SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 16 PAGES

Cannon AFB TO 3004 Bldg 785 HVAC

01 33 00 SD-01 Preconstruction Submittals

1.10 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 G A [_Accident Prevention Plan (APP)

1.8 G A [_Activity Hazard Analysis (AHA)

1.7.1 G A [_Crane Critical Lift Plan

1.6.1.4 G A [_Crane Operators

SD-06 Test Reports 1.12Notifications and Reports 1.12.2Accident Reports 1.12.3Crane Reports 1.16Gas Protection

SD-07 Certificates 1.9Confined Space Entry Permit 1.9Hot work permit 1.14License Certificates

1.4 G A [_Contractor Safety Self-Evaluation

Checklist 1.12.5Third Party Certification of

Barge-Mounted Mobile Cranes 1.12.4Certificate of Compliance 3.7.3Machinery & Mechanized

Equipment Certification Form 01 35 40.00 20 SD-01 Preconstruction Submittals

1.8 GEnvironmental Protection Plan

1.9.1Instructor Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 16 PAGES

01 35 40.00 20 SD-03 Product Data 1.7.2Life Cycle Assessments 2.1.2Packaging

SD-06 Test Reports 3.2Field Quality Control Reports

SD-07 Certificates 1.6Environmental Regulatory

Requirements SD-08 Manufacturer’s Instructions

1.7.1Material Safety Data Sheets SD-11 Closeout Submittals

1.9.3Training Program 3.1Protection of Natural Resources

01 57 23 SD-01 Preconstruction Submittals 1.3.2Storm Water Pollution Prevention

Plan 1.3.2Storm Water Notice of Intent

SD-06 Test Reports 1.3.2Storm Water Inspection Reports for General Permit 1.3Erosion and Sediment Controls

SD-07 Certificates 2.1.3Mill Certificate or Affidavit

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 16 PAGES

01 74 19 1.7Records 03 30 00 SD-03 Product Data

2.3.7Materials for curing concrete Joint sealants

2.3.9Joint filler Plastic Forms Carton Forms Recycled Aggregate Materials

2.3.1Cement 2.3.1.2Portland Cement 2.2.2Ready-Mix Concrete 2.3.6Vapor retarder and Vapor barrier 2.3.6Vapor retarder and Vapor barrier

Bonding Materials Floor Finish Materials

2.2.3Concrete Curing Materials 2.4Reinforcement

Reinforcement Materials Liquid Chemical Floor Hardener

SD-05 Design Data

2.2.1 Gmix design

SD-06 Test Reports

1.6.3.1 GConcrete mix design

1.6.3.2Fly ash 1.6.3.2Pozzolan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 16 PAGES

03 30 00 Ground granulated blast-furnace slag

1.6.3.3Aggregates 3.10.2.3Compressive strength tests 3.10.2.4Air Content

Slump Air Entrainment

05 05 23 SD-03 Product Data

1.5 GWelding Procedure Qualifications

1.5.5Welder, Welding Operator, and

Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures

SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination

SD-07 Certificates Certified Welding Procedure Specifications (WPS)

Certified Procedure Qualification Records (PQR)

Certified Welder Performance Qualifications (WPQ)

05 12 00 SD-02 Shop Drawings

1.4.2.1 GErection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 16 PAGES

05 12 00 1.4.1 GFabrication drawings SD-03 Product Data

2.4Shop primer 2.3.1Welding electrodes and rods

Load indicator washers 2.3.2Non-Shrink Grout

SD-06 Test Reports 2.2Bolts, nuts, and washers

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 1.4.2.2Welding procedures and qualifications 05 40 00 SD-03 Product Data joists SD-07 Certificates

