This document is a Statement of Work (SOW) for the procurement and installation of 108 new auditorium seats at building 4407 on Seymour Johnson Air Force Base in North Carolina. The contractor shall be responsible for providing all necessary personnel, equipment, supplies, tools, supervision, and services to complete this requirement. The seating must be suitable for an educational environment, durable for long-term use, and fill the room dimensions of 29'9" wide and 33'6-7/8" long, with specified walkway requirements. The seating specifications include fixed seating with shared arms, upholstered backs and seats, fold-away writing tablets, ADA transfer arms, and mounting the seating to the concrete floor. The work shall be performed during normal business hours, Monday through Friday, excluding holidays. The contractor is responsible for delivery, storage, and handling of the products, as well as cleaning up all packaging materials and debris upon completion.
The related federal contract opportunity is solicitation FA480924Q00640001 for Auditorium Seating at Seymour Johnson AFB, with the Department of the Air Force Air Combat Command as the procuring agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
AUDITORIUM SEATING
26 June 2024
1.0 OBJECTIVE
1.1 The 4th OSS/OSK on Seymour Johnson Air Force Base is reques ng the procurement and installa on of 108 new auditorium seats. The Contractor shall supply all necessary personnel, equipment, supplies, tools, supervision, and services for procuring and installing auditorium sea ng at bldg. 4407, Seymour Johnson Air Force Base, North Carolina.
1.2 4th OSS/OSK personnel will not accept damaged furniture or equipment to be installed in bldg. 4407. The Contractor shall be responsible for replacing any damaged items and removing all packaging materials/debris upon comple on.
2.0 REQUIREMENTS
2.1 DESCRIPTION OF WORK
3.0 INSTALLATION
Sea ng: The Sea ng area is on the main floor of bldg. 4407, requiring no stairs or elevators. The sea ng shall be suitable for an educa onal environment and durable for long-term use.
Sea ng shall fill room dimensions. There shall be no center aisle. Room dimensions are 29’ 9” wide and 33’ -6 & 7/8” long. Length is measured from the base of the stage to the back of the room. Walkways of approximately 4’ shall be maintained on the right, le and front side of the auditorium. A walkway of approximately 3’ shall be maintained behind the last row of sea ng.
Sea ng Specifica ons:
Fixed sea ng with shared arms Color-Black, Dark Gray (back, seat, and side arm panels) Fully upholstered (back & seat)
(1) fold-away wri ng tablet per seat (108) Floor Mounted, upright Plas c outer back panel ADA transfer Arm (Flip-up arm) Seating shall be 21"-22" wide, on-center
Sea ng shall be bolted to the floor (concrete) according to manufacturer’s recommenda ons, properly aligned, and level.
Sea ng layout shall maximize available space.
4.0 OPERATIONS HOURS
The contractor shall operate between the hours of 7:30 A.M. and 4:30 P.M.
EST, Monday through Friday, except Holidays.
5.0 DELIVERY, STORAGE, and HANDLING
All products shall be delivered to the installa on site. The contractor shall be responsible for product storage before installa on. No staging area will be provided. The contractor shall be responsible for the product un l the customer accepts complete installa on.
The contractor shall protect doors, doorways, flooring, and corridor walls during delivery and installa on. Any damages caused during this process shall be the contractor’s responsibility for repair.
6.0 CLEANING
All packaging material and debris shall be removed and properly disposed of by the contractor. Upon installa on comple on, products shall be cleaned and dusted. The area shall be le in a well-organized condi on and ready for occupancy. Damaged materials shall be replaced at no addi onal cost to the Government.