Attachment_3.pdf

PDF 2 MB Posted

Attached to
Replace Primary and Secondary Electrical Distribution Phase 1
Solicitation number
FA4855-16-R-0005
Issued by

About this file

Drawings

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE EXISTING

UNDERGROUND 1/0 FEEDER

WITH 4/0 IN 2-NEW 5" CONDUIT

DUCT BANKS FROM SW 1561TO

SECTIONALIZER 1514 NEW

CONNECTIONS TO T145 & NEW

CONTINUING UNDERGROUND

CKT

PROVIDE TEMPORARY

PORTABLE POWER TO

MAINTAIN ECP IN

OPERATIONS

MATCHLINE AA

SAW-CUT AND REPAIR

ASPHALT AS

REQUIRED FOR NEW

FEEDERS

SAW-CUT AND REPAIR

ASPHALT AS

REQUIRED FOR NEW

FEEDERS

COMPACT AND

HYDROSEED ALL NEW

TRENCHES

FA4855-16-R-0005 Attachment 3- 27 Jan 2016

1127485948C Pencil lbandaned_p_ole

Exterior liqht

TP2208

.·.•:·•�<i�<I

<f!i;>1

I

··:1 ··.I

1---�

_J r

I s

"----�------------.._j

SAW CUT A

ND REPAIR

ROADWAY AS REQUIR

ED

SAW CUT AND REPAIR

ROADWAY AS REQUIRED

COORDINATE OUTAGE

WITH CAFB

SW-1561

N.I.C.

N.I.C.

REPLACE EXISTING

UNDERGROUND 1/0 FEEDER

WITH 4/0 IN 2-NEW 5" CONDUIT

DUCT BANKS

N.I.C.

SEC-1514

MATCHLINE AA

AIR

COMMANDO W

AY

COMPACT AND

HYDROSEED ALL NEW

TRENCHES

FA4855-16-R-0005 Attachment 3- 27 Jan 2016

1470016694C Rectangle

Revised CZQZ 13-1134 Attachment 1
Revised CZQZ 13-1134 Attachment 2

File details come from the government source that posted it. Updated .