SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 16 PAGES
Cannon AFB TO 3004 Bldg 785 HVAC
01 33 00 SD-01 Preconstruction Submittals
1.10 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 G A [_Accident Prevention Plan (APP)
1.8 G A [_Activity Hazard Analysis (AHA)
1.7.1 G A [_Crane Critical Lift Plan
1.6.1.4 G A [_Crane Operators
SD-06 Test Reports 1.12Notifications and Reports 1.12.2Accident Reports 1.12.3Crane Reports 1.16Gas Protection
SD-07 Certificates 1.9Confined Space Entry Permit 1.9Hot work permit 1.14License Certificates
1.4 G A [_Contractor Safety Self-Evaluation
Checklist 1.12.5Third Party Certification of
Barge-Mounted Mobile Cranes 1.12.4Certificate of Compliance 3.7.3Machinery & Mechanized
Equipment Certification Form 01 35 40.00 20 SD-01 Preconstruction Submittals
1.8 GEnvironmental Protection Plan
1.9.1Instructor Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 16 PAGES
01 35 40.00 20 SD-03 Product Data 1.7.2Life Cycle Assessments 2.1.2Packaging
SD-06 Test Reports 3.2Field Quality Control Reports
SD-07 Certificates 1.6Environmental Regulatory
Requirements SD-08 Manufacturer’s Instructions
1.7.1Material Safety Data Sheets SD-11 Closeout Submittals
1.9.3Training Program 3.1Protection of Natural Resources
01 57 23 SD-01 Preconstruction Submittals 1.3.2Storm Water Pollution Prevention
Plan 1.3.2Storm Water Notice of Intent
SD-06 Test Reports 1.3.2Storm Water Inspection Reports for General Permit 1.3Erosion and Sediment Controls
SD-07 Certificates 2.1.3Mill Certificate or Affidavit
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 16 PAGES
01 74 19 1.7Records 03 30 00 SD-03 Product Data
2.3.7Materials for curing concrete Joint sealants
2.3.9Joint filler Plastic Forms Carton Forms Recycled Aggregate Materials
2.3.1Cement 2.3.1.2Portland Cement 2.2.2Ready-Mix Concrete 2.3.6Vapor retarder and Vapor barrier 2.3.6Vapor retarder and Vapor barrier
Bonding Materials Floor Finish Materials
2.2.3Concrete Curing Materials 2.4Reinforcement
Reinforcement Materials Liquid Chemical Floor Hardener
SD-05 Design Data
2.2.1 Gmix design
SD-06 Test Reports
1.6.3.1 GConcrete mix design
1.6.3.2Fly ash 1.6.3.2Pozzolan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 16 PAGES
03 30 00 Ground granulated blast-furnace slag
1.6.3.3Aggregates 3.10.2.3Compressive strength tests 3.10.2.4Air Content
Slump Air Entrainment
05 05 23 SD-03 Product Data
1.5 GWelding Procedure Qualifications
1.5.5Welder, Welding Operator, and
Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures
SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination
SD-07 Certificates Certified Welding Procedure Specifications (WPS)
Certified Procedure Qualification Records (PQR)
Certified Welder Performance Qualifications (WPQ)
05 12 00 SD-02 Shop Drawings
1.4.2.1 GErection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 16 PAGES
05 12 00 1.4.1 GFabrication drawings SD-03 Product Data
2.4Shop primer 2.3.1Welding electrodes and rods
Load indicator washers 2.3.2Non-Shrink Grout
SD-06 Test Reports 2.2Bolts, nuts, and washers
SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 1.4.2.2Welding procedures and qualifications 05 40 00 SD-03 Product Data joists SD-07 Certificates
1.4Load-bearing cold-formed metal framing
3.1.1Welds 05 50 13 SD-02 Shop Drawings
2.3 GFloor gratings and roof walkways
SD-03 Product Data Floor gratings
05 51 33 SD-02 Shop Drawings 2.3Ladders 2.3.1Ship's ladder
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 16 PAGES
05 51 33 SD-03 Product Data 2.3Ladders 2.3.1Ship's ladder
07 21 16 SD-03 Product Data 2.1Blanket insulation
Certification SD-08 Manufacturer’s Instructions
3.2.1Insulation 07 84 00 SD-07 Certificates
2.1Firestopping Materials 3.3Inspection
09 22 00 SD-02 Shop Drawings 2.1Metal support systems
09 29 00 SD-03 Product Data 2.1.4Accessories
Certification SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions
2.1Material Safety Data Sheets SD-10 Operation and Maintenance Data
2.1Manufacturer maintenance instructions
09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 16 PAGES
09 51 00 SD-03 Product Data Acoustical Ceiling Systems Certification
SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
SD-06 Test Reports Fire Resistive Ceilings
1.2.1Ceiling Attenuation Class and Test
SD-07 Certificates 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
09 90 00 SD-03 Product Data Certification
SD-04 Samples Color
SD-07 Certificates 1.3Applicator's qualifications
SD-08 Manufacturer’s Instructions 3.3.1Application instructions 3.7.2Mixing 1.6.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 16 PAGES
09 90 00 Coatings:
23 00 00 SD-03 Product Data
Duct Connectors 2.5.2Duct Access Doors
Fire Dampers 2.5.3Manual Balancing Dampers
Acoustical Duct Liner 2.5.4.1Diffusers, Registers and Grilles
Centrifugal Fans SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation Instructions
3.7.2Operation and Maintenance Training
SD-10 Operation and Maintenance Data
3.7.1Operation and Maintenance Manuals
2.5.3Manual Balancing Dampers Centrifugal Fans
23 05 15 SD-01 Preconstruction Submittals Material, Equipment, and Fixture Lists
SD-02 Shop Drawings 1.2Record Drawings 1.2Connection Diagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 16 PAGES
23 05 15 1.2Coordination Drawings Fabrication Drawings
3.1Installation Drawings SD-03 Product Data
2.1Pipe and Fittings 2.2Piping Specialties 2.3Valves 2.4Miscellaneous Materials 2.5Supporting Elements
Equipment Foundation Data SD-10 Operation and Maintenance Data
3.8Operation and Maintenance Manuals
23 05 93 SD-01 Preconstruction Submittals 1.5.3.1TAB Firm 1.2TAB team field leader
SD-02 Shop Drawings 1.3.3TAB Schematic Drawings and
Report Forms SD-03 Product Data
1.5.3.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2Calibration 1.3.3Systems Readiness Check
TAB Execution
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 16 PAGES
23 05 93 TAB Verification SD-06 Test Reports
3.5TAB Procedures Summary 1.3.3Design review report 1.6.1.1Design review report 3.5Design review report 1.5.5.1TAB report 3.5TAB report
SD-07 Certificates 1.5.3.1TAB Firm 1.3.3Design review report 1.6.1.1Design review report 3.5Design review report
23 07 00 SD-03 Product Data 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems
23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 GCommissioning Plan
SD-03 Product Data 3.2.1Pre-Functional Performance Test
Checklists
3.2.2 GFunctional Performance Tests
SD-06 Test Reports
3.3 GCommissioning Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 16 PAGES
23 08 00.00 10 1.5.1Commissioning Firm 1.5.2Commissioning Specialist
23 09 23.13 20 SD-02 Shop Drawings
1.4.1.2 GList of I/O Points
1.4.1.3 GControl System Components List
1.4.1.4 GControl system schematics
1.4.1.5 GHVAC Equipment Electrical
