22_Microwave_Q&A_After_Site_Visit.pdf

PDF 87 KB Posted

Attached to
Microwave Systems Support Services Federal contract opportunity
Solicitation number
FA4855-19-R-A016
Issued by
Department of the Air Force Special Operations Command

View the file

Other files for this federal contract opportunity

Other files attached to Microwave Systems Support Services, newest first.
File Type Posted
Attachment_3_MShot_Topology.pdf PDF
Microwave_Q&A_After_Site_Visit.pdf PDF
Solicitation_Amendment_FA485519RA0160001_SF_30.pdf PDF
Microwave_Q&A.docx DOCX document
Attachment_2_WD.pdf PDF
Solicitation_-_FA485519RA016.pdf PDF
PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS -- Solicitation Number FA4855-19-R-A016

ADDITIONAL QUESTIONS AND ANSWERS:

1. QUESTION: We need to have a safety training for our Techs to work on base? Correct? How long is this training?

ANSWER: If you are referring to the RSO training, it will be 4 hours if it is an initial training.

2. QUESTION: Do we need to schedule the RSO training? Does every technician need the RSO training?

ANSWER: The customer should schedule the RSO training while coordinating it with the contractor so a special trip is not required. No, not every technician needs the RSO training.

However, when anyone performs work out on MAFR at least one individual present must be a trained RSO.

SITE VISIT QUESTIONS AND ANSWERS:

1. QUESTION: Will any of the sites require special access to work on the structure the microwave dish is mounted on? i.e crane or boom truck.

ANSWER: Yes, some locations will require a boom truck to access the microwave dish.

2. QUESTIONS: Is there a current stock of OEM parts for the various systems for preventive maintenance and repair? i.e. IDU, ODU, or dish components.

ANSWER: No.

3. QUESTION: Will any of the systems needing service be in a RED (unencrypted) facility requiring special clearance, or is all access on the Black (encrypted) side?

ANSWER: No, however there are restricted areas that will require an escort.

4. QUESTION: Is there going to be an available map to identify which hops are connected together?

ANSWER: Yes.

5. QUESTION: Being a twelve-month project, is the anticipated schedule strictly monthly preventative maintenance plus outage restoral or will upgrades and new installs be included?

ANSWER: Plus upgrades/installs.

6. QUESTION: Will multiple escorts be provided when simultaneously working both ends of the hop for path alignment?

ANSWER: Yes.

7. QUESTION: Are the original installation documents and current configuration data available for comparison when performing maintenance?

ANSWER: For the original installations no and we only have the current configuration data for the Nokia system.

8. QUESTION: Are the current components of the systems under any type of manufacturer warranty and is there technical support available from the manufacturer?

ANSWER: No, but a process currently exists to get refurbished 600’s.

9. QUESTION: Are the facilities in which the equipment is housed permanently manned?

ANSWER: No.

10. QUESTION: What is the current turn around for parts for outage replacement?

ANSWER: Current turn around ranges from 1-2 weeks.

11. QUESTION: Will delays in delivery justify the additional days needed during the PM and repair visits?

ANSWER: Yes.

12. QUESTION: Will the antenna at the guard shack be repaired before new contract starts?

ANSWER: Yes.

Attachment 3: Map of MShot Topology

Amendment 1 – QUESTION AND ANSWER:

1. Question: Is there going to be a site visit held?

Answer: Yes, there will be a site visit as follows:

A site visit will be held on 12 September 2019 at 8:00 a.m. MDT The meeting location will be the visitor center at Cannon AFB, NM.

Contractors shall e-mail Ms. Patricia Thatcher at patricia.thatcher@us.af.mil no later than 11:00 a.m. MDT on 9 September 2019 providing the following information to attend the site visit:

- Solicitation number in the Subject Line

- Company Name

- Number of people attending (no more than 2 per company)

- Each person’s name and phone number

- Questions for the site visit (if any) If you have access to the installation you are still required to send an e-mail to

Ms. Thatcher of your attendance to the site visit with the above information and no more than 2 in attendance.

Questions can be directed to Ms. Thatcher via e-mail.

mailto:patricia.thatcher@us.af.mil

QUESTIONS AND ANSWERS -- Solicitation Number FA4855-19-R-A016
ADDITIONAL QUESTIONS AND ANSWERS:
1. QUESTION: We need to have a safety training for our Techs to work on base? Correct? How long is this training?
ANSWER: If you are referring to the RSO training, it will be 4 hours if it is an initial training.
2. QUESTION: Do we need to schedule the RSO training? Does every technician need the RSO training?
ANSWER: The customer should schedule the RSO training while coordinating it with the contractor so a special trip is not required. No, not every technician needs the RSO training. However, when anyone performs work out on MAFR at least one individ...
SITE VISIT QUESTIONS AND ANSWERS:
Amendment 1 – QUESTION AND ANSWER: