Attachment 15 R0026 Q and A.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Communication Lines Installation, Tyndall AFB, FL Federal contract opportunity
Solicitation number
FA481922R0026
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Communication Lines Installation, Tyndall AFB, FL, newest first.
File Type Posted
Solicitation Amendment - FA481922R00260001.pdf PDF
Solicitation - FA481922R0026.pdf PDF
Attachment 06 - Wage Determination 20220005.pdf PDF
Attachment 11 - AF Form 3065.pdf PDF
Attachment 03 - Appendix B.pdf PDF
Attachment 05 - Section L M.pdf PDF
Attachment 10 - Sample RFI.PDF PDF
Attachment 13 - Proof of Financial Responsibility.pdf PDF
Attachment 14 Division Cost Estimate Worksheet.xlsx XLSX spreadsheet
Attachment 02 - Appendix A.pdf PDF
Attachment 04 - Other Contract Requirements.pdf PDF
Attachment 08 - AF Form 66.xls XLS spreadsheet
Attachment 01 - Statement of Work.pdf PDF
Attachment 07 - AF Form 3064.pdf PDF
Attachment 09 - AF Form 3000.pdf PDF
Attachment 12 - Base Access Request EAL.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question OwnerQuestionAnswer
325 CES1. In the Statement of Work in section 2.1.1 to Install two new telecommunications hand holes: Can the Government verity what type and size hand holes will be required?See Tyndall IFS
2. In the Statement of Work in section 2.1.2 install new 4” diameter conduits. Can you answer the following questions?
325 CES2a. Can the Government verify the estimated footage for the Two (2) 4” conduits, between HH574-A to NHH1?These will be dependent on where the DOR elects to set NHH1
325 CES2b. Can the Government confirm that the approximate footage for the One (1) 4” conduit, between NHH1 to NHH2 is 975 LF?Bidders need to note that all lengths shown are approximates obtained by scaling off of maps.
325 CES2c. Can the Government verify the estimated footage for One (1) 2” inch conduit, between NHH2 to B1259M Telecommunications Room? Does 325 LF include footage into B1259M Telecommunications Room?This footage is from point to point as scaled off of maps. It does not include footage into the Telecommunications Room.
325 CES2d. Can the government confirm if the 2” conduit that needs to go into the Telecommunications Room for B1259M?

i. Should it be placed underground and come up through the floor in the Telecommunications Room.

ii. Should the contractor place a Nema Box on the wall outside the Telecommunications room and bore through the wall?

iii. If it’s decided to install a Nema Box on the wall outside the Telecommunications room can the Government confirm what type of Conduit needs to be provided from the ground into the Nema Box and what size Nema Box will be required?

i. Contractor’s option as determined by the DOR.

ii. Contractor’s option as determined by the DOR

iii. Contractor’s option as determined by the DOR 325 CES e. During the Site Visit it was mentioned that the contractor will be installing a 2” conduit between B1259M Telecommunications Room to the Natural Resource Building.

i. Can the Government confirm what the footage will be between building B1259M, and the room located in Natural Resource Building?

ii. Can the Government confirm how the conduit should enter the Natural Resources Building? Should the contactor provide a Nema Box at this location?

i. Approximately 350 feet from room to room.

ii. Contractor’s option as determined by the DOR

3. In the Statement of Work in section 2.1.3 Bring 144 strand fiber optic line from the ITN within AFNORTH Bldg. to NHH1. Leave a 50-foot coil at NHH1. Can the Government verify the following information?
325 CES3a. Can the Government confirm that the 1200 LF that is on the drawing includes footage inside ITN and the room that the contractor will bring the fiber into located in the ITN?This footage is from point to point as scaled off of maps. It does not include footage into the ITN Room
325 CES3b. It states to leave a 50-foot coil at NHH1. Does the Government what any fiber coil inside the ITN?The fiber inside the ITN has to be connected in order to complete the testing requirements of the SOW.
325 CES3c. Can the Government confirm how and where the 144-fiber cable will be terminated? 108 strand to terminate in NHH1 while the other 36 strand is terminated in the telecommunications room of B1259.

i. Can the Government confirm if the contractor needs to provide a Fiber Optic Distribution Panel?

ii. Can the Government confirm if contactor needs to provide Fiber Modules or Cassettes?

iii. Can the Government confirm if the contractor needs to provide terminations of the fiber and what type?

3c. 108 strand to terminate in NHH1 while the other 36 strand is terminated in the telecommunications room of B1259.

i. The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination.

Ii. The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination.

iii. The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination.

4. In the Statement of Work in section 2.1.4 Splice 36 strand of fiber optic onto the 144 strands at NHH1. Bring these 36 strands into the Telecommunications Room of B1259.
325 CES4a. Can the Government confirm if the contactor needs to provide a Fiber Optic Distribution Panel?The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination
325 CES4b. Can the Government confirm if the contactor needs to provide Fiber Modules or Cassettes?The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination
325 CES4c. Can the Government confirm if the contactor needs to provide terminations of the fiber and what type?The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination
325 CES5. In the Statement of Work in section 2.2 Provide and install the necessary equipment for full telecommunications requirements within the new Wildland Fire Facility (B1259M).

This equipment includes: Can the Government Confirm Specifications for the following?

• Cabinet- What size and Type Cabinet should the contractor provide. Should it be a Wall Mount Cabinet?

• Patch panel – What type of Patch Panel should the contractor provide?

• Is this for fiber and would it be a Fiber Optic Dist. Panel?

• Does the contractor need to provide a CAT6 Patch Panel?

• Cable management -this will depend on the type of cabinet.

• Switch- Is a switch required for this scope and if yes can you provide specifications on the type of switch.

• UPS- Can the Government provide type and size of the UPS?

The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination. All bullet points in this item 5, have the same answer.
6. In the Statement of Work in section 2.3 Install a new 2” diameter conduit from the telecommunications room in B1259 to the multi-purpose room in B1260M (Natural Resources). Run a CATVI telecommunications line within this conduit and terminate it in a wall mount location along the west wall.

In Room B1260M can the Government Confirm the following?

325 CES6a. Can the Government confirm whether the contractor should provide a CAT5 or CAT6 cable?CAT6
325 CES6b. Can the Government confirm how the contractor needs to terminate the CAT5 or CAT6 line? Should the contractor provide a patch panel or provide a jack termination?
Jack termination
325 CESc. Can the Government confirm if the contractor needs to provide a cabinet at this location?No
7. In the Statement of Work in section 2.1.9 All telecommunications work shall be done in accordance with UFC 3-580-01 and the Tyndall IFS
325 CES7a. Can the Government Provide the Tyndall IFS?The Tyndall IFS is accessible to the public through the internet.
325 CES8. Does the Government require As-built drawings once the work has been completed? If As-built drawings are required, will PDF format be adequate?Yes and yes.
325 CES9. How many standard 3-cell 3" innerducts are required in new and existing conduits?Each duct shall have 3, 3-cell interducts
325 CES10. How many traceable 3-cell 3" innerducts are required in new and existing conduits?one must be traceable