1.4Load-bearing cold-formed metal framing

3.1.1Welds 05 50 13 SD-02 Shop Drawings

2.3 GFloor gratings and roof walkways

SD-03 Product Data Floor gratings

05 51 33 SD-02 Shop Drawings 2.3Ladders 2.3.1Ship's ladder

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 16 PAGES

05 51 33 SD-03 Product Data 2.3Ladders 2.3.1Ship's ladder

07 21 16 SD-03 Product Data 2.1Blanket insulation

Certification SD-08 Manufacturer’s Instructions

3.2.1Insulation 07 84 00 SD-07 Certificates

2.1Firestopping Materials 3.3Inspection

09 22 00 SD-02 Shop Drawings 2.1Metal support systems

09 29 00 SD-03 Product Data 2.1.4Accessories

Certification SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions

2.1Material Safety Data Sheets SD-10 Operation and Maintenance Data

2.1Manufacturer maintenance instructions

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 16 PAGES

09 51 00 SD-03 Product Data Acoustical Ceiling Systems Certification

SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

SD-06 Test Reports Fire Resistive Ceilings

1.2.1Ceiling Attenuation Class and Test

SD-07 Certificates 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

09 90 00 SD-03 Product Data Certification

SD-04 Samples Color

SD-07 Certificates 1.3Applicator's qualifications

SD-08 Manufacturer’s Instructions 3.3.1Application instructions 3.7.2Mixing 1.6.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 16 PAGES

09 90 00 Coatings:

23 00 00 SD-03 Product Data

Duct Connectors 2.5.2Duct Access Doors

Fire Dampers 2.5.3Manual Balancing Dampers

Acoustical Duct Liner 2.5.4.1Diffusers, Registers and Grilles

Centrifugal Fans SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation Instructions

3.7.2Operation and Maintenance Training

SD-10 Operation and Maintenance Data

3.7.1Operation and Maintenance Manuals

2.5.3Manual Balancing Dampers Centrifugal Fans

23 05 15 SD-01 Preconstruction Submittals Material, Equipment, and Fixture Lists

SD-02 Shop Drawings 1.2Record Drawings 1.2Connection Diagrams

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 16 PAGES

23 05 15 1.2Coordination Drawings Fabrication Drawings

3.1Installation Drawings SD-03 Product Data

2.1Pipe and Fittings 2.2Piping Specialties 2.3Valves 2.4Miscellaneous Materials 2.5Supporting Elements

Equipment Foundation Data SD-10 Operation and Maintenance Data

3.8Operation and Maintenance Manuals

23 05 93 SD-01 Preconstruction Submittals 1.5.3.1TAB Firm 1.2TAB team field leader

SD-02 Shop Drawings 1.3.3TAB Schematic Drawings and

Report Forms SD-03 Product Data

1.5.3.4 GTAB Related HVAC Submittals

1.5.2 GTAB Procedures

1.5.2Calibration 1.3.3Systems Readiness Check

TAB Execution

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 16 PAGES

23 05 93 TAB Verification SD-06 Test Reports

3.5TAB Procedures Summary 1.3.3Design review report 1.6.1.1Design review report 3.5Design review report 1.5.5.1TAB report 3.5TAB report

SD-07 Certificates 1.5.3.1TAB Firm 1.3.3Design review report 1.6.1.1Design review report 3.5Design review report

23 07 00 SD-03 Product Data 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems

23 08 00.00 10 SD-02 Shop Drawings

1.5.2.2 GCommissioning Plan

SD-03 Product Data 3.2.1Pre-Functional Performance Test

Checklists

3.2.2 GFunctional Performance Tests

SD-06 Test Reports

3.3 GCommissioning Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 16 PAGES

23 08 00.00 10 1.5.1Commissioning Firm 1.5.2Commissioning Specialist

23 09 23.13 20 SD-02 Shop Drawings

1.4.1.2 GList of I/O Points

1.4.1.3 GControl System Components List

1.4.1.4 GControl system schematics

1.4.1.5 GHVAC Equipment Electrical

Ladder diagrams 1.4.1.6Component wiring diagrams 1.4.1.7Terminal strip diagrams 1.4.1.8BACnet communication architecture schematic SD-03 Product Data

