02 A-01 - FLOOR PLANS.pdf
PDF 180 KB Posted
- Attached to
- Fire Trainer Liner
- Solicitation number
- FA480926Q0065
About this file
This document is an architectural drawing set for the repair and renovation of a fire training structure (Facility 10090) at Seymour Johnson Air Force Base, North Carolina. The project is documented as "As Built" with an approval date of June 14, 2019, and is associated with Air Force contract FA4809-16-D-C003 and task order FA480917F3015.
The scope of work includes fourteen primary tasks addressing structural integrity, safety equipment, and operational improvements. Key deliverables include installation of stainless steel continuous hinges on seven doors and seven shutters; application of safety yellow enamel coating to gas piping; installation of 120 feet of stainless steel fire liner trim; replacement of corroded structural members on ventilation systems; replacement of four Hartzell exhaust fans with motor-operated modulating dampers; and installation of two 3'x5' sun shelters over digital pyrometer displays. Additional work encompasses replacing broken sprinkler mounts, rusted doors and shutters on the third floor, the Bilco hatch seal on the roof, and all safety chains with galvanized alternatives. General notes specify a full structural inspection and report, removal and installation of new fire command boards to both burn rooms (totaling 1,430 square feet), and provision of a new Watlow pyrometer system with associated equipment including optional temperature monitoring, burn crib configurations, and a debris pan. The floor plans depict the tower and annex layouts across three levels with detailed notation of equipment locations and renovation requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fire Trainer Drawings.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1245 3
H
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R
O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
C T
I T
L E
D R
A W
I N
G
S
H E
E
N
A M
E
SCALE
DATE
T H
U N
I T
D
S
A
T E
S
A
R
F
O R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
B
S
E
N
O R
R
O L I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A
P R
O J E
P
A
S E
C O
N T
R A o v:\PROJECTS\Fy-00\vkag 00-1005a\vkag 00-1005a as-built\VKAG 00-1005A A-01.dwg
T A
K
D o
W
J U
N
A
S
B
U I L
T
R E
P A
R
E
T
R A
I N
I N
G
S
T R
U C
T U
R E
F
F L O
P
L A
N S
18 SEPT 17
AS-SHOWN
CENME
VKAG 00-1005A
B
U I L
T
F A
D
C
F A
F
4'
4' 12'
1/4"=1'-0"
N
MAG. VAR. 9°-34'W
MAR '17
M
KEYNOTES:
1. SUPPLY AND INSTALL STAINLESS STEEL CONTINUOUS HINGES TO 7 DOORS AND
7 SHUTTERS.
2. SUPPLY AND INSTALL 3 HIGH TEMPERATURE RESISTANT DOOR SWEEPS TO 3
1ST FLOOR DOORS.
3. SUPPLY AND INSTALL STAINLESS STEEL FLEX HOSE FROM NITROGEN TO SMOKE
MACHINE.
4. CLEAN AND SUPPLY/APPLY SAFETY YELLOW ENAMEL COATING TO ALL GAS
PIPING.
5. SUPPLY AND INSTALL 120 FEET OF STAINLESS STEEL FIRE LINER TRIM TO ALL
DOORS AND SHUTTERS.
6. REPLACE BROKEN SPRINKLER MOUNTS.
7. REMOVE AND REPLACE RUSTED OUT DOOR ON 3RD FLOOR AND 2 RUSTED OUT
SHUTTERS ON THE 3RD FLOOR USING CONTINUOUS STAINLESS STEEL HINGES.
8. SUPPLY AND REPLACE BILCO HATCH SEAL ON ROOF AND APPLY ENAMEL TOP
COAT PAINT ON HATCH.
9. SUPPLY AND REPLACE THE CORRODED STRUCTURAL MEMBERS ON THE
EXISTING VENTILATION PROP. REMOVE THE UPPER TOE KICK TO ALLOW
LADDER HOOK OPERATIONS.
10. REPLACE ALL SAFETY CHAINS WITH NEW GALVANIZED SAFETY CHAINS AND
NEW CLIPS.
11. SUPPLY AND INSTALL HEAT DEFLECTOR SHIELDS AT 7 DOORS AND 4 SHUTTERS.
12. REPLACE 4 EXISTING HARTZELL EXHAUST FANS WITH LOUVERS &
MOTOR-OPERATED MODULATING DAMPERS (SWITCH OPERATED). SIZE
DAMPERS TO FIT EXISTING OPENINGS. REUSE ELECTRICAL CONNECTIONS
FROM EXHAUST FANS. MOUNT DAMPER SWITCHES ADJACENT TO EXHAUST FAN
CONTROL BOXES.
13. SUPPLY AND INSTALL (2) 3'X5' SUN SHELTER OVER THE DIGITAL PYROMETER
DISPLAYS AND BOXES.
14. SUPPLY AND INSTALL NEW WATLOW PYROMETERS.
GENERAL NOTES:
1. INSPECT, TEST AND PROVIDE A FULL REPORT ON
THE STRUCTURAL TRAINING FACILITY.
2. REMOVE OLD, SUPPLY AND INSTALL NEW FIRE
COMMAND BOARD TO BOTH BURN ROOMS
TOTALING 1430 SQUARE FEET WITH ADDITIONAL
OPTIONS OF (1) TEMPERATURE MONITORING
SYSTEM, (1) BURN CRIB BALE STYLE, (1) BURN
CRIB PALLET STYLE AND (1) DEBRIS PAN.
3. SUPPLY AND SHOW OPERATIONS ON MSA
CALIBRATION KIT FOR FIRE SYSTEMS.
1ST FLOOR TOWER PLAN & ANNEX
SCALE 1/4" = 1'-0"
3RD FLOOR TOWER PLAN
SCALE 1/4" = 1'-0"
2ND FLOOR TOWER PLAN & ANNEX
SCALE 1/4" = 1'-0"
5 5
6 6 6 6
TOWER & ANNEX ROOF PLANS
SCALE 1/4" = 1'-0"
11 11
11 11
12 12
14 14
14 14
1" X 4" X 1/8" GALVANIZED BAR
GRATE SURFACE (TYP)
36" WIDE
RAPPELL
OPENING
WITH SAFETY
CHAIN GATE SAFETY
CHAIN GATE
36" WIDE RAPPELL
OPENING WITH SAFETY
CHAIN GATE
30" X 36" BILCO
ACCESS HATCH
AND LADDER
JACOB'S
LADDER WITH
OSHA CAGE
GARAGE ANNEX
ROOF BELOW
30" X 36" BILCO
ACCESS HATCH
AND LADDER
BUILDING "A"
BURN ROOM #3
BUILDING "B"
BURN ROOM #1
BUILDING "A"
BURN ROOM #4
BUILDING "B"
BURN ROOM #2
BUILDING "A"
14 14 14
3'-0"
3'-0"
36" X 36"
CONFINED
SPACE
HATCH
36" X 36"
CONFINED
SPACE
HATCH
ABOVE
U P
U P
U P
D N
D N
D N
U P
D N
U P
D N
D N
36" x 48"
CHOP OUT
PANEL W/
PLYWOOD
COVER
File details come from the government source that posted it. Updated .