Attachment 02 - SAPR Office Wall and Door Price Breakdown.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
B1118 SAPR Office Wall and Door
Solicitation number
FA480325R0018
Issued by

About this file

The document is a detailed Excel pricing breakdown for a wall and door renovation project at Shaw Air Force Base. The solicitation (FA480325R0018) is a competitive small business set-aside for construction work, with a project scope involving interior renovations including painting, wall base installation, ceiling systems, partition walls, electrical conduit work, and glass door installation. The project is located at B1118 SAPR Office, with a performance period not to exceed 30 days after Notice to Proceed, and has a construction magnitude under $25,000.

Key procurement details include a mandatory site visit scheduled for 3 April 2025 at 9:30 AM, with base access requiring prior coordination through the Contracting Officer (Ms. Zelda Williams) or Contract Specialist (Christon Reed). Proposals are due by 30 April 2025 at 2:00 PM EST, and the work must comply with multiple regulatory standards including UFC, UFGS, IBC, IPC, NEC, NFPA, and Shaw Air Force Base Design and Construction Standards. The project is under the Department of the Air Force Air Combat Command, with NAICS code 236220 for small business contractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

`FOR OFFICE USE ONLY
Project:Proj NameVLSB -25-2503Project Engineer:Austin Baker
Location:1118Department:20 CES
Contractor:6-Mar-25
Address:
PR No.:
For Official Use Only
ReferenceLine No.ItemUnit of MeasureQuantityMaterial CostsLabor CostsDirect CostLine Total
Unit Cost (Means)TotalLabor Hours per Unit (Means)Labor Cost per Unit (Means)Labor-HoursAvg. Rate ($/hr)Total
SAPR
1Paints & coatings, walls & ceilings, interior, concrete, drywall or plaster, latex paint, 3 coats, smooth finish, sprayS.F.
2Wall base, vinyl, straight or cove, standard colors, 4" high, 1/8" thickL.F.
3Detection system, strobe & horn, excluding wires & conduitsEa.
4Acoustical ceilings, fiberglass boards, film faced, 2' x 2' or 2' x 4' x 5/8" thickS.F.
5Suspended ceiling systems, seismic clips, attached at wallsEa.
6Ceiling suspension system, class A, 15/16" T bar, 2' x 4' gridS.F.
7Ceiling demolition, suspended ceiling, mineral fiber, 2 x 2 or 2 x 4, removeS.F.
8Selective demolition, rubbish handling, dumpster, 6 C.Y., 2 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition costWeek
9Partition wall, interior, standard, taped both sides, installed on & incl. 2" x 4" wood studs, 16" OC, 8' to 12' high, 1/2" gypsum drywallS.F.
10Cellulose fiber board, 1/2" thickS.F.
11Rigid galvanized steel conduit, 3/4" diameter, to 10' H, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LFL.F.
12Wire, copper solid, 600 volt, #14, type THW, normal installation conditions in wireway, conduit, cable trayC.L.F.
13Doors, glass, swing, tempered, 1/2" thick, 3' x 7' opening, incl. hardwareOpng.
14Field personnel, field engineer, engineer, averageHours
15Wire, copper solid, 600 volt, #12, type THW, normal installation conditions in wireway, conduit, cable trayC.L.F.
16Rigid galvanized steel conduit, 3/4" diameter, to 10' H, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LFL.F.

Foreman days

Totals: $0.00 $0.00 $0.00 $0.00

Total Material Cost:$0.00
Total Labor Cost:$0.00
Direct Cost:$0.00
Total Line Item Cost:$0.00
Overhead:$0.00
Subtotal:$0.00
Profit:$0.00
Subtotal:
Bond:
Total Contract Price: