The document is a Contractor Questions and Government Responses file for Solicitation FA480325R0027, covering the 20 SF Armory Intrusion Detection System (IDS) Upgrade project. The government seeks to replace the current Honeywell Vindicator IDS in three buildings (B825, B1843, and B1865), which were constructed between 1986 and 2009 and range from 130 to 810 square feet. Key technical requirements include upgrading panels to Windows 10/VR 22 firmware, replacing all sensors/keypads/duress buttons with newest approved devices, implementing individual device tampers, creating single alarm points without daisy-chaining, and integrating the system with the Security Forces Head End IDS that reports to Base Defense Operations Center. The project mandates complete replacement of all network/IDS cabling, which must be run in conduit, and requires all junction boxes to have tampers and alarms. The government explicitly states no equipment substitutions are allowed, and all work must use Honeywell Vindicator equipment and be completed during specified times in the Statement of Work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: FA480325R0027
Contractor Questions and Government Responses
20 SF Armory IDS Upgrade
1. How old is the facility?
Government Response: B825 was constructed in 1998, B1843 was constructed in 2009, and B1865 was constructed in 1986.
2. How much square footage is in the facility?
Government Response: The following square footage is approximate.
B825 Armory - 810 sqft
B1843 Armory - 288 sqft
B1865 Armory - 130 sqft
3. How stable is the power?
Government Response: The base receives electrical power from an off base commercial provider.
4. Is there a dropped ceiling in all areas of installation?
Government Response: There are both suspended and hard ceilings with limited access.
5. What type of walls are in the perimeter area?
Government Response: The walls are concrete block.
6. Do we need to drill between the walls, to run our cable infrastructure?
Government Response: No.
7. Do we need to use conduit? If yes, what do you estimate the total conduit footage will be??
Government Response: Yes. Unfortunately, there are no drawings or plans available to provide this information, the Government cannot provide contractors with estimates. Offerors were urged to participate in the scheduled site visit, however, there were no contractors at the site-visit.
8. Are the door frames metal or concrete filled?
Government Response: Door frames are metal.
9. Please provide a comprehensive list of quantities of all IDS items needed to include model # (e.g. total number of motion sensors, glass breaks, etc.) per location.
Government Response: Please refer to the Statement of Work (SOW).
10. Do you currently have existing IDS Sensors in your doors? Please specify which doors.
Government Response: Yes. Please refer to the SOW.
11. What is the manufacturer of the existing IDS system?
Government Response: Honeywell Vindicator. Please refer to the SOW for additional info.
12. Will we be able to reuse the existing cable? If so, what type of cable is there currently?
Government Response: No. All the wiring for existing IDS must be replaced. Note: Some of the existing wiring is not correct, for example, the IDS in the main armory (B825) is “daisy chained” for all sensors, and must be corrected.
13. Are ceilings Suspended? Or Hard Lid?
Government Response: There are both suspended and hard ceilings with limited access for both.
14. Are there existing Cable Trays for wiring above ceilings?
Government Response: No. Note: All IDS cables must be inside a conduit.
15. Can existing wiring be utilized?
Government Response: No. All the wiring for existing IDS must be replaced. Note: Some of the existing wiring is not correct, for example, the IDS in the main armory (B825) is “daisy chained” for all sensors, and must be corrected.
16. Is a “UPS” required? If so, What Time/Power Duration is required?
Government Response: No, a “UPS” is not required. However, backup batteries are required to be directly connected/installed inside all panels. Please refer to SOW for additional information.
17. re “Or Equal” Equipment substitutions allowed?
Government Response: No, this project must be Honeywell Vindicator Intrusion Detection System (IDS). Please see the Justification and Approval (J&A) for further information
18. Is “Plenum Wire” acceptable?
Government Response: No. CAT 5/6 cabling is required to tie into the current network switches utilizing RJ45 connections from the IDS equipment to the switch.
19. Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?
Government Response: No, all work will be completed during the times specified in the SOW.
20. What is the height of the Exterior Cameras? (If any)
Government Response: There are no cameras required in this project.
Solicitation: FA480325R0027
Contractor Questions and Government Responses
20 SF Armory IDS Upgrade
21. Please provide/post other “Q &A” requests?
Government Response: The Government’s understanding of this question is please provide/post all Contractor Questions with Government responses. Yes, the Government’s position is all questions and responses will be compiled and posted as an Amendment to this solicitation.
22. Please provide a list of equipment and parts # that are to be installed.
Government Response: Please refer to the SOW.
23. Are there pipe chases between floors??
Government Response: All facilities are first floor only. Note: All cabling is above the ceiling.
24. What is the range of the budget for this project, and is it already appropriated?
Government Response: This is a service contract, not a construction project, disclosure of the “magnitude of construction” projects is not available for a service contract.
25. Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed?
Government Response: This is not a construction project, progress payments are not authorized.
26. How many feet of new wire will have to run?
Government Response: There are no drawings or plans available to provide this information, the Government cannot provide contractors with estimates.
27. What kind of cipher lock and quantities are required e.g. X-10?
Government Response: There are no cipher locks or X-10’s required for this project.
28. Please post the sign in sheet and the Q&A’s from the site visit.
Government Response: There were no contractors present on the site visit.
29. Please post the drawings and the key for the drawings.
Government Response: Please refer to the SOW for requested information.
End of Contractor Questions and Government Responses.