2 VII

98 KB Posted

Attached to
Packing and Crating
Solicitation number
FA481908R0006
Issued by

About this file

Attachment 2.VII UPDATED please note the changes on page 1 bidder instructions page 2 MADC and changes to estimated quantities pages 3-75.

Text of this file

ATTACHMENT G3

PRICING SCHEDULE/ ESTIMATED QUANTITIES

SCHEDULE

DAILY CAPABILITIES

(a) Definitions.

(1) Government’s estimated maximum daily requirements. The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State and local holidays the bidder must agree to be able to service on any single workday

(2) Government’s minimum acceptable daily capability (MADC). The minimum weight of shipments, for each type of service and area of performance, the bidder must agree to be able to service on any single workday. This figure is based on anticipated peak demand and does not represent the daily average. For outbound service (Schedule I) and Intra City/Intra Area (Schedule III) this figure shall include the total weight of shipments scheduled by the Joint Personal Property Shipping Office San Antonio (JPPSO-SAT) for pickup that day, without regard to the weight of other shipments being packed but not picked up that same day.

(3) Bidder’s guaranteed daily capability. The maximum weight of shipments, for each type of service and area of performance, the bidder agrees to be bound to service any single workday. The contractor may, at their option, agree to service a greater amount upon request, but shall not be obligated to do so.

(b) Instructions to Bidders. In order to be considered for this contract bidders are required to complete the blanks labeled “Bidder’s guaranteed daily capability” on page 2 and the unit and total price line on page 3 through 75.

(c) Bid Items. Labor charges are included in the complete service of a bid item ordered and not paid as an additional cost. Bid items are inclusive and are a single factor bid price for all normal services performed under this contract. Services such as stair carry, long carry, or elevator charges are considered normal services. Extra pickup/delivery, carry of piano/organs, disassembly/assembly of wall units, or other services where a third party provider is required and approved may be considered as additional or above normal services. The quantities shown below for each item in this solicitation are the Government’s estimate of requirements which may be ordered during the period of the contract. Bidders must complete the “Bidder’s Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum acceptable daily capability (MADC), for all items within an area of performance for which they submit bids. Failure to do so will render the bid nonresponsive. Bidders not wishing to be considered for certain types of service (Schedules) or area of performance shall insert the words “no bid” in the corresponding blanks.

PART I - THE SCHEDULE

SUPPLIES OR SERVICE AND PRICES/COSTS

ESTIMATED QUANTITIES

The quantities shown by area of performance for each item in this Solicitation are the Government’s estimates of requirements, which may be ordered during the period of the contract.

The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Bidders must complete the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to do so will render the bid non responsive.

Government’s Estimated Maximum Daily Requirement
Government’s Minimum Acceptable Daily Capability
Bidder’s Guaranteed Daily Capability

OUTBOUND

(Schedule I) Area

250 NCWT
200 NCWT
_____NCWT

INBOUND

(Schedule II) Area

250 NCWT
200 NCWT
_____NCWT

INTRA-CITY AREA

(Schedule III) Area

300 NCWT
300 NCWT
_____NCWT

*NCWT 210 applies to pickup date only. This does not include pack date.

Area of Performance: The primary area of performance is defined as Bay and Gulf Counties. Drayage service to Gadsen, Leon, Liberty, Wakulla, Franklin, Calhoun, Washington and Jackson Counties is provided by Item 12 for Schedule I, Item 27 for Schedule II and Item 33 for Schedule III.

BIDDING SCHEDULE

SCHEDULE I - OUTBOUND SERVICES

(BASE YEAR: 01 JAN 2009 – 31 DEC 2009)

Item 0001. Complete Service - Outbound (HHG). Services must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, MTMC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.

Estimated Annual Quantity

Unit

Price

Total

AA. At member/employee residence:
Container, Commercial Spec
ASTM-D4169-01, or MTMC
Pamphlet 55-12
10
NCWT
_____
_____
AB. At contractor’s facility:
Container, Commercial Spec
ASTM-D4169-01, or MTMC
Pamphlet 55-12
5
NCWT
_____
_____

Item 0002. Outbound (HHG From Nontemporary Storage). Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility; and (c) premove survey, servicing of appliances, preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item 0003.

