Oil_Water_Separator_PWS.pdf

PDF 602 KB Posted

Attached to
Oil Water Separator Service Federal contract opportunity
Solicitation number
FA481917R6005
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 1 - PWS

View the file

Other files for this federal contract opportunity

Other files attached to Oil Water Separator Service, newest first.
File Type Posted
Attachment_4_Site_Visit_Authorization_Letter.docx DOCX document
Attachment_3_Financial_Reference_Sheet.docx DOCX document
FA481917R6005.pdf PDF
Attachment_2_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4819-17-R-6005

PERFORMANCE

WORK

STATEMENT (PWS)

OIL WATER SEPARATORS, SEDIMENT/SAND

TRAPS & GREASE TRAPS

CONTRACT # FA4819-17-R-6005

TYNDALL AFB, FLORIDA

DATE: 5 OCT 2017

TABLE OF CONTENTS

Section Number and Title Page Number

1.0 Description of Services 2-4

2.0 Services Summary 5

3.0 Government Furnished Property and Services 6

4.0 General Information 6

5.0 Services Performed During Crisis 11

6.0 Environmental Requirements 11

7.0 Appendices 13

Appendix A-1 thru A-6 Workload Data 13-16

Appendix B, Acronyms and Definitions 17

Appendix C, Publications and Forms 18-19

1.0. DESCRIPTION OF SERVICES

The contractor shall provide all management, tools, equipment and labor necessary to skim, empty and/or clean oil water separators (OWS), sediment/sand traps, grease traps, scum from final lift station and water from underground fuel storage containments located at Tyndall AFB, Florida. The contractor shall also provide testing, upon request from the government, on oily water substances as identified in paragraph 1.1.5.

Work shall comply with government and commercial standards. OWS, sediment/sand traps and grease traps will be 100% surveilled by the COR to ensure proper servicing. See Appendix A-1 thru A-6 for location, size and frequency of cleanings. All work performed by the contractor shall be performed in accordance with all applicable laws, regulations, Headquarters Air Force standards, instructions and commercial practices.

1.1 MAINTENANCE OF OIL/WATER SEPARATORS AND GREASE TRAPS

1.1.1. OIL WATER SEPARATORS

1.1.1.1 Vacuum truck shall be empty of any contents prior to starting oil water separator service. Contractor shall not bring any materials from other locations onto Tyndall AFB.

1.1.1.2 Annual Testing: The contractor shall perform annual TCLP (Toxicity Characteristic Leaching

Procedure) and RCI (Reactivity Corrosivity Ignitability) tests of the contents (floating materials, liquid and sludge) for proper characterization for disposal. Provide results to the government.

1.1.1.3 The test for chlorinated hydrocarbons shall be accomplished using “Clor-d- tect 1000” used oil screening kit or equivalent. This test shall be performed on the surface oils from the oil water separators being serviced for the month. Document results on the receipt provided at the end of the day.

1.1.1.4 If non-hazardous, the contractor shall proceed with the cleaning.

1.1.1.5 If such tests indicate a presence of chlorinated hydrocarbons or hazardous materials in the separator, the servicing of the separator shall be terminated and the contractor shall contact the COR, who will contact the installation environmental office.

1.1.1.6 On a monthly basis: skim/pump all oil, oil residue and other waste from the surface of the water in the oil water separator.

1.1.1.7 Transport materials removed from oil water separators to an approved off-base disposal facility.

1.1.1.8 If not previously approved, the name address and telephone number of this facility shall be submitted to the environmental office for approval.

1.1.1.9 Documents showing each delivery amount, type of waste, facility name and date shall be forwarded to the COR office within 15 days of each delivery. This document is to be submitted prior to the invoices.

Any differences between the contract inventory and what was actually picked up or transported must be thoroughly described and documented.

1.1.1.10 Annual Cleaning: All OWSs and associated sand interceptors will be thoroughly cleaned out annually.

1.1.1.10.1 Remove all water from the separator.

1.1.1.10.2 Measure and document the depth or volume of the grit and sludge prior to pumping/cleaning.

1.1.1.10.3 Remove all grit, sludge and sediment from all compartments/areas/cavities of the OWS.

1.1.1.10.4 Use a high pressure cleaning device to clean the interior walls, bottom and internal components of the OWS and ancillary equipment. Pump out remaining residue after cleaning.

1.1.1.10.5 Document the structural and operational condition of the unit and associated equipment. Provide documentation to the COR.

1.1.1.10.6 Refill the OWS with clean, clear water as required for the unique configuration of the separator.

This level should be at least as high as the oil baffle(s) or effluent invert/weir. Waste oil holding tanks

(whether integral to the unit or separate) and sand interceptors must not be filled with water after cleaning.

1.1.1.10.7 Transport all materials from oil water separators to an approved off-base disposal facility. The name address and telephone number of this facility shall be submitted to the environmental office for approval prior to the first use.

1.1.1.10.8 Documents showing each delivery amount, type of waste, facility name and date shall be forwarded to the COR office within 15 days of each delivery. This document is to be submitted prior to the invoices. Any differences between the contract inventory and what was actually picked up or transported must be thoroughly described and documented.

1.1.2 WASHRACK RINSE WATER STORAGE TANKS

1.1.2.1 There are two above ground and one underground wash rack rinse water storage tanks. Completely empty contents of wash rack storage tanks and transport/dispose of at an OWS located on Tyndall AFB that is approved by 325 CES/CEIE. See appendix A-2 for tank locations and approximate quantities.

1.1.3 GREASE TRAPS

1.1.3.1 Vacuum truck shall be empty of any contents prior to starting grease trap service. Contractor shall not bring any materials from other locations onto Tyndall AFB.

1.1.3.2 On a monthly basis, skim/pump out all grease and residues from surface of grease trap.

1.1.3.3 Transport all materials from grease traps to an approved off-base disposal facility. The name, address and telephone number of this facility (or facilities) shall be submitted to the environmental office for approval prior to the first use.

1.1.3.4 Annual Cleaning: All Grease Traps will be thoroughly cleaned out annually.

1.1.3.5 Remove all grease and water from trap.

1.1.3.6 Remove waste build up from trap or pit walls and all associated equipment within the pit.

1.1.3.7 Wash system down with clean water and pump out remaining residue as required by the unique configuration of the grease trap. Residual or recharge water must be higher than lower inlets. Clear obstructions in inlet/outlet pipes to ensure unrestricted flow.

1.1.3.8 Transport all materials from grease traps to an approved off-base disposal facility. The name, address and telephone number of this facility (or facilities) shall be submitted to the environmental office for approval prior to the first use.

1.1.3.9 Documents showing each delivery amount, type of waste, facility name and date shall be forwarded to the COR office within 15 days of each delivery. This document is to be submitted prior to the invoices.

Any differences between the contract inventory and what was actually picked up or transported must be thoroughly described and documented.

1.1.4 SEDIMENT / SAND TRAPS

1.1.4.1 Vacuum truck shall be empty of any contents prior to starting sediment / sand trap service.

Contractor shall not bring any materials from other locations onto Tyndall AFB.

1.1.4.3 Remove grates, remove all contents of sediment / sand traps by any means necessary. Reinstall grates.

1.1.4.4 Transport all materials from sediment / sand traps to an approved off-base disposal facility.

1.1.5 CHARACTERIZATION TESTING

1.1.5.1 Upon government request, provide/perform the following: (Exact test will be determined by the government)

A. Full Toxicity Characterization Leaching Procedure (TCLP). This tests for all RCRA Toxicity

Characteristics

B. Florida Petroleum Range Organics (FLO-PRO)

C. Flash Point measured by either ASTM Standard D 93-79 of ASTM Standard D 3278-78

D. pH using a meter by test method #9040C in EPA Publication SW-846

1.1.5.2 Once per year, test all OWS prior to total cleanouts. See Appendix A-1. Provide the results to the government.

1.1.5.3 Upon the governments request, respond during normal work hours to provide testing on OWS, grease traps, lift stations, sand traps or any substance that needs evaluation. Provide results to the government.

1.1.6 REMOVAL OF SEDIMENT FROM FINAL LIFT STATION (BUILDING 1722) AND

SEDIMENT/SAND TRAP B1750

1.1.6.1 The contractor shall remove sand, scum, sludge, debris or any other sediment (floating or settled) from the final lift station/wet well B1722 (facility/chamber that contains the lift pumps). See Appendix 5 for workload data/frequency of cleaning.

1.1.6.2 On a monthly basis: remove scum/sludge/septic like materiel from the contact chamber B1750.

1.1.6.3 The contractor shall remove sand, scum, sludge, debris or any other sediment (floating or settled) from the contact chamber/sediment-sand trap B1750 (facility that sewer water flows through prior to the wet well). See Appendix 5 for workload data/frequency of cleaning.

1.1.6.4 All materials removed during the servicing will be taken off base to an approved disposal facility.

No material will be put on the ground for drying purposes or left on the premises for any length of time.

1.1.7 REMOVAL OF WATER/FUEL FROM UNDERGROUND FUEL STORAGE TANK

SECONDARY CONTAINMENT

1.1.7.1 The contractor shall remove water and fuel mix from underground fuel storage tank secondary containment systems. Secondary containment systems accumulate storm water after heavy rain events and must be removed. Water/fuel mix shall be transported to an approved off base disposal facility. See

Appendix A-6 for locations and approximate quantities.

1.1.8 EMERGENCY SERVICE CALLS. Normally all work will be in accordance with the contractor’s work schedule. Unexpected services may be required in the event of natural disasters, unscheduled repairs to pipes or other infrastructure or discovery of foreign liquids involving oil water separators, sediment/sand traps, grease traps or lift stations. In the event that servicing is required outside the contractor’s schedule, the contractor shall begin the service within 24 hours after notification.

1.1.9 WORK SCHEDULES. Monthly services will be scheduled and coordinated with the COR. Annual total clean-out will be scheduled and coordinated with the COR to ensure enough manning is available for surveillance.

1.1.10 SAFETY AND HEALTH STANDARDS. The contractor shall initiate and maintain programs to comply with the provisions of the Occupational Safety and Health Standards Act concerning entry requirements into confined spaces and handling of potentially hazardous substances.

2.0. SERVICES SUMMARY (SS): The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SS and the contractor’s quality control plan provide information on contract requirements, the expected level of contractor performance, and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success.

Performance Objective PWS Par Performance Threshold

SS#1

Monthly Service of Oil/Water

Separators: Remove by skimming oil, grease and sludge and properly dispose of at an approved waste site. This objective requires 100% surveillance.

1.1.1 No more than 1 customer

complaint per service

SS#2

Annual Total Cleanout of Oil Water

Separators: Empty water, remove all sludge, pressure wash sides and bottom and refill with clean water. This objective requires 100% surveillance.

1.1.1.10 No more than 2 customer

complaints per service

SS#3

Monthly Service of Grease Traps: Remove all grease and sludge from traps. Replenish with clean water if necessary. Dispose of at an approved waste site. This objective requires 100% surveillance.

1.1.3 No more than 1 customer

complaint per service

SS#4

Removal of sediment and sand:

Remove all sediment and sand from traps as identified in Appendix A-4

1.1.4 No more than 1 customer

complaint per service

SS#5

Remove all sand and scum from final lift station and sediment chamber and dispose of at an off base facility

1.1.6 No more than 1 customer

complaint per service

SS#6

Remove all water from underground fuel storage tanks and dispose of at an off base facility

1.1.7 No more than 1 customer

complaint per service

SS#7

Emergency Service Calls: Service calls handled promptly and work completed as requested

1.1.8 The contractor shall ensure 100

percent compliance.

3.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES-Reserved

3.1. GOVERNMENT FURNISHED FACILITIES-Reserved

3.2. GOVERNMENT FURNISHED SUPPLIES AND EQUIPMENT-Reserved

3.3. GOVERNMENT FURNISHED UTILITIES. The government will furnish electricity, water and sewage service as necessary for accomplishment of work in accordance with this contract.

3.3.1. UTILITY CONSERVATION. The contractor shall adhere to all base level utility conservation practices or requirements. The contractor shall be responsible for operating under conditions that prevent waste of utilities.

3.4. TELEPHONE SERVICE-Reserved

3.5. SECURITY, FIRE AND MEDICAL SERVICES. The government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available on a cost reimbursement basis.

4.0. GENERAL INFORMATION

4.1. SECURITY

4.1.1. SUITABILITY INVESTIGATIONS.

4.1.1.1 Personnel working in a government facility for less than 6 months or working anywhere on

Tyndall AFB property are required to have a Local Files Check. The Unit Security Manager will coordinate the Background Affidavit (with Pass & ID) and DBIDS Application– allow 3-5 day process time. A favorable local files check is required to be granted base access. All contracts prohibit hiring of illegal aliens for base duties and corrective/punitive actions can be taken when violations occur (AFI 63-113, ACC Sup).

4.1.1.2. Personnel working in a government facility 6 months or longer or at any time requiring access to the Local Area Network will require a National Agency Check with Written Inquiry (NACI). An open

NACI Investigation, at a minimum, is required before access to government furnished workstations that have access to Air Force e-mail systems can be granted. A Network Waiver may be granted by the Unit Commander after completion of an “Open” NACI reflects in JPAS. These investigations shall be submitted by the government at no additional cost to the contractor. Personnel requiring Unescorted Entry to Restricted Areas, require a favorably completed NACI clearance – IAW DoD 5200.2-R, Personnel Security Program.

4.1.2. PASS AND IDENTIFICATION ITEMS. The contractor shall ensure the following pass and identification items required for contract performance are obtained for employees and non-government owned vehicles:

a. DBIDS, Defense Biometrics Identification System - Contractor Identification Card.

Process a DBIDS Application to obtain a DBIDS contractor ID card (If no network access is required). A DBIDS contractor ID card is required for performance on the installation in a contractor capacity, regardless of alternate base access forms of identification (ex: retired military ID).

b. AF Form 1199, USAF Restricted Area Badge, or a locally developed badge (if applicable).

c. DoD Common Access Card (CAC), AFI 36-3026_IP, Vol 1. Process through USM, Trusted Agent Sponsorship System (TASS) point of contact for a CAC card (If network access is required). A CAC (contractor) ID card is required for performance on the installation in a contractor capacity, regardless of alternate base access forms of identification (ex: retired military ID).

d. AF Form 75, Visitor/Vehicle Pass (AFI 31-204): The contractor shall adhere to local security policy when applying for short/long term visitors’ passes. Any contractor requesting a pass for more than 3 days will complete a Local Files Check with 325 SFS/Pass & ID.

Vehicle passes (personal vehicles) are no longer required.

4.1.3. RETRIEVING IDENTIFICATION MEDIA. The contractor shall retrieve all identification media from employees who depart for any reason before the contract expires; e.g., terminated for cause, retirement and submit them to the COR.

4.1.4. LISTING OF EMPLOYEES-Reserved

4.1.5. COMPUTER SECURITY REQUIREMENTS-Reserved

4.1.6. ANTI-TERRORISM/FORCE PROTECTION. Contractor personnel, including subcontractors, must comply with and participate in the installation AT/FP Program, specifically including the conduct of

Random Antiterrorism Measures (RAM).

4.2. FREEDOM OF INFORMATION ACT PROGRAM (FOIA). The contractor shall comply with

DoD Regulation 5400.7/Air Force Supplement, AFMAN 33-302, DoD Freedom of Information Act

Program, Air Force Instruction 33-332, Air Force Privacy Program and DoD Manual 5200.01-V4 requirements. The regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

4.2.1 Privacy Act Program (PA). The contractor shall comply with DoD 5400.11, DoD Privacy Program requirements and Air Force Instruction 33-332, Air Force Privacy and Civil Liberties Program. The regulation sets mandatory guidelines for collecting, safeguarding, maintaining, using, accessing, amending and disseminating personal information kept in systems of records to comply with the Privacy Act, Title 5, United States Code (U.S.C.), Section 552a.

4.2.2. FOR OFFICIAL USE ONLY (FOUO). The contractor shall create and maintain FOUO material

IAW DoD 5400-7R, DoD Freedom of Information Act Program; AFI 33-115, Air Force Information

Technology (IT) Service Management; and AFI 33-283, Communications Security (COMSEC) Operations.

Mark all documents meeting the requirements identified in DoD Regulation 5400-7/Air Force Supplement, paragraphs C3.2.1.2 thru 3.2.1.9 as “For Official Use Only” IAW instructions identified in paragraph C4.2.1.

Safeguard all sensitive data IAW DoD Regulation 5400.7/Air Force Supplement, paragraph C4.4. When documents containing FOUO material are authorized for destruction, shred the records in an approved shredder fit for the classification. Degauss or overwrite magnetic tapes or other magnetic media.

4.2.3. Records Management-Reserved

4.3. OPERATING INSTRUCTIONS. Adhere to the Air Force activity Operating Instruction (OI) for internal circulation control, protection of resources and to regulate entry into Air Force controlled areas during normal, simulated and actual emergency operations.

4.4. KEY CONTROL-Reserved

4.5. TRAFFIC LAWS. Contractor and its employees shall comply with base traffic regulations for all vehicles they drive on base. For example, while on TAFB you MUST use hands-free devices while driving.

No texting or manipulating a phone while driving is permitted.

4.6. HOURS OF OPERATION. The normal duty hours shall be Monday through Friday 0730 to 1630 hours. However, to avoid excess wait times at the commercial gate, contractor can start services at an earlier time. Coordinate arrival times with COR during monthly scheduling.

4.7. FEDERAL HOLIDAYS.

New Year’s Day - 1 January

Martin Luther King Day - 3rd Monday in January

President’s day - 3rd Monday in February

Memorial Day - last Monday in May

Independence Day - 4 July

Labor Day - 1st Monday in September

Columbus Day - 2nd Monday in October

Veteran’s Day - 11 November

Thanksgiving Day - 4th Thursday in November

Christmas Day - 25 December

4.7.1. If these holidays fall on Saturday, the preceding Friday shall be observed. If these holidays fall on

Sunday, the following Monday shall be observed. If a holiday falls on a scheduled service day, the contractor shall be responsible for rescheduling services for the first day post the holiday observance.

4.8. DOWN DAYS. These are days designated by MAJCOM or 325 FW/CC as non-working days. The government reserves the right not to allow all non-essential tasks to be performed on these days. The estimated number of down days is eight per year. The contractor shall not charge any cost for down days.

4.9. CONTRACTOR TRAINING. The government may request the contractor to attend conferences, symposiums, and training course/sessions to provide interface and attain knowledge necessary for the performance of PWS requirements.

a. Anti-Terrorism Training. The AF will provide appropriate Level 1 anti-terrorism training to contractor employees as required for mission requirements. This training shall be requested through the contracting officer or COR. (ADLS if CAC, ATO provided if no CAC access)

b. OPSEC Training. The AF will provide OPSEC specific training or training materials within 90 days of initial assignment to the contract.

c. Ancillary Training (Total Force Awareness Training). The contractor shall take all ancillary training courses that the government requires for all military and Civil Service employees (such as

Environmental Safety Training) and any specific course pertaining to a task, as required by AFI 33-

200, Air Force Cybersecurity Program Management, unit or Wing/IA office. All courses must be taken, and passed by all on-site contractor personnel.

d. New or Updated Technology Training. Training in support of new or updated technology for the mission requirements will be provided once by the AF for the initial cadre of contract employees working at the time of the upgrade or receipt of new equipment/ technology. The method, amount, and need for training will be defined by the AF. The contractor shall be responsible for training any subsequent employees.

4.10. Access to Government Systems. In accordance with DoD Directive Number 7045.14, The Planning, Programming, Budgeting and Execution (PPBE) System, contractors are not allowed access to any DoD system without explicit authorization of a relevant government official, and that is based on a need-to-know basis only. Individuals getting access must have the appropriate clearance for access to a particular system.

4.11. GOVERNMENT-OWNED VEHICLES-Reserved

4.10. PUBLICATIONS. Can be accessed on-line at http://www.e-publishing.af.mil/. Supplements or amendments to listed publication from any organizational level may be issued during the life of the contract.

The contractor shall immediately implement those changes in publications, which result in a decrease, or no change in the contract price. Prior to implementing any such revision, supplement, or amendment that will result in an increase in contract price, the contractor shall submit to the CO a price proposal and obtain prior approval. Price proposals shall be submitted within 15 calendar days from the date the contractor receives notice of the revision, supplement, or amendment giving rise to the increase in cost of performance.

Changes in the contract price due to supplements and amendments shall be considered under the FAR

52.212-4, Contract Terms and Conditions - Commercial Items clause. Failure of the contractor to submit a price proposal within 15 calendar days from the date of receipt of any change, shall entitle the government to performance in accordance with such change, at no increase in contract price.

4.11. RESUMES/QUALIFIED STAFFING-Reserved

4.12. STAFFING LEVELS-Reserved

4.13. NDAA LABOR DATA REPORTING

4.13.1. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required to comply with this Oil Water Separator contract via a secure data collection site.

4.13.2. Location of Site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

4.13.3. Reporting Period. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY). While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

4.13.4. Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

4.13.5. User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link.

However, user manuals for government personnel and contractors are available at the

Army CMRA link at http://www.ecmra.mil.

4.14. QUALITY CONTROL. The contractor shall develop and maintain a quality control program to ensure contract services are performed IAW established required service standards addressed in the Services

Summary (SS). The contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective contract services or performance. The contractor shall submit a Quality Control Plan

(QCP) to the CO for acceptance with their solicitation package and again 30 days after contract award to incorporate potential changes. The contractor shall establish and maintain a complete QCP for the performance of this contract. This plan shall be broad enough to address quality control of all aspects of contractor performance. At a minimum, the plan shall include: responsibility for surveillance of work by any subcontractors and in-house quality control inspectors, process for acceptance, rejection, documentation and resolution of deficiencies for work, for work performed by contractor work force or subcontractors, trend analysis, corrective action to identify poor performance by any contractor work staff, and the plan to interface with Government inspectors who maintain the overarching Quality Control Program for each facility. Proposed changes to the plan must have contracting officer and COR acceptance. A copy of all

Government quality inspection checklists will be provided to the contractor for inclusion in their QCP. The contractor shall ensure that all deficiency responses include corrective actions to all items found. Provide a copy to COR/contracting officer within 24 hours.

4.14.1. The contractor shall maintain records of all audits and inspections. The QC records shall indicate the nature and number of observations made, the number and type of deficiencies found, and the nature of corrective action taken, as appropriate.

4.15. QUALITY ASSURANCE. The government will evaluate the contractor’s performance to ensure services meet contract requirements When a performance threshold has not been met or contractor performance has not been accomplished, Contracting Officer’s Representative (COR) will initiate and http://www.ecmra.mil/ http://www.ecmra.mil/ provide the Contracting Officer (CO) a corrective action report (CAR) for issuance to the contractor. The contractor shall respond to the CAR IAW instructions provided and return it to the CO within 10 calendar days of receipt.

4.15.1. MULTI-FUNCTIONAL TEAM MEETINGS. The Program Manager and the Contractor may be required to meet with the CO, contract administrator, COR, and other government personnel as deemed necessary, at least annually. The Contractor may request a meeting with the CO when the Contractor believes such a meeting is necessary. If the CO or contract administrator deems necessary, written minutes of any such meetings shall be recorded in the contract file and signed by the project manager and the CO or contract administrator. If the Contractor does not concur with any portion of the minutes, such nonoccurrence shall be provided in writing to the CO within ten (10) calendar days following receipt of the minutes.

4.15.2. PRE-PERFORMANCE CONFERENCE. Offerors/bidders are hereby advised that if they are awarded a contract as a result of this solicitation, they shall be required to appear at the pre-performance conference at a date and time to be determined by the Contracting Officer prior to any work on Tyndall AFB, Florida. Contractor shall provide key points of contact.

5. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL

COMMAND AUTHORITY. Services will be performed as directed by the CO.

6. ENVIRONMENTAL REQUIREMENTS.

6.1. ENVIRONMENTAL LAWS AND REGULATIONS COMPLIANCE. The Contractor shall be knowledgeable of and comply with all applicable federal, state, and local laws and permits, and DOD, Air

Force, Major Command (MAJCOM), and Tyndall AFB environmental regulations, policies, and guidance.

The Contractor shall establish policies and procedures to protect the health and safety of personnel using, living, or working on properties under the jurisdiction of Tyndall AFB and minimize or eliminate risks of environmental pollution. Contractor facilities and operations are subject to environmental compliance inspections without notice.

6.2. ENVIRONMENTAL SPILL PROCEDURES. The Contractor will report and manage releases/spills of hazardous materials in accordance with applicable federal, state, and local laws and the Tyndall AFB

Hazardous Material Emergency Planning and Response Plan (HAZMAT plan). The Contractor shall be responsible for cleanup and all costs associated with any spills from its operations and equipment. The

Contractor shall immediately notify the COR(283-3074) and the installation environmental office (283-

2398/2493) of any spills in order to assure that spills are properly cleaned up and disposed of. Copies of all manifests and/or shipping papers shall be provided to the government for approval prior to removing wastes from Tyndall AFB.

6.3. HAZARDAOUS WASTE/MATERIAL MANAGEMENT. The Contractor shall manage the collection and disposal of hazardous wastes the Contractor generates on Tyndall AFB properties in accordance with applicable federal, state, and local laws and the Tyndall AFB Hazardous Waste

Management Plan. The Contractor shall be responsible for the proper disposal and costs of proper disposal in accordance with 40 CFR 261-279. Copies of all manifests and/or shipping papers shall be provided to the government for approval and signature by the 325 CES/CEIE, prior to removing wastes from Tyndall AFB.

The Contractor shall obtain an EPA ID number from Tyndall AFB as a generator of hazardous waste. FDEP also requires transporters of used oils to obtain a permit to transport Florida Administrative Code, Chapter

62-710, Used Oil Management. The Contractor shall provide training to its employees in accordance with 40

CFR 265.16, in the proper management of hazardous waste and special wastes. The Contractor shall provide the government with a copy of its action plan on how hazardous wastes and materials will be managed and how training will be provided to its employees. Hazardous waste and used oil storage areas will be approved by the 325 CES/CEIE and will be inspected without notice. Deficiencies identified will be corrected within twenty-four (24) hours after being notified.

6.4. ENVIRONMENTAL POLLUTION PREVENTION. The Contractor shall perform all work so as to minimize environmental pollution or degradation of the environment or natural/cultural resources. When refueling equipment or performing maintenance on equipment, the contractor shall ensure such operations are conducted on an impervious surface (e.g. concrete pad) to prevent soil contamination in the event of a spill. Any storage tank placed on site for refueling equipment should comply with Florida Administrative

Code, Chapter 62-761. Open burning or burial of materials on base properties is prohibited.

6.5 . ENVIRONMENTAL MANAGEMENT SYSTEM - The following is a standard EMS awareness clause that is included in all contracts issued by the Base:

6.5.1. TAFB has implemented an Environmental Management System (EMS), which is based on ISO-

14001, and is concerned about environmental issues. TAFB desires to conduct its business operations in an environmentally sound manner. Relevant significant aspects will be communicated to contractors (including those used for outsourcing) and suppliers through the bid package where applicable. TAFB expects its suppliers and contractors to provide, at the same quality and price, products and services that have the least environmental consequence of all available options.

6.5.2. Wherever possible, where a supplier's product is causing a significant environmental aspect at TAFB, TAFB will communicate to that supplier that they should select the available option that minimizes the potential environmental impact of that product. Any contractor with plans to be working six months or longer at TAFB must receive EMS awareness training and information on operational controls where applicable. This training is thirty minutes in duration and will be provided by TAFB. A copy of the TAFB

Environmental Policy can be viewed on the Public Website via the Internet.

6.6. SAFETY. The Contractor shall comply with all federal Occupational Safety and Health Act (OSHA) requirements and standards as published in the 29 Code of Federal Regulations (CFR). Additionally, the

Contractor will comply with Air Force Occupational Safety and Health (AFOSH) standards, along with installation safety and health requirements. The CO, COR, Base Civil Engineer or designated representative, ground safety and security police may issue an order to the Contractor or employees to stop all or part of the

Contractor’s work until all violations are corrected. Bioenvironmental engineering personnel, who notice violation of OSHA, AFOSH, or local standards, will notify the COR who has the authority to stop all or part of the Contractor’s work. No part of the time lost during a stop work order shall be allowed to be the subject of a claim by the Contractor for time and money compensation. Contractor shall not be excused from.

unsatisfactory performance that may result from a stop work order.

6.7. SPECIAL QUALIFICATIONS. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements in maintenance of oil/water separators and grease traps.

6.8. CONTRACTOR QUALIFICATION. The contractor must specialize in handling waste petroleum products, be registered with the Environmental Protection Agency (EPA) and the State of Florida, have the necessary licenses and permits to transport petroleum wastes and shall have a Florida identification number.

The contractor shall be in compliance with Florida Administrative Code (FAC) 62-710 applicable to waste oil transporters, collection facilities, and marketers.

7.0. APPENDICES

A-1 thru A-6: Workload Data

B: Acronyms and Definitions

C: Publications and Forms

APPENDIX A-1

WORKLOAD DATA FOR OIL/WATER SEPARATORS

FACILITY

NUMBER

FACILITY DESCRIPTION SEPARATOR

CAPACITY

(GALLONS)

FREQUENCY

(INCLUDES

TOTAL

CLEANOUT)

ANNUAL

TOTAL

CLEAN

OUT

83 AIRCRAFT WASHRACK 14,000 MONTHLY 1

256A SUBSCALE DRONE

WASHRACK

500 2x/YEAR 1

258A TIRE SHOP 200 2x/YEAR 1

258B ENGINE SHOP 200 2x/YEAR 1

267 AGE WASHRACK 1 250 MONTHLY 1

323 JET ENGINE TEST CELL 1 2,000 4x/YEAR 1

325 JET ENGINE TEST CELL 2 400 4x/YEAR 1

408 FUEL TRUCK WASHRACK 2,500 2x/YEAR 1

413 STORAGE (400 area) 12,000 MONTHLY 1

571 VEHICLE MAINT.

WASHRACK

250 4x/YEAR 1

928 MWR CARWASH 128 3x/YEAR 1

1134 CEMIRT MAINT 300 6x/YEAR 1

5025 DRONE RECOVERY 1,500 4x/YEAR 1

6025 CIVIL ENGINEER WASH

RACK

1,000 MONTHLY 1

9443 SILVER FLAG 600-800 4xYEAR 1

OIL/WATER SEPARATOR FREQUENCY

BLDG# Per Year

Oct Nov Dec Jan Feb Mar Apr May Jun July Aug Sept/Annual clean out

83 12 1 1 1 1 1 1 1 1 1 1 1 1

256A 2 1 1

258A 2 1 1

258B 2 1 1

AGE

12 1 1 1 1 1 1 1 1 1 1 1 1

323 4 1 1 1 1

325 4 1 1 1 1

408 2 1 1

413 12 1 1 1 1 1 1 1 1 1 1 1 1

571 4 1 1 1 1

928 3 1 1 1

1134 6 1 1 1 1 1 1

5025 4 1 1 1 1

6025 12 1 1 1 1 1 1 1 1 1 1 1 1

9443 4 1 1 1 1

APPENDIX A-2

WORKLOAD DATA FOR WASHRACK STORAGE TANKS

FACILITY DESCRIPTION

TANK CAPACITY

(GALLONS)

FREQUENCY

41 NORTHSIDE AIRFIELD

DRONE WASHRACK

3000 4X YEAR

256B SUBSCALE DRONE

WASHRACK

500 MONTHLY

9310 FULL SCALE DRONE

WASHRACK

3500 MONTHLY

APPENDIX A-3

WORKLOAD DATA FOR GREASE TRAPS

B208 Raptor Quick-turn 2x YEAR

B950 Base Exchange 4x YEAR

B960 Burger King 12x YEAR

B1454 Heritage Club 4x YEAR

B1550 #1 Horizon’s Oasis Sports Bar 6x YEAR

B1550 #2 Horizon’s Large Kitchen 12x YEAR

B1690 Dining Facility 12x YEAR

B2699 Beacon Beach Yacht Club 12x YEAR

B9400 Silver Flag Dining Facility 6x YEAR

GREASE TRAPS FREQUENCY

Grease Traps

Per Year

Oct Nov Dec Jan Feb Mar Apr May Jun July Aug Sept

208 2 1 1

950 4 1 1 1 1

960 12 1 1 1 1 1 1 1 1 1 1 1 1

1454 4 1 1 1 1

#1

6 1 1 1 1 1 1

#2

12 1 1 1 1 1 1 1 1 1 1 1 1

1690 12 1 1 1 1 1 1 1 1 1 1 1 1

2699 12 1 1 1 1 1 1 1 1 1 1 1 1

9400 6 1 1 1 1 1 1

APPENDIX A-4

WORKLOAD DATA FOR SEDIMENT / SAND TRAPS

TRAP SIZE

( IN FEET)

83 Aircraft wash rack-3 traps 4 X 2 X 4 4X2X4 4 X 2 X 4

1X year

408 Fuels area wash rack-

2 traps

3 X 4 X 3 3 X 4 X 2

1X year

571 Transportation-2 traps 2 X 41 1 X 50

1X year

928 MWR wash rack-3 traps 4 X 4 X 4 4 X 4 X 4 4 X 4 X 4

1X year

1134 CEMIRT 2 X 2 X 3 3X year Jan April August

6025 Heavy equipment wash rack-2 traps

4 X 3 X 14 4 X 3 X 29

2X year January and August

APPENDIX A-5

WORKLOAD DATA FOR FINAL LIFT STATION AND SEDIMENT CHAMBER

DIMENSIONS

1722 Final Lift Station / Wet Well 20’ W X 10’H (Sediment will never fill this entire area.)

2X year

1750 Contact Chamber /

Sediment Sand Trap-

Sand/Grit

6 chambers at 39’ L X 3’ W

4X year. Once per quarter

1750 Contact Chamber /

Sediment Trap-

Scum/Septic like material from surface

6 chambers at 39’ L X 3’ W

12X year. Once per month

APPENDIX A-6

WORKLOAD DATA FOR UNDERGROUND FUEL STORAGE SECONDARY CONTAINMENT

DIMENSIONS

970 Main AAFES Shoppette 3 each secondary containment systems.

200 gallons each-total of 600 gallons

As required

3350 Felix Lake Shoppette 4 each secondary containment systems.

200 gallons each-total of 600 gallons

As required

APPENDIX B - Acronyms and Definitions.

PWS Performance Work Statement

AFI Air Force Instruction

QASP Quality Assurance Surveillance Plan

CA Contracting Administrator

CO Contracting Officer

COR Contracting Officer Representative

CM Contract Manager

OWS Oil Water Separator

FY Fiscal Year

TCLP Toxicity Characteristic Leaching Procedure

RCI Reactivity Corrosivity Ignitability

APPENDIX C – Publications and Forms

PUBLICATION TITLE

Air Force Instruction 32-7086 Hazardous Materials Management

Air Force Instruction 32-7042 Waste Management

Air Force Instruction 32-7064 Integrated Natural Resources Management

Department of Defense 5200.2-R Personnel Security Program

DoD Regulation 5400.7 DoD Freedom of Information Act Program

DoD Regulation 5400.11 DoD Privacy Program

DoD 5200.01 Volumes 1 - 4 Information Security Program

Air Force Form 332 Base Civil Engineer Work Request

Air Force Instruction 10-701 Operations Security

Air Force Instruction 16-1404 Air Force Information Security Program

Air Force Instruction 16-1406 Air Force Industrial Security Program

Air Force Instruction 31-101 Installation Security Program

Air Force Instruction 33-115 Air Force Information Technology (IT) Service

Management

Air Force Instruction 33-200 Air Force Cybersecurity Program Management

Air Force Instruction 33-283 Communication Security (COMSEC) Operations

Air Force Instruction 33-332 Air Force Privacy and Civil Liberties Program

Air Force Instruction 33-364 Records Disposition – Procedures and Responsibilities

Air Force Instruction 31-501 Personnel Security Program Management

Air Force Manual 33-152 User Responsibilities and Guidance for Information

Systems

Air Force Manual 33-153 Information Technology Asset Management

Air Force Manual 33-282 Computer Security (COMPUSEC)

Air Force Manual 33-285 Cybersecurity Workforce Improvement Program

Air Force Manual 33-363 Management of Records

Air Force Policy Directive 31-4 Information Security

Air Force Policy Directive 31-6 Industrial Security

Air Force Instruction 91-101 USAF Traffic Safety Program

Para 7, 8, 12, 13, 14 & 20

DOD 5200.1R Information Security

Air Force Instruction 31-401, Chapter 8 Program Regulation

Air Force Instruction 31-209 Air Force Physical Security Program

AFOSH 91-56 Fire Protection/Prevention Change 1 and 2

Chapter 62-761 Florida Administrative Code

Title 40 CFR 260-282 Hazardous Waste

Title 40 CFR Parts 104-149 Water Programs

Title 40 CFR Part 401-471, Effluent Guidelines and Standards

Title 40 CFR Subpart F Releases from Solid Waste Management Units

Resource Conservation and Recovery Act Subtitle C

Hazardous Waste Management (as amended by the Hazardous and Solid Waste amendments of 1984).”

Oil Pollution Act of 1990 Section 1001

The Clean Water Act, Title 3 Standards and Enforcement

Title 4 Permits and Licenses

File details come from the government source that posted it. Updated .