Attachment 05 - Questions and Answers.pdf

PDF 291 KB Posted

Attached to
B1118 SAPR Office Wall and Door
Solicitation number
FA480325R0018
Issued by

About this file

This document is a Questions and Answers (Q&A) attachment for the federal contract opportunity FA480325R0018 - SAPR Office Wall and Door project at Shaw Air Force Base. The Q&A provides detailed clarifications about specific construction requirements, including door specifications, installation details, and project parameters. Key details include a metal door with right-side hinges to be installed in a hallway, frosted glass that is non-translucent, a 4" carpet coved base, and work to be performed Monday through Friday from 0800-1600 hours. The project will occur in an occupied building with designated parking and laydown areas, with a preference for sound control rather than complete soundproofing. The solicitation is a small business set-aside for construction work under NAICS 236220, with a project magnitude less than $25,000, and proposals are due by 30 April 2025 at 2:00 PM EST.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 05 FA480325R0018 – SAPR Office Wall and Door Q&A

• What is the brand, style number, color and height of the carpet coved base for the wall addition?

• 4" height / Take sample to be matched

• What's the swing of the door to be installed in hallway? Left or Right? Do you want the door swinging into the new closed off space or out?

• Door needs to open in to the closed off space, with hinges mounted on the right.

• Do you have the specification for ceiling grid and ceiling tiles? {name, brand, product number)

• Take sample to be matched.

• What's the wall paint color?

• Take sample to be matched.

• What is the brand name and serial number for the Best Lock and Cypher lock?

• Install lock that comes with kit.

• Does the wall that's being installed need to be tied into the deck? or at the ceiling tile level?

• Ceiling tile height / to verify, there should be no visibility between rooms.

• Does the door that needs to be installed in the hallway need a glass transient header? or a drywall header?

• Drywall

• Does the door that needs to be installed in the hallway, need to be metal? or aluminum? and what color?

• Door should be metal and substantially similar to example photo.

• Can you confirm the glass door and sidelights needs to be frosted? What level of frosted glass is desired they range from lightly frosted to opaque? Can you provide example of level desired?

• Door needs to be frosted to a degree so as to be non-translucent

• For clarification can you provide a sample picture of the storefront door desired with sidelight?

• See attached photo

• What's the work schedule? Are we allowed to work nights and weekends?

• Monday - Friday / 0800 – 1600

• Will the building be occupied during the project?

• Yes

• Will we have designated parking and laydown area for project?

• Yes

• Can we clarify sound proofing versus sound control? If other existing walls and office doors are not up to standard it will be hard to guarantee complete sound proof for that room.

• Sound Control / Sound Dampening is preferred.

Attachment 05 FA480325R0018 – SAPR Office Wall and Door Q&A

• Can we confirm exact location to add the door in hallway?

• Attached to the existing header closest to the adjacent hallway entrance.

• Will we need to add any additional fire alarm strobe in hallway with addition of the door?

• No.

• Storefront doors have an ordering lead time, will Notice to Proceed and Number of days to complete project account for lead time on doors?

• Yes NTP will account for material lead time.

Storefront Door Example Image