Estimated

AA. Pickup by contractor:
Container, Commercial Spec
ASTM-D4169-01, or MTMC
Pamphlet 55-12
10
NCWT
_____
_____
AB. Delivered to contractor:
Container, Commercial Spec
ASTM-D4169-01, or
MTMC Pamphlet 55-12
5
NCWT
_____
_____

Item 0003. Complete Service-Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or MTMC Pamphlet 55-12). Service must be the same as Item 0001 or Item 0002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW FED SPEC PPP-B-601H, Style A or B. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 0003 includes container plus weight of its contents.

Estimated

AA. Government-Furnished Containers:
Overseas Pack Overflow Articles
20
NCWT
_____
_____
AB. Government-Furnished Containers:
Overseas Pack Oversize Articles
10
NCWT
_____
_____
AC. Government-Furnished Containers:
Overseas Pack Other Shipments
30
NCWT
_____
_____
AD. Government-Furnished Containers:
Domestic Pack: Overflow Articles
20
NCWT
_____
_____
AE. Government-Furnished Containers:
Domestic Pack: Oversize Articles
10
NCWT
_____
_____
AF. Government-Furnished Containers:
Domestic Pack: Other Shipments
10
NCWT
_____
_____
AG. Contractor-Furnished Containers:
Overseas Pack: Overflow Articles
20
NCWT
_____
_____
AH. Contractor-Furnished Containers:
Overseas Pack: Oversize Articles
10
NCWT
_____
_____
AJ. Contractor-Furnished Containers:
Overseas Pack: Other Shipments
30
NCWT
_____
_____
AK. Domestic Pack: Overflow Articles
20
NCWT
_____
_____
AL. Domestic Pack: Oversize Articles
10
NCWT
_____
_____
AM. Domestic Pack: Other Shipments
30
NCWT
_____
_____

Item 0004. Complete Service-Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering Officer.)

Estimated

AA. Government-Furnished Containers:
Drayage Included
3
NCWT
_____
_____
AB. Government-Furnished Containers:
Drayage Not Included
10
NCWT
_____
_____
AC. Contractor-Furnished Containers:
Drayage Included
5
NCWT
_____
_____
AD. Contractor-Furnished Containers:
Drayage Not Included
350
NCWT
_____
_____

Item 0005. Complete Service-Outbound (Unaccompanied Baggage from Nontemporary Storage). Service must be the same as Item 0004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.

Estimated

AA. Government-Furnished Containers:
Drayage Included
3
NCWT
_____
_____
AB. Government-Furnished Containers:
Drayage Not Included
10
NCWT
_____
_____
AC. Contractor-Furnished Containers:
Drayage Included
3
NCWT
_____
_____
AD. Contractor-Furnished Containers:
Drayage Not Included
10
NCWT
_____
_____

Item 0006. Outbound Service-Unaccompanied Baggage Packed by Member/Employee. Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include containerization in outer shipping containers as ordered by the contracting officer.

Estimated

AA. Containerization Not Required:
Drayage Included
3
GCWT
_____
_____
AB. Containerization Not Required:
Drayage Not Included
5
GCWT
_____
_____
AC. Containerization Required:
Drayage Included
3
NCWT
_____
_____
AD. Containerization Required:
Drayage Not Included
5
NCWT
_____
_____

Item 0007. Outbound Service-Unaccompanied Baggage Packed By Member/Employee-Consolidated Shipments/Government Facility. Service must be the same as Item 0006 above except that service must include two or more shipments picked up from a Government office, warehouse, or facility.

Estimated

AA. Containerization Not Required:
Drayage Included
3
GCWT
_____
_____
AB. Containerization Required:
Drayage Included
10
NCWT
_____
_____

Item 0008. Expensive and Valuable Items. Service must include inventorying each item, packing in Government-approved, contractor-furnished container(s), marking, banding, and cubing at member’s/employee’s residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at member’s/employee’s residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.

Estimated

AA. Drayage Included
3
NCWT
_____
_____
AB. Drayage Not Included
3
NCWT
_____
_____

Item 0009. Storage. Storage of containerized articles must be furnished when ordered by the contracting officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt of notification of completion of containerization service. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

Estimated

5
NCWT
_____
_____

Item 0010. Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from the MTMC Pamphlet 55-12 is ordered, the order will indicate the MTMC approval number.

Estimated

AA. Container (ASTM-D4169-01)
5
ea
_____
_____
AB. Container (MTMC Pamphlet 55-12)
5
ea
_____
_____
AC. Crate (ASTM-D6039/D6039M-96)
5
cu ft or fraction thereof
_____
_____

Item 0011. Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for reconsignment, and loading on the hauling carrier’s vehicle

Estimated

10
ea
_____
_____

AB. Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or cost of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, nails and bands must be accomplished at no expense to the Government.

Estimated

10
ea
_____
_____

AC. Assembly/Disassembly of Government-Owned Containers. Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

Estimated

AD. Assembly
10
each
_____
_____
AE. Disassembly
10
each
_____
_____

Item 0012. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 120 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance.

Estimated

AA. Household goods
loaded mile
1000
per
_____
_____
AB. Unaccompanied baggage
1000
per
_____
_____

Item 0013. Attempted Pickup. When the initial attempt to pickup a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.

Estimated

AA. Household goods
5
_____
ea shpmt
_____
AB. Unaccompanied baggage
5
_____
ea shpmt
_____

NOTE: All Above Items are included in the evaluation of bids Item 0014. Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or MTMC, in effect at the time of the order.

RECAPITULATION SCHEDULE I

(Base Year) Schedule Total – Items 0001 thru 0014 Estimated $_______________

SCHEDULE II

INBOUND SERVICES

(BASE: 01 JAN 2009 – 31 DEC 2009)

Item 0015. Complete Service-Inbound (HHG). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.

Estimated

Unit Total

600
NCWT
_____
_____

Item 0016. Complete Service Inbound (HHG). Service must be same as Item 0015 above except that drayage of shipment to residence is not required.

Estimated

25
NCWT
_____
_____

Item 0017. Complete Service Inbound (HHG). Service must be the same as Item 0015 above except removal of items from outer container will be at the contractor’s facility and articles will be drayed to member’s/employee’s residence.

Estimated

25
NCWT
_____
_____

Item 0018. Inbound Service-Contractor Facility (HHG). Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.

Estimated

25
NCWT
_____
_____

Item 0019. Complete Service-Expensive and Valuable Items. Services must include drayage from the storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence.

Estimated

AA. Drayage Included

3
NCWT
_____
_____
AB. Drayage Not Included
3
NCWT
_____
_____

Item 0020. Complete Service-Inbound (Unaccompanied Baggage). Service must include drayage from contractor’s facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to member’s/employee’s residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.

Estimated

1,000
NCWT
_____
_____

Item 0021. Complete Service-Inbound (Unaccompanied Baggage). Service must be same as Item 0020 except that drayage to residence is not required.

Estimated

5
NCWT
_____
_____

Item 0022. Inbound Service - Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 0020 except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor’s facility.

Estimated

20
NCWT
_____
_____

Item 0023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth workday following date of contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

Estimated

1,250
NCWT
_____
_____

Item 0024. Remarking, Coopering, and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.

Estimated

25
ea piece
_____
_____

AB. Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or costs of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding must be accomplished at no expense to the Government.

Estimated

5
ea piece
_____
_____

AC. Assembly/Disassembly of Government-Owned Containers. Contractor will assemble Government-owned containers. The Government will furnish component parts. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

Estimated

AD. Assembly
10
each
_____
_____
AE. Disassembly
10
each
_____
_____

Item 0025. Attempted Delivery. When the initial attempt to deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.

Estimated

AA. Household Goods
5
ea shpmt
_____
_____
AB. Unaccompanied Baggage
5
ea shpmt
_____
_____

Item 0026. Reweighing. Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.

Estimated

AA. Household Goods
12
ea shpmt
_____
_____
AB. Unaccompanied Baggage
12
ea shpmt
_____
_____

Item 0027. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 120 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance

Estimated

AA. Household Goods
loaded mile
2,000
per
_____
_____
AB. Unaccompanied baggage
loaded mile
2,000
per
_____
_____

Item 0028. Partial Withdrawal. Service must be the same as Items 0015, 0016, 0020, or 0021, except a partial removal of the items from the outer container will be performed at the contractor’s facility. Articles not removed from the shipment will remain at the contractor’s facility.

Estimated

AA. Household Goods
Drayage included
25
NCWT
_____
_____
AB. Household Goods
Drayage not included
10
NCWT
_____
_____
AC. Unaccompanied Baggage
Drayage included
25
NCWT
_____
_____
AD. Unaccompanied Baggage
Drayage not included
25
NCWT
_____
_____

Item 0029. Reserved (see additional services).

Item 0030. Reserved (see additional services).

NOTE: All above Items are included in the evaluation of bids

RECAPITULATION SCHEDULE II

(Base Year) Schedule Total – Items 00015 thru 0030 Estimated $_______________

SCHEDULE III

INTRA-CITY AND INTRA-AREA MOVES

(Base 01 JAN 2009 – 31 DEC 2009) Item 0031. Complete Service for Intra-City and Intra-Area Moves. Service must include a premove survey, servicing of appliances, packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials from residence.

Estimated

4,500
NCWT
_____
_____

Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence.

Estimated

Price

Unit Total

AA. Attempted Pickup
3
ea shpmt
_____
_____
AB. Attempted Delivery
3
ea shpmt
_____
_____

Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 120 miles. Mileage must be computed on the shortest highway distance commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.

Estimated

400
Per loaded mile
_____
_____

NOTE: All above Items are included in the evaluation of bids.

RECAPITULATION SCHEDULE III

(Base Year) Schedule Total-Items 0031 thru 0033 Estimated $_______________

BIDDING SCHEDULE

SCHEDULE I - OUTBOUND SERVICES

(OPTION YEAR ONE: 01 JAN 2010 – 31 DEC 2010)

Item 1001. Complete Service - Outbound (HHG). Services must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, MTMC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 1003.

Estimated

AA. At member/employee residence:
Container, Commercial Spec
ASTM-D4169-01, or MTMC
Pamphlet 55-12
20
NCWT
_____
_____
AB. At contractor’s facility:
Container, Commercial Spec
ASTM-D4169-01, or MTMC
Pamphlet 55-12
10
NCWT
_____
_____

Item 1002. Outbound (HHG From Nontemporary Storage). Service must be the same as Item 1001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility; and (c) premove survey, servicing of appliances, preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item 1003.

Estimated

AA. Pickup by contractor:
Container, Commercial Spec
ASTM-D4169-01, or MTMC
Pamphlet 55-12
20
NCWT
_____
_____
AB. Delivered to contractor:
Container, Commercial Spec
ASTM-D4169-01, or
MTMC Pamphlet 55-12
10
NCWT
_____
_____

Item 1003. Complete Service-Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or MTMC Pamphlet 55-12). Service must be the same as Item 1001 or Item 1002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW FED SPEC PPP-B-601H, Style A or B. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 1003 includes container plus weight of its contents.

Estimated

AA. Government-Furnished Containers:
Overseas Pack Overflow Articles
40
NCWT
_____
_____
AB. Government-Furnished Containers:
Overseas Pack Oversize Articles
20
NCWT
_____
_____
AC. Government-Furnished Containers:
Overseas Pack Other Shipments
60
NCWT
_____
_____
AD. Government-Furnished Containers:
Domestic Pack: Overflow Articles
40
NCWT
_____
_____
AE. Government-Furnished Containers:
Domestic Pack: Oversize Articles
20
NCWT
_____
_____
AF. Government-Furnished Containers:
Domestic Pack: Other Shipments
20
NCWT
_____
_____
AG. Contractor-Furnished Containers:
Overseas Pack: Overflow Articles
40
NCWT
_____
_____
AH. Contractor-Furnished Containers:
Overseas Pack: Oversize Articles
20
NCWT
_____
_____
AJ. Contractor-Furnished Containers:
Overseas Pack: Other Shipments
60
NCWT
_____
_____
AK. Domestic Pack: Overflow Articles
40
NCWT
_____
_____
AL. Domestic Pack: Oversize Articles
20
NCWT
_____
_____
AM. Domestic Pack: Other Shipments
60
NCWT
_____
_____

Item 1004. Complete Service-Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering Officer.)

