Drawings_Change_Log_-_CZQZ_13-1080_Replace_HVAC_System_B135_-_26_Aug_2013_(2).pdf
PDF 138 KB Posted
- Attached to
- Notice Of Contract Award
- Solicitation number
- FA4855-13-B-0005
About this file
Drawings Change Log
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_Attendance_List.pdf | ||
| Statement_of_Work_-_CZQZ_13-1080_Replace_HVAC_System_B135_-_26_Aug_2013.pdf | ||
| pd2Amendment.doc | DOC document | |
| Bldg_135_Questions_ _Answers.doc | DOC document | |
| PLan_Set_-_CZQZ131080_-_Replace_HVAC_System_B135_-_26_August_2013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B135 Replace HVAC System
CZQZ 13‐1080
Drawings Change Log:
The following reflect changes made to the original contract drawings.
M‐101 ‐ Removed requirement to change the exhaust fan speed. (Keynote 3)
M‐101 ‐ Changed Keynote 3 to: Repair hole in the mechanical room wall above ceiling level.
M‐101 ‐ Keynote 9 is new.
M‐101 ‐ Keynote 2: Added the option to use galvanized steel as listed in the questions.
M‐101 ‐ Keynote 8: Added the requirement for a 7’ X 7’ double door entrance gate.
M‐101 ‐ Keynote 6: Move the location of the “Emergency HVAC System Shut‐Off Switch” to the corridor.
M‐201 ‐ change the route of the HVAC piping to show a more accurate route based on the site visit 23 August 2013.
M‐201 ‐ Added another location where an interior concrete wall will have to be drilled to allow the HVAC piping through.
M‐201 ‐ Keynote 6 is new.
M‐201 ‐ Keynote 7 is new.
M‐202 ‐ Keynote 4: Change pump head insulation requirement to only chilled water pumps.
M‐202 ‐ Keynote 6 is new.
M‐502 ‐ Added a freeze stat down‐stream of the cooling coil.