Attachment 15 R0026 Q and A.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Communication Lines Installation, Tyndall AFB, FL Federal contract opportunity
- Solicitation number
- FA481922R0026
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - FA481922R00260001.pdf | ||
| Solicitation - FA481922R0026.pdf | ||
| Attachment 06 - Wage Determination 20220005.pdf | ||
| Attachment 11 - AF Form 3065.pdf | ||
| Attachment 03 - Appendix B.pdf | ||
| Attachment 05 - Section L M.pdf | ||
| Attachment 10 - Sample RFI.PDF | ||
| Attachment 13 - Proof of Financial Responsibility.pdf | ||
| Attachment 14 Division Cost Estimate Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 02 - Appendix A.pdf | ||
| Attachment 04 - Other Contract Requirements.pdf | ||
| Attachment 08 - AF Form 66.xls | XLS spreadsheet | |
| Attachment 01 - Statement of Work.pdf | ||
| Attachment 07 - AF Form 3064.pdf | ||
| Attachment 09 - AF Form 3000.pdf | ||
| Attachment 12 - Base Access Request EAL.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question Owner | Question | Answer |
| 325 CES | 1. In the Statement of Work in section 2.1.1 to Install two new telecommunications hand holes: Can the Government verity what type and size hand holes will be required? | See Tyndall IFS |
| 2. In the Statement of Work in section 2.1.2 install new 4” diameter conduits. Can you answer the following questions? | ||
| 325 CES | 2a. Can the Government verify the estimated footage for the Two (2) 4” conduits, between HH574-A to NHH1? | These will be dependent on where the DOR elects to set NHH1 |
| 325 CES | 2b. Can the Government confirm that the approximate footage for the One (1) 4” conduit, between NHH1 to NHH2 is 975 LF? | Bidders need to note that all lengths shown are approximates obtained by scaling off of maps. |
| 325 CES | 2c. Can the Government verify the estimated footage for One (1) 2” inch conduit, between NHH2 to B1259M Telecommunications Room? Does 325 LF include footage into B1259M Telecommunications Room? | This footage is from point to point as scaled off of maps. It does not include footage into the Telecommunications Room. |
| 325 CES | 2d. Can the government confirm if the 2” conduit that needs to go into the Telecommunications Room for B1259M? |
i. Should it be placed underground and come up through the floor in the Telecommunications Room.
ii. Should the contractor place a Nema Box on the wall outside the Telecommunications room and bore through the wall?
iii. If it’s decided to install a Nema Box on the wall outside the Telecommunications room can the Government confirm what type of Conduit needs to be provided from the ground into the Nema Box and what size Nema Box will be required?
i. Contractor’s option as determined by the DOR.
ii. Contractor’s option as determined by the DOR
iii. Contractor’s option as determined by the DOR 325 CES e. During the Site Visit it was mentioned that the contractor will be installing a 2” conduit between B1259M Telecommunications Room to the Natural Resource Building.
i. Can the Government confirm what the footage will be between building B1259M, and the room located in Natural Resource Building?
ii. Can the Government confirm how the conduit should enter the Natural Resources Building? Should the contactor provide a Nema Box at this location?
i. Approximately 350 feet from room to room.
ii. Contractor’s option as determined by the DOR
| 3. In the Statement of Work in section 2.1.3 Bring 144 strand fiber optic line from the ITN within AFNORTH Bldg. to NHH1. Leave a 50-foot coil at NHH1. Can the Government verify the following information? | ||
| 325 CES | 3a. Can the Government confirm that the 1200 LF that is on the drawing includes footage inside ITN and the room that the contractor will bring the fiber into located in the ITN? | This footage is from point to point as scaled off of maps. It does not include footage into the ITN Room |
| 325 CES | 3b. It states to leave a 50-foot coil at NHH1. Does the Government what any fiber coil inside the ITN? | The fiber inside the ITN has to be connected in order to complete the testing requirements of the SOW. |
| 325 CES | 3c. Can the Government confirm how and where the 144-fiber cable will be terminated? 108 strand to terminate in NHH1 while the other 36 strand is terminated in the telecommunications room of B1259. |
i. Can the Government confirm if the contractor needs to provide a Fiber Optic Distribution Panel?
ii. Can the Government confirm if contactor needs to provide Fiber Modules or Cassettes?
iii. Can the Government confirm if the contractor needs to provide terminations of the fiber and what type?
3c. 108 strand to terminate in NHH1 while the other 36 strand is terminated in the telecommunications room of B1259.
i. The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination.
Ii. The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination.
iii. The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination.
| 4. In the Statement of Work in section 2.1.4 Splice 36 strand of fiber optic onto the 144 strands at NHH1. Bring these 36 strands into the Telecommunications Room of B1259. | ||
| 325 CES | 4a. Can the Government confirm if the contactor needs to provide a Fiber Optic Distribution Panel? | The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination |
| 325 CES | 4b. Can the Government confirm if the contactor needs to provide Fiber Modules or Cassettes? | The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination |
| 325 CES | 4c. Can the Government confirm if the contactor needs to provide terminations of the fiber and what type? | The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination |
| 325 CES | 5. In the Statement of Work in section 2.2 Provide and install the necessary equipment for full telecommunications requirements within the new Wildland Fire Facility (B1259M). |
This equipment includes: Can the Government Confirm Specifications for the following?
• Cabinet- What size and Type Cabinet should the contractor provide. Should it be a Wall Mount Cabinet?
• Patch panel – What type of Patch Panel should the contractor provide?
• Is this for fiber and would it be a Fiber Optic Dist. Panel?
• Does the contractor need to provide a CAT6 Patch Panel?
• Cable management -this will depend on the type of cabinet.
• Switch- Is a switch required for this scope and if yes can you provide specifications on the type of switch.
• UPS- Can the Government provide type and size of the UPS?
| The DOR shall follow the Tyndall IFS and the appropriate UFC to make this determination. All bullet points in this item 5, have the same answer. | |
| 6. In the Statement of Work in section 2.3 Install a new 2” diameter conduit from the telecommunications room in B1259 to the multi-purpose room in B1260M (Natural Resources). Run a CATVI telecommunications line within this conduit and terminate it in a wall mount location along the west wall. |
In Room B1260M can the Government Confirm the following?
| 325 CES | 6a. Can the Government confirm whether the contractor should provide a CAT5 or CAT6 cable? | CAT6 |
| 325 CES | 6b. Can the Government confirm how the contractor needs to terminate the CAT5 or CAT6 line? Should the contractor provide a patch panel or provide a jack termination? | |
| Jack termination | ||
| 325 CES | c. Can the Government confirm if the contractor needs to provide a cabinet at this location? | No |
| 7. In the Statement of Work in section 2.1.9 All telecommunications work shall be done in accordance with UFC 3-580-01 and the Tyndall IFS | ||
| 325 CES | 7a. Can the Government Provide the Tyndall IFS? | The Tyndall IFS is accessible to the public through the internet. |
| 325 CES | 8. Does the Government require As-built drawings once the work has been completed? If As-built drawings are required, will PDF format be adequate? | Yes and yes. |
| 325 CES | 9. How many standard 3-cell 3" innerducts are required in new and existing conduits? | Each duct shall have 3, 3-cell interducts |
| 325 CES | 10. How many traceable 3-cell 3" innerducts are required in new and existing conduits? | one must be traceable |