Estimated

Price

Total

AA. Government-Furnished Containers:
Drayage Included
5
NCWT
_____
_____
AB. Government-Furnished Containers:
Drayage Not Included
20
NCWT
_____
_____
AC. Contractor-Furnished Containers:
Drayage Included
10
NCWT
_____
_____
AD. Contractor-Furnished Containers:
Drayage Not Included
700
NCWT
_____
_____

Iem 1005. Complete Service-Outbound (Unaccompanied Baggage from Nontemporary Storage). Service must be the same as Item 1004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.

Estimated

AA. Government-Furnished Containers:
Drayage Included
5
NCWT
_____
_____
AB. Government-Furnished Containers:
Drayage Not Included
20
NCWT
_____
_____
AC. Contractor-Furnished Containers:
Drayage Included
5
NCWT
_____
_____
AD. Contractor-Furnished Containers:
Drayage Not Included
20
NCWT
_____
_____

Item 1006. Outbound Service-Unaccompanied Baggage Packed by Member/Employee. Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include containerization in outer shipping containers as ordered by the contracting officer.

Estimated

AA. Containerization Not Required:
Drayage Included
5
GCWT
_____
_____
AB. Containerization Not Required:
Drayage Not Included
10
GCWT
_____
_____
AC. Containerization Required:
Drayage Included
5
NCWT
_____
_____
AD. Containerization Required:
Drayage Not Included
10
NCWT
_____
_____

Item 1007. Outbound Service-Unaccompanied Baggage Packed By Member/Employee-Consolidated Shipments/Government Facility. Service must be the same as Item 1006 above except that service must include two or more shipments picked up from a Government office, warehouse, or facility.

Estimated

AA. Containerization Not Required:
Drayage Included
5
GCWT
_____
_____
AB. Containerization Required:
Drayage Included
20
NCWT
_____
_____

Item 1008. Expensive and Valuable Items. Service must include inventorying each item, packing in Government-approved, contractor-furnished container(s), marking, banding, and cubing at member’s/employee’s residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at member’s/employee’s residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.

Estimated

AA. Drayage Included
5
NCWT
_____
_____
AB. Drayage Not Included
5
NCWT
_____
_____

Item 1009. Storage. Storage of containerized articles must be furnished when ordered by the contracting officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt of notification of completion of containerization service. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

Estimated

10
NCWT
_____
_____

Item 1010. Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from the MTMC Pamphlet 55-12 is ordered, the order will indicate the MTMC approval number.

Estimated

AA. Container (ASTM-D4169-01)
10
ea
_____
_____
AB. Container (MTMC Pamphlet 55-12)
10
ea
_____
_____
AC. Crate (ASTM-D6039/D6039M-96)
10
cu ft or fraction thereof
_____
_____

Item 1011. Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for reconsignment, and loading on the hauling carrier’s vehicle.

Estimated

20
ea
_____
_____

AB. Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or cost of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, nails and bands must be accomplished at no expense to the Government.

Estimated

20
ea
_____
_____

AC. Assembly/Disassembly of Government-Owned Containers. Contractor will assemble Government-owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

Estimated

AD. Assembly
20
each
_____
_____
AE. Disassembly
20
each
_____
_____

Item 1012. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 120 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance.

Estimated

AA. Household goods
loaded mile
2000
per
_____
_____
AB. Unaccompanied baggage
2000
per
_____
_____

Item 1013. Attempted Pickup. When the initial attempt to pickup a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.

Estimated

AA. Household goods
10
_____
ea shpmt
_____
AB. Unaccompanied baggage
10
_____
ea shpmt
_____

Item 1014. Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or MTMC, in effect at the time of the order.

RECAPITULATION SCHEDULE I

(Option Year One) Schedule Total – Items 1001 thru 1014 Estimated $_______________

SCHEDULE II

INBOUND SERVICES

(OPTION YEAR ONE: 01 JAN 2010 – 31 DEC 2010)

Item 1015. Complete Service-Inbound (HHG). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.

Estimated

1,200
NCWT
_____
_____

Item 1016. Complete Service Inbound (HHG). Service must be same as Item 1015 above except that drayage of shipment to residence is not required.

