Sheet1
| FA485522B0001, B190, Repair Doors, Sprinklers, Tile Briefing Rm COR Nomination | |||
| Item | Date | Question | Gov't Response |
| 1 | 20-Dec-21 | Per the General Requirement section 1.4.1 Designs, is the contractor required to provide any design drawings in addition to the 35% provided in the bid documents? | No, the contractor is not required to build drawings. We just ask for as-builts, and the contractor may use the Govt. provided drawings to red-line and/or guide to submit as-built. |
| 2 | 20-Dec-21 | Per the Description of the Project section 2.2.5 New Construction, is there a specific prefabricated wall or similar type of partition to be used to match existing? | Government is working on this and will provide an update at later date |
| 3 | 20-Dec-21 | Per the Description of the Project section 2.3.3 Fire Suppression, please confirm there are a total of (6) existing fire sprinkler heads in Room S128 that will be required to be lowered to existing ceiling height. | Correct |
| 4 | 20-Dec-21 | Per the Description of the Project section 2.3.3 Fire Detection, what is the type of existing fire alarm panel for B190 so the new smoke detectors and fire doors can be tied in? | The fire alarm panel in B190 is Moncaco M-2 Conventional |
| 5 | 20-Dec-21 | Is there a specific contractor who is responsible for monitoring the existing fire alarm system for B190? | We do not have specific contractor that monitors the existing fire alarm system it is maintained by the Civil Engineering unit |
| 6 | 20-Dec-21 | Is there a specific contractor who is responsible for handling the Blue Light devices and monitoring for B190? | We do not know of a specific contractor for Blue light devices |
| 7 | 20-Dec-21 | What type of new acoustical ceiling tiles are being requested in order to match existing? | Ceiling tiles are to meet the 09 51 00 Specifications |
| 8 | 20-Dec-21 | What type of new carpet tiles are being requested in order to match existing? | Rolled carpet to match existing carpet |
| 9 | 20-Dec-21 | Is there an existing asbestos survey for building 190 available or does Cannon know if any hazardous material is present within the building? | Yes, the environmental form is attached. |
| 10 | 3-Jan-22 | Please confirm that drywall can not be used in lieu of prefabricated panels. Is the customer open to building soundproof walls instead of using the panels? | Government is working on this and will provide at later date |
| 11 | 3-Jan-22 | Please provide VCT specs | they're provided in section 09 65 00 resilient flooring |
| 12 | 3-Jan-22 | During the site visit, pictures of the sprinkler heads were discussed. Please provide pictures of sprinkler heads. | Government is working on this and will provide at later date |
| 13 | 3-Jan-22 | What fire alarm system is being used in B190? | The fire alarm panel in B190 is Moncaco M-2 Conventional |
| 14 | 3-Jan-22 | Can the site superintendent dual hat to cover the SSO and QCM for this project? | yes |
| 15 | 3-Jan-22 | Has there been or is there any testing results available for lead paint or asbestos? | Yes, the environmental form is attached. |
| 16 | 10-Jan-22 | We are unable to find manufacturer for pre-manufactured partitions. There is no specification on this, is there any information available? | Government is working on this and will provide at later date |