This document is a set of questions and answers related to a federal contract opportunity for the lease of a relocatable modular office facility at Seymour Johnson Air Force Base.
The key details are:
- The government is providing utilities (water, sewer, electricity, and communications) within 5 feet of the modular facility through a separate contract. The contractor is responsible for final connections.
- Electrical service will be 3-phase, 120/208V from a 225KVA pad-mounted transformer within 15 feet of the facility.
- The contractor will be responsible for installing interior communications cabling, with separate NIPR and SIPR networks. The government will provide the fiber optic communications back to the source.
- There are no requirements for wireless access points in this contract.
- Offers are due by 12:00 PM EST on 08 May 2024. All questions must be submitted by 12:00 PM EST on 26 April 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA480924Q00370005SF30.pdf | ||
| Attachment 1 ATF Relocatable Facilities SOW revised 8 may 24 Rev 1.docx | DOCX document | |
| Solicitation Amendment FA480924Q00370004 SF 30.pdf | ||
| Solicitation Amendment FA480924Q00370003 SF 30.pdf | ||
| 24Q0037 Building lease QandA 6 May 24 -Rev 1.xlsx | XLSX spreadsheet | |
| Attachment 1 ATF Relocatable Facilities SOW revised 8 may 24.docx | DOCX document | |
| Attachment 1 ATF Relocatable Facilities SOW revised 6 may 24.docx | DOCX document | |
| Solicitation Amendment FA480924Q00370002 SF 30.pdf | ||
| Solicitation Amendment FA480924Q00370001 SF 30.pdf | ||
| Attachment 2 WD 2015-4379 Rev 24 26 Dec 2023.pdf | ||
| Attachment 1 ATF Relocatable Facilities SOW.pdf | ||
| Solicitation - FA480924Q0037.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Answer | ||
| 1 | Will there be a site visit for this job? | No, The government has included all pertintent layouts in the SOW. Please reference Page 19 (Figuire 2) for a picture of utility areas. | |
| 2 | Do you have a list of SABER contractors on base? | Midnight Sun Centennial Kirratchiaq JV, LLC POC: Matt Sander (919) 566-1180 | |
| 3 | What size are the underground water/sewer? And at what depth are they? | Sewer line is 8in diameter. Water service line is 1.5in diameter. Water/sewer utilities will be run to within 5 feet of the modular facility by a separate government contract. | |
| 4 | How far away is the transformer? | Electrical service will be provided to within 5 feet of the modular facility by a separate government contract. Nearest medium-voltage (225 KVA, 120/208-volt) pad-mounted transformer will be provided IAW SOW section 3.5.1.2.A.1., within 15 feet of final modular facility connection point. | |
| 5 | For the electrical service coming to the building, will this be single phase or 3 Phase? | Three phase coming out of the 225 KVA government-provided transformer. | |
| 6 | Please confirm that the Government is bringing all utilities to the building skirting. | Water/sewer utilities will be run to within 5 feet of the modular facility by a separate government contract. | |
| 7 | Is the government intending to bring ALL utilities within 5’ of the building? | Yes - electric, water, comm, and sewer. The government needs to know the size and location of each respective connection point(s) at the modular facility. | |
| 8 | Are there any STC ratings throughout this building? | SOW Section 3.4.4.3. addresses interior office noise attenuation for normal conversations. | |
| 9 | Can you provide Acrylic Panel Signs sizes? | See Revised PWS. | |
| 10 | Is there enough water pressure for flush valve type fixtures, or should we plan for tank type? | There will be ample capactiy for flush valves. | |
| 11 | Can the electrical and communications boxes and conduits be installed in the walls, or are they to be surface mount? | NIPR and electric lines can be run within walls but not SIPR lines. | |
| 12 | Is awarded contractor to pull the communications back to the source? If so, what is the distance form modular building to source? | No, Contractor needs to pull all comm wires to a central point (comm rm). Base Communication contractors will pull fiber to the building. Either to a drop point on outside of facility, or into the facility comm room via entry point. SIPR Lines will be coming from SAFE/Switch. | |
| 13 | Can you clarify if SIPR cabling is to be in conduits above the ceiling (or just in the walls)? | See Revised PWS Paragraph 3.2.5.2 | |
| 14 | Is the SIPR to be differentiated from the CAT6 comm? | Utilize RED CAT 6 for SIPR and BLUE CAT 6 for NIPR. PWS para 3.6 and 3.8.1.2 | |
| 15 | CAT6 blue plenum throughout the building including SIPR with 2 connections per face plate. (9 drops in SIPR area, 48 drops in open space, 4 drops in closed office.) Is this what is desired or is the SIPR differentiated from the CAT6? If so, 1. Need cable type for SIPR. Cable quantity per faceplate. 3. Does this go to the same comm room as the rest of the communications? | See question 14. | |
| 16 | Is it desired for Wireless Access Points? If so, how many access points do we need to cable for? | ||
| Will the government be bringing the OSP inside of the building or is the contractor to being the Outside Plant inside the building and terminate? | Not required |