Attachment 6 - Bid Sheet.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
B1904 Repair ADA Compliant Doors
Solicitation number
FA480325R0014
Issued by

About this file

Attachment 6 - Bid Sheet.xlsx is a detailed pricing workbook for a door repair project at Shaw Air Force Base, South Carolina. The bid sheet itemizes specific door replacement and installation tasks, including demolition of existing doors and frames, saw cutting, conduit and switch box removal, installing duplex light switches, new door and frame installation, door closer and hardware installation, and door finishing. The document includes line items for project supervision (superintendent and project manager days) and calculates total material, labor, and direct costs, with spaces for overhead, profit, and bond calculations.

The related federal contract opportunity (Solicitation Number FA480325R0014) is a small construction project set aside 100% for Women-Owned Small Businesses (WOSB) under $25,000. The project involves replacing two exterior doors at Building 1904 at Shaw AFB, requiring all necessary planning, labor, equipment, and materials. The solicitation is issued by the Department of the Air Force Air Combat Command and includes requirements for SF 1413 documentation for subcontractor compliance with labor laws.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Worksheet

For Official Use Only
Line No.ItemUnit of MeasureQuantityMaterial CostsLabor CostsDirect CostLine Total
Unit Cost (Means)TotalLabor Hours per Unit (Means)Labor Cost per Unit (Means)Labor-HoursAvg. Rate ($/hr)Total
Demo
1Demo exisitng door & frameea20.0$0.00$0.00
2Saw cut for new frameea20.0$0.00$0.00
3Remove conduit and switch boxea10.0$0.00$0.00
Install
4Install duplex light switchea1$0.00
5Door and Frameea2$0.000$0.000.0$0.00$0.00
6Door closer and hardwareea2$0.000$0.000.0$0.00$0.00
7Finish Door (both sides)ea2$0.000$0.000.0$0.00$0.00
Supervision
8Superintendentdays50$0.000.0
9Project Managerdays30$0.000.0
Totals:$0.00$0.00$0.00$0.00
Total Material Cost:$0.00
Total Labor Cost:$0.00
Direct Cost:$0.00
Total Line Item Cost:$0.00
Overhead:$0.00
Subtotal:$0.00
Profit:$0.00
Subtotal:
Bond:
Total Contract Price: