Questions and Answers Amendment 2.pdf
PDF 449 KB Posted
- Attached to
- Heat Treating Furnace Federal contract opportunity
- Solicitation number
- FA481420TF092
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis Heat Treating Furnace - Amendment 2.pdf | ||
| Questions and Answers.pdf | ||
| Attach 1 Statement of Need.pdf | ||
| Combined Synopsis Heat Treating Furnace.pdf | ||
| Attach 2 Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. What is the available floor space and overhead height of installation location?
- We have 90”L x 52”W x 119”H floor space.
2. May we plan a site visit to quote removal of existing equipment?
-Due to the rise in COVID we will not be having a site visit.
3. Is there any asbestos in the existing equipment?
-No asbestos in the existing equipment.
4. What is the minimum quench delay (seconds)?
-There is no exact minimum quench delay. An approximation in Florida would be 10 secs.
5. Clarification of Lower and Upper Chambers: Is it a 20”W x 40”D x 28”H work zone with two (2) zones of temperature control or two (2) partitioned 20x14x40 work zones?
-These are two separate chambers. The chambers will have a work area of 20” W x 14” H x
40” D each. They have their own work zones, work temperatures, and work controls.
6. Size and weight of the existing furnace? (pictures)
-The existing furnace is 71”L x 47”W x 116”H, 1200 lbs.
7. Will the existing furnace be disconnected and drained of all fluids? (this service drives up the costs because it requires two electrician event and draining fluids may have HAZMAT considerations).
-The furnace will not be disconnected but it does not contain any fluids.
8. Where is the old furnace going? (Generally we move the government property to a required
DRMO site on base. We can bid removing it to a scrap yard however it will drive up costs).
-DRMO site on base.
9. What is the path from delivery truck parking to the shop floor site? (distance, path width and height) (pictures).
-Please see the attached pictures.
10. Will there be a water source within 30 feet of the machine?
-Yes there will be a water source within 30 feet.
11. Will the government supplied electrical disconnect be within 30 feet of the installed furnace?
-Yes the electrical bus bar and drop will be within 30 feet of the machine.