This document is an architectural drawing set for the repair and renovation of a fire training structure (Facility 10090) at Seymour Johnson Air Force Base, North Carolina. The project is documented as "As Built" with an approval date of June 14, 2019, and is associated with Air Force contract FA4809-16-D-C003 and task order FA480917F3015.

The scope of work includes fourteen primary tasks addressing structural integrity, safety equipment, and operational improvements. Key deliverables include installation of stainless steel continuous hinges on seven doors and seven shutters; application of safety yellow enamel coating to gas piping; installation of 120 feet of stainless steel fire liner trim; replacement of corroded structural members on ventilation systems; replacement of four Hartzell exhaust fans with motor-operated modulating dampers; and installation of two 3'x5' sun shelters over digital pyrometer displays. Additional work encompasses replacing broken sprinkler mounts, rusted doors and shutters on the third floor, the Bilco hatch seal on the roof, and all safety chains with galvanized alternatives. General notes specify a full structural inspection and report, removal and installation of new fire command boards to both burn rooms (totaling 1,430 square feet), and provision of a new Watlow pyrometer system with associated equipment including optional temperature monitoring, burn crib configurations, and a debris pan. The floor plans depict the tower and annex layouts across three levels with detailed notation of equipment locations and renovation requirements.

View the file

Other files

File Type Posted
Fire Trainer Drawings.png PNG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1245 3

H

T

R

F

U

B

T

A P

P R

V D

D A

T E

I

T

S

R

O

F

U

G

D E

S C

R I P

T I O

N R

E V

F

E

H

D

C

B

P R

O J E

C T

I T

L E

D R

A W

I N

G

S

H E

E

N

A M

E

SCALE

DATE

T H

U N

I T

D

S

A

T E

S

A

R

F

O R

C

V

I L

E

N G

I N

E E

R

S

Q U

A D

R O

N

S E

Y M

O U

R

J O

H N

S O

N

A

R

B

S

E

N

O R

R

O L I N

A

SHEET

DRAWN BY

OF

PROJECT NUMBER

245 3

DRAWING NUMBER

A

678910

G

F

E

H

D

C

B

678910

A

P R

O J E

P

A

S E

C O

N T

R A o v:\PROJECTS\Fy-00\vkag 00-1005a\vkag 00-1005a as-built\VKAG 00-1005A A-01.dwg

T A

K

D o

W

J U

N

A

S

B

U I L

T

R E

P A

R

E

T

R A

I N

I N

G

S

T R

U C

T U

R E

F

F L O

P

L A

N S

18 SEPT 17

AS-SHOWN

CENME

VKAG 00-1005A

B

U I L

T

F A

D

C

F A

F

4'

4' 12'

1/4"=1'-0"

N

MAG. VAR. 9°-34'W

MAR '17

M

KEYNOTES:

1. SUPPLY AND INSTALL STAINLESS STEEL CONTINUOUS HINGES TO 7 DOORS AND

7 SHUTTERS.

2. SUPPLY AND INSTALL 3 HIGH TEMPERATURE RESISTANT DOOR SWEEPS TO 3

1ST FLOOR DOORS.

3. SUPPLY AND INSTALL STAINLESS STEEL FLEX HOSE FROM NITROGEN TO SMOKE

MACHINE.

4. CLEAN AND SUPPLY/APPLY SAFETY YELLOW ENAMEL COATING TO ALL GAS

PIPING.

5. SUPPLY AND INSTALL 120 FEET OF STAINLESS STEEL FIRE LINER TRIM TO ALL

DOORS AND SHUTTERS.

6. REPLACE BROKEN SPRINKLER MOUNTS.

7. REMOVE AND REPLACE RUSTED OUT DOOR ON 3RD FLOOR AND 2 RUSTED OUT

SHUTTERS ON THE 3RD FLOOR USING CONTINUOUS STAINLESS STEEL HINGES.

8. SUPPLY AND REPLACE BILCO HATCH SEAL ON ROOF AND APPLY ENAMEL TOP

COAT PAINT ON HATCH.

9. SUPPLY AND REPLACE THE CORRODED STRUCTURAL MEMBERS ON THE

EXISTING VENTILATION PROP. REMOVE THE UPPER TOE KICK TO ALLOW

LADDER HOOK OPERATIONS.

10. REPLACE ALL SAFETY CHAINS WITH NEW GALVANIZED SAFETY CHAINS AND

NEW CLIPS.

11. SUPPLY AND INSTALL HEAT DEFLECTOR SHIELDS AT 7 DOORS AND 4 SHUTTERS.

12. REPLACE 4 EXISTING HARTZELL EXHAUST FANS WITH LOUVERS &

MOTOR-OPERATED MODULATING DAMPERS (SWITCH OPERATED). SIZE

DAMPERS TO FIT EXISTING OPENINGS. REUSE ELECTRICAL CONNECTIONS

FROM EXHAUST FANS. MOUNT DAMPER SWITCHES ADJACENT TO EXHAUST FAN

CONTROL BOXES.

13. SUPPLY AND INSTALL (2) 3'X5' SUN SHELTER OVER THE DIGITAL PYROMETER

DISPLAYS AND BOXES.

14. SUPPLY AND INSTALL NEW WATLOW PYROMETERS.

GENERAL NOTES:

1. INSPECT, TEST AND PROVIDE A FULL REPORT ON

THE STRUCTURAL TRAINING FACILITY.

2. REMOVE OLD, SUPPLY AND INSTALL NEW FIRE

COMMAND BOARD TO BOTH BURN ROOMS

TOTALING 1430 SQUARE FEET WITH ADDITIONAL

OPTIONS OF (1) TEMPERATURE MONITORING

SYSTEM, (1) BURN CRIB BALE STYLE, (1) BURN

CRIB PALLET STYLE AND (1) DEBRIS PAN.

3. SUPPLY AND SHOW OPERATIONS ON MSA

CALIBRATION KIT FOR FIRE SYSTEMS.

1ST FLOOR TOWER PLAN & ANNEX

SCALE 1/4" = 1'-0"

3RD FLOOR TOWER PLAN

SCALE 1/4" = 1'-0"

2ND FLOOR TOWER PLAN & ANNEX

SCALE 1/4" = 1'-0"

5 5

6 6 6 6

TOWER & ANNEX ROOF PLANS

SCALE 1/4" = 1'-0"

11 11

11 11

12 12

14 14

14 14

1" X 4" X 1/8" GALVANIZED BAR

GRATE SURFACE (TYP)

36" WIDE

RAPPELL

OPENING

WITH SAFETY

CHAIN GATE SAFETY

CHAIN GATE

36" WIDE RAPPELL

OPENING WITH SAFETY

CHAIN GATE

30" X 36" BILCO

ACCESS HATCH

AND LADDER

JACOB'S

LADDER WITH

OSHA CAGE

GARAGE ANNEX

ROOF BELOW

30" X 36" BILCO

ACCESS HATCH

AND LADDER

BUILDING "A"

BURN ROOM #3

BUILDING "B"

BURN ROOM #1

BUILDING "A"

BURN ROOM #4

BUILDING "B"

BURN ROOM #2

BUILDING "A"

14 14 14

3'-0"

3'-0"

36" X 36"

CONFINED

SPACE

HATCH

36" X 36"

CONFINED

SPACE

HATCH

ABOVE

U P

U P

U P

D N

D N

D N

U P

D N

U P

D N

D N

36" x 48"

CHOP OUT

PANEL W/

PLYWOOD

COVER

File details come from the government source that posted it. Updated .