall be safe and in good operating condition. The Contracting Officer reserves the right to inspect any on-base equipment and reject such equipment if he considers it unsafe, in poor operating condition, or inappropriate for work.
1.18.6 Explosive Operated Handtools: The Contractor shall comply with OSHA (Occupational Safety and Health Act) Standard 1910.215(c) when utilizing explosive operated handtools. Storage of explosive cartridges on the installation will be in metal containers and limited to one day’s supply. The contractor will provide adequate controls to prevent loss/theft of cartridges used and stored on the installation.
1.18.7 Electromagnetic Emission Devices: Electromagnetic emission devices (including but not limited to Radio/Radar Transmitters; Navigational Aids;
Instrumentations; Signaling, Intrusion Detecting and Identification Devices;
Mobile and Fixed Business Radio Communication Equipment; and MARS, CBs and Amateur Radio Stations) will be required to comply with the AFI 33- 118, dated Jan 94. This regulation is available for inspection at the 99th Communications Squadron/SCX, Bldg 589, Nellis AFB NV.
1.18.8 Use of Radioactive Devices on Government Property: Under no circumstances will an unlicensed radioactive device be used on Nellis Air Force Base. Prior to using a radioactive device (i.e., soil or asphalt density meter) on government property, the contractor shall submit an application to the Contracting Officer for approval by the Base Radiation Protection Officer (99th Medical Group/SGPB). In accordance with Nellis AFB Instruction 48- 101, the application shall be submitted thirty (30) to sixty (60) calendar days prior to the anticipated use and will consist of the following:
• A copy of the appropriate NRC license or State Permit to operate/own the radioactive device.
• A copy of the operator's qualifications and/or radiation safety training.
• Radiation dosimetry results for the operator for the past calendar year.
SECTION 00 10 10 Page 19
• A statement of the expected start date and the length of the contract (task order).
• A statement of expected storage and security requirements or other peculiar needs of the contractor.
• Copies of the last two leak tests.
1.19 FIRE PREVENTION AND PROTECTION
1.19.1 Nellis AFB Fire Regulations: The Contractor shall comply strictly with the
Base fire regulations and become thoroughly familiar with and brief employees and subcontractors on the fire safety requirements applicable to this contract.
1.19.2 Welding Permit: No welding, cutting or open flame will be permitted without obtaining a Welding/Cutting/Burning Permit issued by the Base Fire Department, Bldg 277. This permit shall be requested by the Contractor a minimum of one workday prior to required need. A permit must be obtained each time any welding, cutting, or open flame is required.
1.19.3 Clean-Up: The Contractor shall at all times maintain good housekeeping practices to reduce the risk of fire damage. All scrap materials, rubbish, and trash shall be removed daily from in and about the site and shall not be permitted to be scattered on adjacent property.
1.19.4 Fire Extinguishers: The Contractor shall provide fire extinguishers in accordance with the recommendations of the base fire regulations. Proper type fire extinguisher shall be available at each location where cutting and welding is being performed. Where electric or gas welding or cutting is done, interposed shields of incombustible material shall be used to protect against fire damage due to sparks and hot metal.
1.20 ENVIRONMENT PROTECTION: All work and Contractor operations shall comply with the requirements imposed by all applicable Federal, State, local, and base regulations and permits concerning environmental protection. The contractor shall submit a copy of a grading and dust permit obtained from Clark County, Nevada, for landscaping, grading, and trenching. Contractor shall pay for and obtain all Federal, State, local, and Nellis AFB permits required for the successful execution of the project.
Project schedule shall reflect time required to acquire permits prior to work commencing.
1.20.1 Spills: Should any hazardous substance or oil spills occur on this project, in addition to containing and removing such spill, the Contractor shall:
• During normal working hours, immediately report all spills in quantities of five
(5) gallons or more to the Asset Management Office at 652-4123 or 652-6106.
• After 4:30 p.m. or on weekends, immediately contact the Nellis Command Post at 652-2446.
SECTION 00 10 10 Page 20
• Forward a written, completed spill report to the Contracting Officer within three
(3) working days after the occurrence.
1.20.2 Waste Materials: All waste…