Attachment_4_-_Pavement_Survey_Information.pdf
PDF 913 KB Posted
- Attached to
- Repair Taxiway Alpha Federal contract opportunity
- Solicitation number
- FA4855-16-B-0015
About this file
Attachment 4 Pavement Survey Information for Taxiway Alpha
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4855-16-B-0015_Abstract_SF_1409.pdf | ||
| Attachment_6_Wage.pdf | ||
| Attachment_6_Wage.pdf | ||
| FA4855-16-B-0015_Questions.pdf | ||
| Soilicitation_Alpha.pdf | ||
| Attachment_2_Specs_-_CZQZ15-0083_Repair_Taxiway_Alpha.pdf | ||
| Attachment_1_SOW_-_CZQZ15-0083_Repair_Taxiway_Alpha.pdf | ||
| Solicitation_Taxiway_Alpha.doc | DOC document | |
| Attachment_3_Plan_Set_-_CZQZ15-0083_Repair_Taxiway_Alpha.pdf | ||
| Attachment_5_SOMS_-_CZQZ15-0083_-_Repair_Taxiway_Alpha.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27TH SPECIAL OPERATIONS WING (AFSOC)
27TH SPECIAL OPERATIONS CIVIL ENGINEER SQUADRON
CANNON AIR FORCE BASE, NEW MEXICO
CONSTRUCTION SERVICES FOR REPAIR TAXIWAY ALPHA
PROJECT NUMBER: CZQZ15-0083
ATTACHMENT 1: PAVEMENT SURVEY INFORMATION
Page 1 of 9 Total Pages
Table of Contents T04A1 Section Alpha (A)
T04A1 Section Bravo (B)
T04A1 Section Charlie (C)
T04A2
Page 2 of 9 Total Pages
Taxiway Alpha Section Alpha (A) T04A1
Section ID Crack Length (LF) Spall Area (SF) Additional Information A1 0 0.5 spall repair required A2 0 0.5 spall repair required A3 0 2.5 multiple spall repairs needed A4 0 20 existing spall in bad shape, needs to be repair A5 0 0 no work required A6 0 0 no work required A7 0 1 spall repair required A8 0 1 spall repair required A9 0 0 no work required
A10 0 0 no work required A11 0 0 no work required A12 0 0 no work required A13 0 2 existing spall in bad shape, needs to be repair A14 0 0 no work required
A15 25 50 Existing crack are wide will require spall repair in multiple areas within that crack
A16 0 0 no work required A17 0 7 spall repair required in multiple locations A18 0 3.5 spall repair required in multiple locations A19 0 2.5 spall repair required in multiple locations
A20 25 15 Crack seal needed and spall repair required in multiple locations
A21 25 40 Existing crack are wide will require spall repair in multiple areas within that crack
A22 25 42 Existing crack are wide will require spall repair in multiple areas within that crack. Multiple slab repairs need as well.
A23 25 40 Existing crack are wide will require spall repair in multiple areas within that crack. Multiple slab repairs need as well.
A24 25 30 Existing crack are wide will require spall repair in multiple areas within that crack. Multiple slab repairs need as well.
A25 25 14 Existing crack are wide will require spall repair in multiple areas within that crack
A26 25 10 Existing crack are wide will require spall repair in multiple areas within that crack. Multiple slab repairs need as well.
A27 0 0 no work required A28 0 2 multiple spall repairs needed A29 0 1 multiple spall repairs needed A30 0 4 multiple spall repairs needed A31 0 0 no work required A32 20 0 crack seal needed
Page 3 of 9 Total Pages
Taxiway Alpha Section Alpha (A) T04A1
A33 25 21 Existing crack are wide will require spall repair in multiple areas within that crack. Multiple slab repairs need as well.
A34 0 0 no work required A35 0 0 no work required A36 0 0 no work required A37 0 0 no work required A38 0 0.5 spall repair needed A39 0 3 spall repair needed A40 0 0 no work required A41 0 0 no work required A42 0 0 no work required
A43 40 10 Existing crack are wide will require spall repair in multiple areas within that crack. Multiple slab repairs need as well.
A44 0 3.5 multiple spall repairs needed
A45 25 30 Existing crack are wide will require spall repair in multiple areas within that crack.
A46 25 40 Existing crack are wide will require spall repair in multiple areas within that crack.
A47 0 50 existing spalls in bad shape, needs to be repair Total 335 446.5
Page 4 of 9 Total Pages
Taxiway Alpha Section Bravo (B) T04A1
B1 0 5.5 multiple spall repairs needed B2 25 60 both crack repair and spall repair needed B3 25 0 crack repair needed B4 0 2.5 multiple spall repairs needed B5 0 0 no work required B6 0 0.5 spall repair needed B7 15 55 both crack repair and spall repair needed B8 0 1 multiple spall repairs needed B9 0 0 no work required
B10 0 1.5 spall repair needed B11 36 0 crack repair needed B12 12 0 crack repair needed B13 0 0.5 spall repair needed
B14 25 60 Existing crack is wide will require spall repair in multiple areas within that crack.