Ladder diagrams 1.4.1.6Component wiring diagrams 1.4.1.7Terminal strip diagrams 1.4.1.8BACnet communication architecture schematic SD-03 Product Data
2.1.1 GDirect Digital Controllers
2.1.1.13 GBACnet Gateways
GBACnet Protocol Analyzer 2.1.2DDC Software
BACnet Operator Workstation DDC Software
2.2 GSensors and Input Hardware
2.3Output Hardware
SD-06 Test Reports
3.4.10 GPerformance Verification Testing
Report SD-07 Certificates
1.6.6 GContractor's Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 16 PAGES
23 09 23.13 20 SD-10 Operation and Maintenance Data
1.4BACnet Direct Digital Control Systems
3.3 GControls System Operators
Manuals
SD-11 Closeout Submittals
3.5.1 GTraining documentation
23 36 00.00 40 SD-02 Shop Drawings 2.1Shutoff Single-Duct Air Terminal
Units 3.3Record Drawings
SD-03 Product Data 2.1Shutoff Single-Duct Air Terminal
Units SD-10 Operation and Maintenance Data
3.3Operation and Maintenance Manuals
23 52 00 SD-02 Shop Drawings 1.4Detail Drawings
SD-03 Product Data 2.1.1Materials and Equipment 1.4Spare Parts 2.11Water Treatment System 2.11Boiler Water Treatment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 16 PAGES
23 52 00 3.4Heating System Tests 3.7Fuel System Tests 2.6Unit Heaters
Welding 3.4Qualifications 3.6Field Instructions
Tests SD-06 Test Reports
3.4Heating System Tests 3.7Fuel System Tests 3.4.1Water Treatment Testing
SD-07 Certificates Bolts
2.7.1Continuous Emissions Monitoring 2.1.3Energy Star
SD-10 Operation and Maintenance Data
3.6Operation and Maintenance Instructions
2.11Water Treatment System 23 64 10 SD-03 Product Data
3.1 GWater Chiller
3.1 GWater Chiller
3.4.1 GWater Chiller
3.4.1 GWater Chiller
3.4.2 GWater Chiller
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 16 PAGES
23 64 10 3.4.2 GWater Chiller 3.6Posted Instructions 1.5.1Verification of Dimensions 1.7Manufacturer's Multi-Year
Compressor Warranty Factory Tests
3.5System Performance Tests 3.6Demonstrations
SD-06 Test Reports 3.4Field Acceptance Testing 3.1Water Chiller 3.4.1Water Chiller 3.4.2Water Chiller
Factory Tests 3.5System Performance Tests
SD-07 Certificates 3.1.2Refrigeration System
SD-08 Manufacturer’s Instructions 3.1Water Chiller 3.4.1Water Chiller 3.4.2Water Chiller
SD-10 Operation and Maintenance Data
3.6 GOperation and Maintenance
Manuals
23 73 13.00 40 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 16 PAGES
23 73 13.00 40 3.1 GInstallation Drawings SD-03 Product Data
2.1 GEquipment and Performance
Data
1.3.2 GSample Warranty
SD-07 Certificates
3.1 GListing of Product Installations
1.3.1 GCertificates of Conformance
2.3Unit Cabinet 2.4Fan 2.5Drain Pans 2.6Insulation 2.7Plenums 2.1Spare Parts
1.5 GWarranty
SD-10 Operation and Maintenance Data
3.5 GOperation and Maintenance
Manuals
26 20 00 SD-02 Shop Drawings
2.10 GPanelboards
2.13 GTransformers
SD-03 Product Data
2.9 GReceptacles
2.10.3 GCircuit breakers
2.7 GSwitches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 16 PAGES
26 20 00 2.15 GMotor controllers GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.4Ground-fault receptacle test
SD-09 Manufacturer’s Field Reports
2.23.1Transformer factory tests SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
26 51 00 SD-03 Product Data
2.1 GFluorescent lighting fixtures
1.5.1 GFluorescent electronic ballasts
2.1.2 GFluorescent lamps
2.6 GEmergency lighting equipment
Environmental Data 1.5.3.3Energy Efficiency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR