Questions and Answers.pdf

PDF 397 KB Posted

Attached to
Repair Pavements, Multi Federal contract opportunity
Solicitation number
FA481920R0029
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains questions and answers regarding a federal contract opportunity to repair pavements at Tyndall Air Force Base. The opportunity involves tasks to mill and overlay approximately 6,430 square yards of asphalt in a parking lot, which will require removing existing parking blocks, milling one inch of asphalt, preparing the milled surface, overlaying with one inch of asphalt, and replacing parking blocks. It also asks whether silt fencing would be needed along Camp Eagle Road during the work, noting that best management practices to control stormwater runoff and prevent migration of materials from the work area, such as silt fencing, shall be employed as necessary.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Pavements, Multi, newest first.
File Type Posted
Questions and Answers 2.pdf PDF
Draft Boring Logs Repair Pavements.pdf PDF
Revised Task 12 Criteria Drawing.pdf PDF
Solicitation - FA481920R0029.pdf PDF
Attachment 10 General Financial Information.pdf PDF
Attachment 9 Sample RFI.PDF PDF
Attachment 2 Appendix A Drawings.pdf PDF
Attachment 1 Statement of Work.pdf PDF
Attachment 3 Appendix B Pricing Schedule.pdf PDF
Attachment 6 AF Form 3000.pdf PDF
Attachment 4 AF 66.pdf PDF
Attachment 7 AF 3064.pdf PDF
Attachment 8 AF 3065.pdf PDF
Attachment 5 Wage Determination.pdf PDF
Attachment 11 Other Contract Requirements.pdf PDF
Solicitation - FA481920R0029.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers:

1. Please clarify items A and F : 2.2.3.2 Task 3.2 (B1230 Asphalt Parking)

Mill and Overlay asphalt parking area. Area is approximately 6,430 SY.

A.Remove parking blocks

B.Mill 1 inch of existing asphalt pavement

C.Prepare milled surface for overlay

D.Place 1 inch of SP9.5 asphalt pavement

E.Paint new pavement markings to match existing

F.Replace parking blocks

Task 3.2 is intended to rehabilitate the Building 1230 parking lot which contains existing parking blocks (stops). The existing parking blocks will need to be removed (item A) in order to perform the mill and overlay procedures and reinstalled (item F) upon completion of the rehabilitation work. Existing parking blocks may be reused.

2. Please clarify items Camp Eagle Road. Would a silt fence require along the road at Camp

Eagle Road?

Per Section 3.8 of the Statement of Work, Contractor shall plan, construct, operate, maintain, optimize, and commission systems necessary to control any storm water run‐on and runoff. At a minimum, the Contractor shall employ best management practices consistent with the Florida

Development Manual, Chapter 6, Stormwater and Erosion and Sediment Control Best

Management Practices for Developing Areas. In summary, silt fence or other means shall be employed where and to the extent necessary to prevent migration of materials from the work area.