Estimated

50
NCWT
_____
_____

Item 1017. Complete Service Inbound (HHG). Service must be the same as Item 1015 above except removal of items from outer container will be at the contractor’s facility and articles will be drayed to member’s/employee’s residence.

Estimated

50
NCWT
_____
_____

Item 1018. Inbound Service-Contractor Facility (HHG). Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.

Estimated

50
NCWT
_____
_____

Item 1019. Complete Service-Expensive and Valuable Items. Services must include drayage from the storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence.

Estimated

AA. Drayage Included
5
NCWT
_____
_____
AB. Drayage Not Included
5
NCWT
_____
_____

Item 1020. Complete Service-Inbound (Unaccompanied Baggage). Service must include drayage from contractor’s facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to member’s/employee’s residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.

Estimated

2,000
NCWT
_____
_____

Item 1021. Complete Service-Inbound (Unaccompanied Baggage). Service must be same as Item 1020 except that drayage to residence is not required.

Estimated

10
NCWT
_____
_____

Item 1022. Inbound Service - Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 1020 except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor’s facility.

Estimated

40
NCWT
_____
_____

Item 1023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth workday following date of contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

Estimated

2,500
NCWT
_____
_____

Item 1024. Remarking, Coopering, and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.

Estimated

50
ea piece
_____
_____

AB. Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or costs of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding must be accomplished at no expense to the Government.

Estimated

10
ea piece
_____
_____

AC. Assembly/Disassembly of Government-Owned Containers. Contractor will assemble Government-owned containers. The Government will furnish component parts. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.

Estimated

AD. Assembly
20
each
_____
_____
AE. Disassembly
20
each
_____
_____

Item 1025. Attempted Delivery. When the initial attempt to deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.

Estimated

AA. Household Goods
10
ea shpmt
_____
_____
AB. Unaccompanied Baggage
10
ea shpmt
_____
_____

Item 1026. Reweighing. Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.

Estimated

AA. Household Goods
24
ea shpmt
_____
_____
AB. Unaccompanied Baggage
24
ea shpmt
_____
_____

Item 1027. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 120 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance

Estimated

AA. Household Goods
loaded mile
4,000
per
_____
_____
AB. Unaccompanied baggage
loaded mile
4,000
per
_____
_____

Item 1028. Partial Withdrawal. Service must be the same as Items 1015, 1016, 1020, or 1021, except a partial removal of the items from the outer container will be performed at the contractor’s facility. Articles not removed from the shipment will remain at the contractor’s facility.

Estimated

AA. Household Goods
Drayage included
50
NCWT
_____
_____
AB. Household Goods
Drayage not included
20
NCWT
_____
_____
AC. Unaccompanied Baggage
Drayage included
50
NCWT
_____
_____
AD. Unaccompanied Baggage
Drayage not included
50
NCWT
_____
_____

Item 1029. Reserved (see additional services).

Item 1030. Reserved (see additional services).

NOTE: All above Items are included in the evaluation of bids

RECAPITULATION SCHEDULE II

(Option Year One) Schedule Total – Items 10015 thru 1030 Estimated $_______________

SCHEDULE III

INTRA-CITY AND INTRA-AREA MOVES

(OPTION YEAR ONE: 01 JAN 2010 – 31 DEC 2010)

Item 1031. Complete Service for Intra-City and Intra-Area Moves. Service must include a premove survey, servicing of appliances, packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials from residence.

Estimated

9,000
NCWT
_____
_____

Item 1032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence.

Estimated

Price

Unit Total

AA. Attempted Pickup
5
ea shpmt
_____
_____
AB. Attempted Delivery
5
ea shpmt
_____
_____

Item 1033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed 120 miles. Mileage must be computed on the shortest highway distance commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.

Estimated

800
Per loaded mile
_____
_____

(Option Year One) Schedule Total-Items 1031 thru 1033 Estimated $_______________

(OPTION YEAR TWO: 01 JAN 2011 – 31 DEC 2011)

Item 2001. Complete Service - Outbound (HHG). Services must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, MTMC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 2003.

