Attachment_2_SOW.pdf
PDF 363 KB Posted
- Attached to
- Macdill AFB Furniture Bldg 570 Rm N215
- Solicitation number
- FA481419TF129
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA481419TF129_RFQ.pdf | ||
| Attachment_1_CLIN_Structure.pdf | ||
| FA481419TF129_RFQ.pdf | ||
| Attachment_3_Clause_List.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase and Install 10 work stations. Facility 570 MacDill AFB, FL 10 Apr 2019.
STATEMENT OF WORK
To
PURCHASE AND INSTALL 10 WORK STATIONS
IN Room S215, B570.
Prepared By
US Central Command
Headquarters Commandant
Facilities Branch
Preparer: Mr. Lancelot Grant
(813) 529-0451
Updated: 10 Apr 2019.
MacDill AFB, FL 10 Apr 2019.
1. PROPOSAL
This Request is directed by USCENTCOM Facilities Office to purchase and install systems furniture in B570 in accordance with below specifications and drawings.
2. SCOPE:
A. Contractor will furnish all labor, tools, services, materials, supplies, and equipment necessary to perform the following:
1. Teardown and dispose of 55’ of Herman Miller paneling and 2 doors in S215.
2. Purchase and install 10 each 48”x24” stackable work stations in S215. See drawing. Each station shall have 1 B/B/F pedestal, a 24” shelf below surface as a CPU holder, 1 single monitor arm and 1 LED desk lamp. The outer panels shall be about 80” high. Install 1 door as shown in drawing.
3. All electrical connections will be whips, 3 each in S215. All below surface skins shall be metal with 2 each 3” diameter holes 2” apart.
4. Figure 1 shows the current configuration. Figure 2 shows the proposed layout.
5. Color scheme will be determined after award.
6. Contractor shall verify all dimensions.
7. A site visit is required.
3. SAFETY & ENVIRONMENTAL REQUIREMENTS:
A. Emergency and Non-emergency calls: On base call 911 for emergencies only;
for Non-emergency calls to MacDill AFB Security Police call 828-3322.
B. Safety Regulations: The Contractor shall comply with all applicable Federal and State safety regulations, and requirements, including, but not limited to Occupational Safety and Health Association (OSHA), National Fire Protection Association (NFPA) and Environmental Protection Agency (EPA).
4. CLEANING: The work area shall be cleaned of all debris and clear of all construction materials at the end of each day.
5. SCHEDULING:
A. Work Performance: Work shall be performed during normal business hours:
weekdays 0730-1630 (excluding holidays).
B. Coordination: Coordination of work scheduling and escorts shall be with HQ CENTCOM Facilities Office
MacDill AFB, FL 10 Apr 2019.
6. SPECIAL SECURITY: Because work is being accomplished within a sensitive area, the contractor shall also provide additional information to be turned over to the HQ USCENTCOM Facilities Office.
A. Employee Information: The contractor shall, following award of the project, provide a list of each employee who will require access to the base, including the employees of all subcontractors. The list must include:
1. The employee name with first, last and middle name
2. Date of birth
3. Driver’s license number, OR other government issued photo identification card
4. Social Security Number issued in the same name as the photo identification card
5. Dates access required for each employee who will work within the facility
B. Contractor Vehicles: All contractors' vehicles must have current registration and proof of insurance; and the vehicle operator must have a valid driver's license. Vehicles may not remain parked at or in the vicinity of the Visitor's Reception Facility or at any MacDill Air Force gate for longer than 30 minutes.
Vehicles left unattended for more than 30 minutes are subject to being towed at the owner's expense. The Facilities Office will provide a limited number of contractor’s parking space near building 570. ALL VEHICLES ENTERING OR
ON MACDILL AFB ARE SUBJECT TO INSPECTION BY SECURITY FORCES
PERSONNEL.
C. The contractor shall be responsible for the return of all AF Form 75’s issued to any employee working on the project to the 6th Contracting Squadron/LGCM after completion of the project.
D. The Contractor shall not allow cameras or recording devices to be on the site nor photographs or recordings to be taken without the written permission of the Facility Office.
E. The use or possession of cell phones and other electronic devices is prohibited within to USCENTCOM facilities. Cell phones may be used outside of building 570 in the loading dock area.
F. The contractor shall comply with all security controls in place at the work site, to include escort requirements, access badges, and vehicle search and security clearances. The contractor shall not employ persons for work on this project if such employee(s) are identified by the Government as a potential threat to the health, safety, security, general well-being or the operational mission of the U.S. Central Command and its population.
Unclear contractor personnel shall have a Government escort and must remain at all times with provided escort to meet site access requirements.
MacDill AFB, FL 10 Apr 2019.
G. Violations of these security requirements will revoke any or all passes. The Government reserves the right to deny access to any person, with no consequence to the contract.
7. PROJECT CLOSEOUT:
A. Final Cleaning: Execute final cleaning of the site prior to final inspection.
B. Final Inspection: A Final Inspection will be held upon completion of the project.
8. WARRANTY:
One year Workmanship and Materials Warranty for the installation shall be submitted.
MacDill AFB, FL 10 Apr 2019.
File details come from the government source that posted it.