About this file

This document contains questions and answers regarding a federal contract opportunity to repair pavements at Tyndall Air Force Base. The work will primarily involve mill and overlay procedures, new permanent pavement markings, and complete reconstruction of one area. Concurrent work is acceptable, with contractors needing to follow phasing, notification, operational, and coordination requirements outlined in the Statement of Work. Landscape restoration will be required for any disturbed areas, with the quantity dependent on the level of care taken during construction. A concrete pavement area under Task 12.2 has been removed from the scope, as reflected in an attached revised Criteria Drawing.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Pavements, Multi, newest first.
File Type Posted
Draft Boring Logs Repair Pavements.pdf PDF
Revised Task 12 Criteria Drawing.pdf PDF
Questions and Answers.pdf PDF
Solicitation - FA481920R0029.pdf PDF
Attachment 9 Sample RFI.PDF PDF
Attachment 2 Appendix A Drawings.pdf PDF
Attachment 1 Statement of Work.pdf PDF
Attachment 3 Appendix B Pricing Schedule.pdf PDF
Attachment 6 AF Form 3000.pdf PDF
Attachment 4 AF 66.pdf PDF
Attachment 7 AF 3064.pdf PDF
Attachment 8 AF 3065.pdf PDF
Attachment 5 Wage Determination.pdf PDF
Attachment 11 Other Contract Requirements.pdf PDF
Solicitation - FA481920R0029.pdf PDF
Attachment 10 General Financial Information.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers 2:

1. Will the Contractor has access to all sites after NTP, or will the areas be given in multiple phases?

GOV: Concurrent work is acceptable. Please refer to SOW for details on the phasing, notification, operational, and coordination requirements.

2. Will any Sod / Hydroseed be required on the project?

GOV: Restoration of disturbed landscape is required. The quantity required will be dependent upon the contractors level of care during the construction process.

3. Please clarify the intent of Task 12.2. At time of site visit, it was unsure if the concrete pad should be left in place or removed and a asphalt pad be installed.

GOV: The concrete pavement area of Task 12.2 has been removed from the scope to match Statement of Work. The revised Criteria Drawing for Task 12 is attached.