Attachment 6 - Bid Sheet.xlsx
XLSX spreadsheet 40 KB Posted
- Attached to
- B1904 Repair ADA Compliant Doors
- Solicitation number
- FA480325R0014
About this file
Attachment 6 - Bid Sheet.xlsx is a detailed pricing workbook for a door repair project at Shaw Air Force Base, South Carolina. The bid sheet itemizes specific door replacement and installation tasks, including demolition of existing doors and frames, saw cutting, conduit and switch box removal, installing duplex light switches, new door and frame installation, door closer and hardware installation, and door finishing. The document includes line items for project supervision (superintendent and project manager days) and calculates total material, labor, and direct costs, with spaces for overhead, profit, and bond calculations.
The related federal contract opportunity (Solicitation Number FA480325R0014) is a small construction project set aside 100% for Women-Owned Small Businesses (WOSB) under $25,000. The project involves replacing two exterior doors at Building 1904 at Shaw AFB, requiring all necessary planning, labor, equipment, and materials. The solicitation is issued by the Department of the Air Force Air Combat Command and includes requirements for SF 1413 documentation for subcontractor compliance with labor laws.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Worksheet
| For Official Use Only | ||||||||||||
| Line No. | Item | Unit of Measure | Quantity | Material Costs | Labor Costs | Direct Cost | Line Total | |||||
| Unit Cost (Means) | Total | Labor Hours per Unit (Means) | Labor Cost per Unit (Means) | Labor-Hours | Avg. Rate ($/hr) | Total | ||||||
| Demo | ||||||||||||
| 1 | Demo exisitng door & frame | ea | 2 | 0.0 | $0.00 | $0.00 | ||||||
| 2 | Saw cut for new frame | ea | 2 | 0.0 | $0.00 | $0.00 | ||||||
| 3 | Remove conduit and switch box | ea | 1 | 0.0 | $0.00 | $0.00 | ||||||
| Install | ||||||||||||
| 4 | Install duplex light switch | ea | 1 | $0.00 | ||||||||
| 5 | Door and Frame | ea | 2 | $0.00 | 0 | $0.00 | 0.0 | $0.00 | $0.00 | |||
| 6 | Door closer and hardware | ea | 2 | $0.00 | 0 | $0.00 | 0.0 | $0.00 | $0.00 | |||
| 7 | Finish Door (both sides) | ea | 2 | $0.00 | 0 | $0.00 | 0.0 | $0.00 | $0.00 | |||
| Supervision | ||||||||||||
| 8 | Superintendent | days | 5 | 0 | $0.00 | 0.0 | ||||||
| 9 | Project Manager | days | 3 | 0 | $0.00 | 0.0 | ||||||
| Totals: | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Material Cost: | $0.00 |
| Total Labor Cost: | $0.00 |
| Direct Cost: | $0.00 |
| Total Line Item Cost: | $0.00 |
| Overhead: | $0.00 |
| Subtotal: | $0.00 |
| Profit: | $0.00 |
| Subtotal: |
| Bond: |
| Total Contract Price: |
File details come from the government source that posted it. Updated .