2.1.1 GDirect Digital Controllers

2.1.1.13 GBACnet Gateways

GBACnet Protocol Analyzer 2.1.2DDC Software

BACnet Operator Workstation DDC Software

2.2 GSensors and Input Hardware

2.3Output Hardware

SD-06 Test Reports

3.4.10 GPerformance Verification Testing

Report SD-07 Certificates

1.6.6 GContractor's Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 16 PAGES

23 09 23.13 20 SD-10 Operation and Maintenance Data

1.4BACnet Direct Digital Control Systems

3.3 GControls System Operators

Manuals

SD-11 Closeout Submittals

3.5.1 GTraining documentation

23 36 00.00 40 SD-02 Shop Drawings 2.1Shutoff Single-Duct Air Terminal

Units 3.3Record Drawings

SD-03 Product Data 2.1Shutoff Single-Duct Air Terminal

Units SD-10 Operation and Maintenance Data

3.3Operation and Maintenance Manuals

23 52 00 SD-02 Shop Drawings 1.4Detail Drawings

SD-03 Product Data 2.1.1Materials and Equipment 1.4Spare Parts 2.11Water Treatment System 2.11Boiler Water Treatment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 16 PAGES

23 52 00 3.4Heating System Tests 3.7Fuel System Tests 2.6Unit Heaters

Welding 3.4Qualifications 3.6Field Instructions

Tests SD-06 Test Reports

3.4Heating System Tests 3.7Fuel System Tests 3.4.1Water Treatment Testing

SD-07 Certificates Bolts

2.7.1Continuous Emissions Monitoring 2.1.3Energy Star

SD-10 Operation and Maintenance Data

3.6Operation and Maintenance Instructions

2.11Water Treatment System 23 64 10 SD-03 Product Data

3.1 GWater Chiller

3.1 GWater Chiller

3.4.1 GWater Chiller

3.4.1 GWater Chiller

3.4.2 GWater Chiller

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 16 PAGES

23 64 10 3.4.2 GWater Chiller 3.6Posted Instructions 1.5.1Verification of Dimensions 1.7Manufacturer's Multi-Year

Compressor Warranty Factory Tests

3.5System Performance Tests 3.6Demonstrations

SD-06 Test Reports 3.4Field Acceptance Testing 3.1Water Chiller 3.4.1Water Chiller 3.4.2Water Chiller

Factory Tests 3.5System Performance Tests

SD-07 Certificates 3.1.2Refrigeration System

SD-08 Manufacturer’s Instructions 3.1Water Chiller 3.4.1Water Chiller 3.4.2Water Chiller

SD-10 Operation and Maintenance Data

3.6 GOperation and Maintenance

Manuals

23 73 13.00 40 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 16 PAGES

23 73 13.00 40 3.1 GInstallation Drawings SD-03 Product Data

2.1 GEquipment and Performance

Data

1.3.2 GSample Warranty

SD-07 Certificates

3.1 GListing of Product Installations

1.3.1 GCertificates of Conformance

2.3Unit Cabinet 2.4Fan 2.5Drain Pans 2.6Insulation 2.7Plenums 2.1Spare Parts

1.5 GWarranty

SD-10 Operation and Maintenance Data

3.5 GOperation and Maintenance

Manuals

26 20 00 SD-02 Shop Drawings

2.10 GPanelboards

2.13 GTransformers

SD-03 Product Data

2.9 GReceptacles

2.10.3 GCircuit breakers

2.7 GSwitches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 16 PAGES

26 20 00 2.15 GMotor controllers GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.4Ground-fault receptacle test

SD-09 Manufacturer’s Field Reports

2.23.1Transformer factory tests SD-10 Operation and Maintenance Data

1.5.1 GElectrical Systems

26 51 00 SD-03 Product Data

2.1 GFluorescent lighting fixtures

1.5.1 GFluorescent electronic ballasts

2.1.2 GFluorescent lamps

2.6 GEmergency lighting equipment

Environmental Data 1.5.3.3Energy Efficiency

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR