This is a Statement of Work (SOW) for the repair or replacement of a power divider assembly on a Flightline Crash Firetruck at Moody Air Force Base, Georgia.

The contract involves the removal, inspection, and repair or replacement of the power divider assembly (Part Number 3811870, Serial Number 10TBKAK168S104292) for a 2008 P-19 Oshkosh 1,500-gallon Aircraft Rescue & Fire Fighting (ARFF) vehicle to Original Equipment Manufacturer (OEM) standards using genuine OEM parts. The work is necessitated by a critical internal failure identified during routine maintenance, including metallic contamination found in the system fluid and fragmented spring assemblies. The contractor must provide flatbed transportation to pick up the vehicle from Moody AFB (buildings 977/983) and return it upon completion. Key scope items include comprehensive power divider system inspection for cracks and gear damage, battery maintenance or disconnection during the repair period, resealing with OEM-recommended sealants, and torquing all fasteners to OEM specifications. The contractor must also handle body panel alignment, hose routing and pressure testing, electrical harness routing with full functionality verification, and comprehensive post-repair operational testing to ensure zero leaks and OEM-standard pump performance. The contractor must provide a 12-month comprehensive warranty covering all parts and labor, with a requirement to respond to and complete warranty claims within ten working days, and must provide lead time status updates on parts availability and repair progress. The deliverable is a fully operational vehicle restored to OEM standards and ready for immediate service placement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.: TBD Contract No.:

Contract Title: Crash 15 power divider

CUI

23d Logistics Readiness Squadron

Crash 15 Power Divider Repair/Replace

Statement of Work (SOW)

Current as of: 8 Jun 2026

23d Contracting Squadron

Moody AFB, GA

STATEMENT OF WORK

Fire Truck Repair Moody AFB, GA

1. Description of Work:

1.1 Project Overview

A repair or replacement is necessary for the Flightline Crash Firetruck 2008 P-19 Oshkosh 1,500- Gallon Aircraft Rescue & Fire Fighting (ARFF), Serial Number: 10TBKAK168S104292 power divider assembly. Specifically, the proposed work includes the removal, inspection, and repair or replacement of the Power Divider assembly to OEM standards using genuine OEM par

1.2 Technical Background and Justification for Repair/Replacement During routine scheduled maintenance performed by Vehicle Maintenance personnel, a critical internal failure was identified within the vehicle's power divider. Diagnostics revealed the following discrepancies:

• Metallic Contamination: Upon draining Power Divider system fluid, substantial metallic shavings & debris were found adhered to the magnetic drain plug, indicating excessive wear or component disintegration.

• Internal Component Failure: Subsequent removal of the power divider oil pan revealed fragmented spring assemblies.

Based on these findings, a complete removal, teardown, and inspection of the Power Divider is mandatory to prevent catastrophic system failure, personnel safety mishaps, and to restore the vehicle to full-mission-capable status.

1.3 Primary Objective

The primary objective of this requirement is the complete restoration or replacement of the Power Divider to Original Equipment Manufacturer (OEM) standards. The Contractor shall ensure that all internal debris is cleared and that all failed, compromised components, and fasteners (i.e. bolts, screws, nuts, etc.) are replaced with genuine OEM parts to ensure the reliability of the ARFF mission-critical pumping and propulsion systems.

1.4 Vehicle & Power Divider Specifications

The Power Divider specifications are as follows:

• Manufacturer: Oshkosh

• Nomenclature: POWER DIVIDER, OSHKOSH, SERVICE

• Serial Number: 10TBKAK168S104292

• Part Number: 3811870

• Quantity: 1 Each

Vehicle Specifications are as follows:

• Flightline Crash Firetruck 2008 P-19 Oshkosh 1,500-Gallon Aircraft Rescue & Fire Fighting

(ARFF)

• VIN - 10TADLJF6GA774783

• Registration - 15L00031

2. Scope

2.1 Vehicle Transport

The Contractor shall provide transportation to and from Moody AFB 31699 and the Contractor’s facility for all necessitated repairs to the power divider regarding one (1) Flightline Crash Firetruck 2008 P-19 Oshkosh 1,500-Gallon ARFF, Serial Number: 10TBKAK168S104292. ATTLA attached as exhibit 1 for shipping reference.

2.1.1 Vehicle Transport (Contractor Pickup)

The contractor shall provide flatbed transportation to pick up one (1) Flightline Crash Firetruck, 2008 P-19 Oshkosh Legacy 1,500-Gallon ARFF, Serial Number: 10TBKAK168S104292 vehicle from Moody AFB, Vehicle Management Compound located near buildings 977/983 and transport it to the contractor’s facility.

2.1.2 Vehicle Transport (Return Delivery)

Return transportation of the repaired 2008 P-19 Oshkosh Legacy 1,500-Gallon ARFF shall be provided by the contractor upon successful completion of testing and final inspection to: Moody AFB, Vehicle Management Compound, buildings 977/983.

2.2 Battery Maintenance

The Contractor shall maintain or disconnect the vehicle’s batteries for the entire duration the vehicle is onsite at the Contractor's facility to ensure good battery serviceability. Failure to maintain proper battery condition will require the Contractor to supply and install new replacement batteries at no additional cost to the Government.

2.3 Power Divider Repair/Replacement

The Contractor shall remove, inspect, and repair/replace the vehicle's power divider with genuine OEM parts. This process shall include resealing the unit using Original Equipment Manufacturer (OEM) recommended sealants and torquing all bolts and nuts to strict OEM specifications. The Contractor shall replace any components that are damaged or outside of OEM tolerances with Original Equipment (OE) components; including but not limited to bolts, nuts, screws, etc.

2.4 Power Divider System Inspection

The Contractor shall comprehensively inspect every component connected to the power divider system. All mating surfaces must be verified to be free of cracks, deep scoring, or other defects.

Additionally, the Contractor shall inspect the internal drive gears within the power divider to ensure there is no damage, wear, or pitting on the gear teeth. Furthermore, the Contractor shall repair any threaded holes that are damaged or found to be out of specification during the repair process.

2.5 Body Panel Alignment and Installation

The Contractor shall carefully remove and reinstall any body panels necessitated by the repair process. All panels must be realigned, and mounting hardware must be torqued to OEM specifications. The Contractor shall ensure that all compartment doors close, latch, and seal properly following the realignment and installation of body panels.

2.6 Hose Routing and Replacement

The Contractor shall carefully remove and reinstall any hoses required to complete the repair. Upon reinstallation, all hoses shall be rerouted to their original OEM locations, properly tightened, and pressure-tested to ensure zero leakage. The Contractor shall replace, at their own expense, any hoses or fittings that are damaged, rounded, or stripped from mechanic error during the maintenance process.

2.7 Electrical Harness Routing and Functionality

The Contractor shall safely disconnect, remove, and reinstall any electrical wiring harnesses required to complete the repairs. All harnesses shall be securely routed to their original OEM locations to prevent chafing or thermal damage. The Contractor shall verify the full functionality of every electrical component and system that was disconnected during the repair phase.

2.8 Post-Repair Testing and Quality Assurance

Upon completion of all repairs, the Contractor shall perform comprehensive operational testing of the vehicle. The Contractor shall ensure there are no fluid or air leaks from any serviced component and verify that the pump system performs to OEM standards. The vehicle must be fully operational and ready to be placed into immediate service upon return to Moody AFB.

2.9 Warranty Requirements

The Contractor shall provide formal documentation for a comprehensive 12-month warranty covering all parts and labor associated with this repair. This warranty documentation must be signed, dated, and delivered upon completion of the vehicle. If a covered part or labor claim is initiated by the customer, The Contractor must respond to, initiate, and complete necessary repairs within ten

(10) working days – setting aside any parts delays.

2.10 Lead Time Requirements

The Contractor shall provide lead time information on status of repairs, especially if there are any delays in receiving parts or delays in delivering installation requirements

3. Deliverables: The vehicle has been restored to fully operational condition with all listed and necessary repairs completed IAW OEM standards. Contractor has performed all pre- and post-testing IAW OEM standards and ready to be placed into service.

23d Logistics Readiness Squadron
Crash 15 Power Divider Repair/Replace
Statement of Work (SOW)