B15 25 60 Existing crack is wide will require spall repair in multiple areas within that crack.
B16 0 0 no work required B17 0 0.5 spall repair needed B18 25 0 crack repair needed B19 0 0.5 spall repair needed B20 0 0 no work required B21 B22 0 0 no work required
B23 25 42 Existing crack are wide will require spall repair in multiple areas within that crack. Multiple slab repairs need as well.
B24 25 0 crack repair needed B25 0 0 no work required B26 25 0 crack repair needed
B27 25 38 Existing crack is wide will require spall repair in multiple areas within that crack.
B28 25 0.5 both crack repair and spall repair needed B29 25 0 crack repair needed B30 0 1 multiple spall repairs needed
B31 25 50 Existing crack are wide will require spall repair in multiple areas within that crack. Multiple slab repairs need as well.
B32 25 35 Existing crack is wide will require spall repair in multiple areas within that crack.
B33 0 0 no work required B34 0 0 no work required B35 0 0 no work required B36 0 0 no work required B37 0 1 multiple spall repairs needed B38 5 0 crack repair needed
Page 5 of 9 Total Pages
Taxiway Alpha Section Bravo (B) T04A1
B39 25 15 Existing crack is wide will require spall repair in multiple areas within that crack.
B40 n/a n/a Full depth repair 15" PCC 6" Base course
B41 25 25 Existing crack is wide will require spall repair in multiple areas within that crack.
B42 25 23 Existing crack is wide will require spall repair in multiple areas within that crack.
B43 5 4 both crack repair and spall repair needed B44 0 0 no work required B45 0 0 no work required B46 0 0 no work required B47 0 10 multiple spall repairs needed
Total 473 492
Page 6 of 9 Total Pages
Taxiway Alpha Section Charlie (C) T04A1
C1 0 7 Multiple spall repairs needed. Corner connecting taxiway to apron is also badly damage and should be replaced. An extra 5 SF is accounted for this area
C2 0 2 Spall repair needed C3 0 0 No work required C4 0 3 replace existing spall C5 0 17 Spall repair needed C6 25 4 both crack repair and spall repair needed C7 25 2.5 both crack repair and spall repair needed C8 25 2.5 both crack repair and spall repair needed C9 25 0.5 both crack repair and spall repair needed
C10 0 0 No work required C11 0 1.5 multiple spall repairs needed C12 0 28 replace existing spall C13 0 0.5 Spall repair needed C14 0 0 good C15 0 1.5 multiple spall repairs needed C16 0 0 good C17 0 0.5 Spall repair needed C18 0 2 Spall repair needed C19 0 2 Spall repair needed C20 0 0.5 Spall repair needed C21 0 0.5 Spall repair needed C22 0 1 Spall repair needed C23 0 0 No work required
C24 20 13 Existing crack is wide will require spall repair in multiple areas within that crack.
C25 25 11 Existing crack is wide will require spall repair in multiple areas within that crack.
C26 25 12 Existing crack is wide will require spall repair in multiple areas within that crack.
C27 25 38 Existing crack is wide will require spall repair in multiple areas within that crack.
C28 25 0.5 both crack repair and spall repair needed C29 0 0 No work required C30 0 0 No work required C31 0 0 No work required C32 7 0 crack repair required C33 0 2 Spall repair needed
C34 25 50 Existing crack is wide will require spall repair in multiple areas within that crack.
C35 25 0 crack repair required C36 30 4 both crack repair and spall repair needed C37 40 0 crack repair required C38 0 8 Spall repair needed
Page 7 of 9 Total Pages
Taxiway Alpha Section Charlie (C) T04A1
C39 0 0.5 Spall repair needed C40 0 0.5 Spall repair needed C41 0 0 No work required C42 0 0.5 Spall repair needed C43 0 0.5 Spall repair needed C44 0 24 multiple spall repairs needed C45 0 13 Spall repair needed C46 0 13 Spall repair needed
C47 25 10 Existing crack is wide will require spall repair in multiple areas within that crack.
Total 372 277
Page 8 of 9 Total Pages
Taxiway Alpha T04A2
Full-depth repair entire section Full depth repair 15" PCC 6" Base course
Page 9 of 9 Total Pages
| T04A1 Section A |
| T04A1 Section B |
| T04A1 Section C |
| T04A2 |
File details come from the government source that posted it. Updated .