Attachment 7 - QA.pdf
PDF 242 KB Posted
- Attached to
- B1904 Repair ADA Compliant Doors
- Solicitation number
- FA480325R0014
About this file
This document is a Questions and Answers (Q&A) attachment for Solicitation FA480325R0014, issued by the 20th Fighter Wing at Shaw Air Force Base in South Carolina. The Q&A provides specific details about door requirements for a door repair project, including specifications for exterior metal doors, paint, and hardware. Key requirements include using welded frames meeting Steel Door Institute extra heavy duty standards, applying Sherwin-Williams Black Fox paint with spray finishing, and using Best Lock system cores that must be coordinated with the Base Locksmith.
The related federal contract opportunity is a small construction project to replace two exterior doors at Building 1904, with a value under $25,000. The project is 100% set aside for Women-Owned Small Businesses (WOSB) and requires contractors to provide all planning, labor, equipment, and materials necessary to complete the door replacements. Contractors must comply with specific Shaw AFB Design and Construction Standards, including door material, finishing, and hardware installation requirements. The contracting point of contact is SrA Tariq Ellis, with technical questions to be directed to specific Air Force personnel.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
20TH FIGHTER WING (ACC)
SHAW AIR FORCE BASE SOUTH CAROLINA
VICTORY BY VALOR
12 March 2025
MEMORANDUM FOR SOLICITATION FA480325R0014
FROM: 20th Contracting Squadron/PKB 321 Cullen Street, Building 216 Shaw Air Force Base, SC 29150
SUBJECT: Solicitation Questions and Answers
1. Is there a door schedule available that contains preferred part number and/or manufacturer?
a. No preferred parts or manufacturer designated other than the cores to meet the Shaw AFB Design and Construction Standards
b. Exterior metal doors shall have welded frames. Follow Steel Door Institute (SDI) standards for categorizing and labeling doors during design.
Minimum for exterior doors shall be SDI extra heavy duty. Consider maximum duty with continuous hinges for extreme traffic conditions. All exterior doors including roll up type shall be insulated unless otherwise noted. All exterior doors shall conform to UFC 4-010-01 for blast resistant requirements
c. Use Best Lock system cores on all doors in base facilities. All cores shall be pinned as specified by the Base Locksmith and shall be shipped directly to the Base Locksmith. Coordination of the delivery of cores and the key plan shall be done directly through the Base Locksmith at phone #
(803) 895-9671
2. What color should the doors be painted?
a. Follow Shaw AFB Design and Construction Standard.
i. The color and manufacturer specified by the Base Architect is Sherwin-Williams, Black Fox.
b. “Metal doors that are field painted shall be spray finished. Brush and roller finish is not acceptable. This includes touch up”
c. “Paint grade and quality shall be determined by facility type and occupancy. In no case shall less than the standard paint spec for Sherwin Williams, Benjamin Moore or other top of the line manufacturers be used.
Upgrade paint specifications shall be used in areas specified by the Base Architect”
DEPARTMENT OF THE AIR FORCE
20TH FIGHTER WING (ACC)
SHAW AIR FORCE BASE SOUTH CAROLINA
VICTORY BY VALOR
3. Is there a hardware schedule available that contains preferred part numbers and/or manufacturers?
a. Nothing specified other than what’s in the Shaw Standards
4. Please provide the name and manufacturer of the existing paint color on the building
a. See Shaw Standards and approval from Base Architect.
b. The color and manufacturer specified by the Base Architect is Sherwin- Williams, Black Fox.
5. The SOW states that the fire extinguisher is to be relocated. Do you intend for the fire alarm to be relocated as well for the door at the north entrance?
a. There is no requirement to relocate fire alarm.
6. All other information as stated in the Solicitation remains unchanged.
7. Note: Please ensure you include acknowledgement of this and all amendments in your proposal. Failure to do so may result in your proposal being found nonresponsive.
8. Please direct all concerns to the Contracting Specialist, SrA Tariq Ellis at tariq.ellis@us.af.mil and the Contracting Officer, SSgt Christon Reed at christon.reed@us.af.mil mailto:tariq.ellis@us.af.mil mailto:christon.reed@us.af.mil