Questions and Answers.pdf
PDF 397 KB Posted
- Attached to
- Repair Pavements, Multi Federal contract opportunity
- Solicitation number
- FA481920R0029
About this file
This document contains questions and answers regarding a federal contract opportunity to repair pavements at Tyndall Air Force Base. The opportunity involves tasks to mill and overlay approximately 6,430 square yards of asphalt in a parking lot, which will require removing existing parking blocks, milling one inch of asphalt, preparing the milled surface, overlaying with one inch of asphalt, and replacing parking blocks. It also asks whether silt fencing would be needed along Camp Eagle Road during the work, noting that best management practices to control stormwater runoff and prevent migration of materials from the work area, such as silt fencing, shall be employed as necessary.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers 2.pdf | ||
| Draft Boring Logs Repair Pavements.pdf | ||
| Revised Task 12 Criteria Drawing.pdf | ||
| Solicitation - FA481920R0029.pdf | ||
| Attachment 10 General Financial Information.pdf | ||
| Attachment 9 Sample RFI.PDF | ||
| Attachment 2 Appendix A Drawings.pdf | ||
| Attachment 1 Statement of Work.pdf | ||
| Attachment 3 Appendix B Pricing Schedule.pdf | ||
| Attachment 6 AF Form 3000.pdf | ||
| Attachment 4 AF 66.pdf | ||
| Attachment 7 AF 3064.pdf | ||
| Attachment 8 AF 3065.pdf | ||
| Attachment 5 Wage Determination.pdf | ||
| Attachment 11 Other Contract Requirements.pdf | ||
| Solicitation - FA481920R0029.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers:
1. Please clarify items A and F : 2.2.3.2 Task 3.2 (B1230 Asphalt Parking)
Mill and Overlay asphalt parking area. Area is approximately 6,430 SY.
A.Remove parking blocks
B.Mill 1 inch of existing asphalt pavement
C.Prepare milled surface for overlay
D.Place 1 inch of SP9.5 asphalt pavement
E.Paint new pavement markings to match existing
F.Replace parking blocks
Task 3.2 is intended to rehabilitate the Building 1230 parking lot which contains existing parking blocks (stops). The existing parking blocks will need to be removed (item A) in order to perform the mill and overlay procedures and reinstalled (item F) upon completion of the rehabilitation work. Existing parking blocks may be reused.
2. Please clarify items Camp Eagle Road. Would a silt fence require along the road at Camp
Eagle Road?
Per Section 3.8 of the Statement of Work, Contractor shall plan, construct, operate, maintain, optimize, and commission systems necessary to control any storm water run‐on and runoff. At a minimum, the Contractor shall employ best management practices consistent with the Florida
Development Manual, Chapter 6, Stormwater and Erosion and Sediment Control Best
Management Practices for Developing Areas. In summary, silt fence or other means shall be employed where and to the extent necessary to prevent migration of materials from the work area.