A-02-01_Sht3.pdf

PDF 1 MB Posted

Attached to
Grounds Maintenance for MacDill AFB
Solicitation number
FA481424TF024
Issued by

About this file

This document contains plans for grounds maintenance areas at MacDill Air Force Base. The plans depict the locations of rock beds, plant beds, and other areas requiring maintenance. They are intended to provide an overview of contract work locations and support the performance work statement for an upcoming grounds maintenance contract solicitation. Key details include that the solicitation will be issued by the Department of the Air Force Air Mobility Command for grounds maintenance services at MacDill AFB. The performance work statement appendix referenced in the document likely includes additional requirement details.

View the file

Other files

File Type Posted
A-02-01_Sht2.pdf PDF
A-02-01_Sht6.pdf PDF
A-02-01_Sht1.pdf PDF
A-02-01_Sht5.pdf PDF
A-02-01_Sht4.pdf PDF
Grounds MX PWS - 28 Dec 2023 (Final).pdf PDF
24TF024 AFICC SOURCES SOUGHT -Grounds MNX 2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAIN GATE

10891

10861087

MacDill AFB Tampa, Florida

100 0 100 20050 Feet

File Name: O:\DRAWINGS\BCP\A02(Mgmt Areas)\A0201 GroundsMaintenance\2025\A-02-01_Sht3.mxd

GROUNDS MAINTENANCE CONTRACT

ROCK BEDS AND PLANT BEDS

ENLARGED PLANS

MACDILL AFB

Sheet No.

Sheet 3 of 6

A-2.1Requested By: C.M.

Drawn By: A.C.

Reviewed By: J.H.

Date: 6 Oct 23

MACDILL AIR FORCE BASE, FLORIDA

6TH CIVIL ENGINEER SQUADRON

Scale: 1" = 600'

October 2023

Legend Grounds Maintenance Areas

ROCK BED

PLANT BED

598 20

MACDILL GATE

MA

CD

ILL

AV

E

P/A

P/A HILLSBOROUGH LOOP DRP/A

P/A

P/A

P/A

HILLSBOROUGH LOOP DR

HANGAR LOOP DR

SN

OW

Y E

GR

ET

ST

P/A

ZEMKE AVE

CENTCOM AVE

SOUTH BOUNDARY BLVD

SEA SWALLOW AVE

P/A

P/A

P/A

P/A

DALE MABRY GATE

SCALE: N.T.S.

MacDill GATE

SCALE: N.T.S.

CENTCOM

SCALE: N.T.S.

BL

AC

KB

IRD

S T

P/A

P/A P/A

P/A

10371041 1033

CE FACILITY

10701

927TH AMW HQ / 6 AMW HQ

SCALE: N.T.S.

2417/19

501 B

P/A

BROWN PELICAN AVE

TAMPA POINT BLVD

2409/11

501 C

TUSKEGEE CT

FLORIDA KEYS AVE

2413/15

P/A

P/A

501 A

P/A

501 E

22495

SOCCENT

SCALE: N.T.S.

SOCOM

SCALE: N.T.S.

HANGAR LOOP DRIVE

MACHINE SHOP CT

OPERATIONS CT

P/A P/A

Hangar 3

SCALE: N.T.S.

P/A

P/A

TURNSTONE AVE

2401/03

JOHN CHAPMAN CIR

2106JOHN CHAPMAN CIR

7443 7450

P/A

FLORIDA KEYS AVE

P/A

P/A

DAVIS CONFERENCE

CENTER PARK

FAC 358

OLD FLORIDA KEYS AVE

FITNESS CENTER

SCALE: N.T.S.

VQ, DCC, And DCC Park

SCALE: N.T.S.

FIELD

HILLSBOROUGH LOOP DR

300 304

P/A

CY

PR

ES

S S

TA

ND

ST

P/A

SOCCER

P/A

P/A

NOTE: The vegetative inert beds and rock bed locations shown on this sheet indicate the approximate majority of not to scale enlarged map contract work locations. For a more detailed workload estimate information, please also refer to Appendix I of PWS.

CUI

CUI

Controlled By: USAF Controlled By: 6 CES/CL

CUI Category: CTI Distribution/Dissemination: FED ONLY

POC: Ms. Amy Doye/828-3577

File details come from the government source that posted it. Updated .