Estimated

AA. At member/employee residence:
Container, Commercial Spec
ASTM-D4169-01, or MTMC
Pamphlet 55-12
20
NCWT
_____
_____
AB. At contractor’s facility:
Container, Commercial Spec
ASTM-D4169-01, or MTMC
Pamphlet 55-12
10
NCWT
_____
_____

Item 2002. Outbound (HHG From Nontemporary Storage). Service must be the same as Item 2001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility; and (c) premove survey, servicing of appliances, preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item 2003.

Estimated

AA. Pickup by contractor:
Container, Commercial Spec
ASTM-D4169-01, or MTMC
Pamphlet 55-12
20
NCWT
_____
_____
AB. Delivered to contractor:
Container, Commercial Spec
ASTM-D4169-01, or
MTMC Pamphlet 55-12
10
NCWT
_____
_____

Item 2003. Complete Service-Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or MTMC Pamphlet 55-12). Service must be the same as Item 2001 or Item 2002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW FED SPEC PPP-B-601H, Style A or B. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 2003 includes container plus weight of its contents.

Estimated

AA. Government-Furnished Containers:
Overseas Pack Overflow Articles
40
NCWT
_____
_____
AB. Government-Furnished Containers:
Overseas Pack Oversize Articles
20
NCWT
_____
_____
AC. Government-Furnished Containers:
Overseas Pack Other Shipments
60
NCWT
_____
_____
AD. Government-Furnished Containers:
Domestic Pack: Overflow Articles
40
NCWT
_____
_____
AE. Government-Furnished Containers:
Domestic Pack: Oversize Articles
20
NCWT
_____
_____
AF. Government-Furnished Containers:
Domestic Pack: Other Shipments
20
NCWT
_____
_____
AG. Contractor-Furnished Containers:
Overseas Pack: Overflow Articles
40
NCWT
_____
_____
AH. Contractor-Furnished Containers:
Overseas Pack: Oversize Articles
20
NCWT
_____
_____
AJ. Contractor-Furnished Containers:
Overseas Pack: Other Shipments
60
NCWT
_____
_____
AK. Domestic Pack: Overflow Articles
40
NCWT
_____
_____
AL. Domestic Pack: Oversize Articles
20
NCWT
_____
_____
AM. Domestic Pack: Other Shipments
60
NCWT
_____
_____

Item 2004. Complete Service-Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering Officer.)

Estimated

AA. Government-Furnished Containers:
Drayage Included
5
NCWT
_____
_____
AB. Government-Furnished Containers:
Drayage Not Included
20
NCWT
_____
_____
AC. Contractor-Furnished Containers:
Drayage Included
10
NCWT
_____
_____
AD. Contractor-Furnished Containers:
Drayage Not Included
700
NCWT
_____
_____

Item 2005. Complete Service-Outbound (Unaccompanied Baggage from Nontemporary Storage). Service must be the same as Item 2004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.

Estimated

AA. Government-Furnished Containers:
Drayage Included
5
NCWT
_____
_____
AB. Government-Furnished Containers:
Drayage Not Included
20
NCWT
_____
_____
AC. Contractor-Furnished Containers:
Drayage Included
5
NCWT
_____
_____
AD. Contractor-Furnished Containers:
Drayage Not Included
20
NCWT
_____
_____

Item 2006. Outbound Service-Unaccompanied Baggage Packed by Member/Employee. Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include containerization in outer shipping containers as ordered by the contracting officer.

Estimated

AA. Containerization Not Required:
Drayage Included
5
GCWT
_____
_____
AB. Containerization Not Required:
Drayage Not Included
10
GCWT
_____
_____
AC. Containerization Required:
Drayage Included
5
NCWT
_____
_____
AD. Containerization Required:
Drayage Not Included
10
NCWT
_____
_____

Item 2007. Outbound Service-Unaccompanied Baggage Packed By Member/Employee-Consolidated Shipments/Government Facility. Service must be the same as Item 2006 above except that service must include two or more shipments picked up from a Government office, warehouse, or facility.

Estimated

AA. Containerization Not Required:
Drayage Included
5
GCWT

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
amend00001.doc DOC document
PP QUESTION.doc DOC document
2.IV.IV —
2.VII.rtf RTF text file
2.III.doc DOC document
PWS.doc DOC document
Solicitation FA4819-08-R-0010.doc DOC document
2.VI.VI —
2.II.II —
2.I.I —
2.V.V V file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .