FA480318R0005_Atth_2_Rev_1_PWS.pdf

PDF 526 KB Posted

Attached to
Lease and Maintenance of Washers and Dryers
Solicitation number
FA4803-18-R-0005
Issued by

About this file

FA480318R0005 Amendment 0001, Attachment 2 Performance Work Statement Revision 1

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

LEASE AND MAINTENANCE OF WASHERS AND DRYERS

20th Civil Engineer Squadron

Shaw AFB, SC

Date: 10 October 2017

Revision 1 Date: 17 November 2017

Reviewed

Date:

Sonia Taylor

Quality Assurance Program Coordinator

Accepted

Date:

Daniel P. Kane

Contracting Officer

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005 Attachment 2

TABLE OF

CONTENTS

PARAGRAPH TITLE PAGE

1.0. Description of Services 3

2.0. Services Summary (SS) 6

3.0. Government Furnished Property and Services 6

4.0. General Information 7

5.0. Appendices 11

Appendix A Equipment by Location list 12

Appendix B Connection Requirements Connection Requirements 13

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005

1.0. DESCRIPTION OF SERVICES. The contractor shall provide all tools, transportation, supplies, management, labor, and equipment necessary to provide washers and dryers to include installation, preventative maintenance, and repairs ensuring continuous and safe operation.

Machines are subject to heavy usage 24 hours a day, 365 days a year. Machines are to be placed at Shaw Air Force Base, SC at the quantity and locations listed in Appendix A, Equipment by

Location List (Appliance Locations and Quantities) and (Area Map).

1.1. BASIC SERVICES. The contractor shall provide new, 2017 model or newer of commercial grade washers and dryers. The contractor shall supply all necessary water/drain lines; flex exhaust hoses and all other items necessary for proper installation and operation.

1.1.1. WASHERS. Washers must have a minimum capacity of 14 pounds dry weight. Washers shall be front loading Speed Queen Model number LFN50RSP113TW01 or equivalent 2017 or newer. Washers shall have standard hot/cold water connections and be capable of operating on a

20 amp circuit without overloading the existing circuits during normal operation. The electrical power available is 120 volts AC, 60 Hz.

1.1.2. DRYERS. Dryers must have a minimum capacity of 16 pounds dry weight. The dryers shall be Speed Queen Model number LDEA5RGS173YW04 or equivalent 2017 or newer. The electrical power available is 208 volts AC, 60 Hz.

1.1.3. STACKABLE WASHER/DRYER. Stackable units will be Speed Queen Model number

LTEA5FSP173TW04 or equivalent 2017 or newer.

1.1.4. EQUIPMENT. All equipment shall be subject to the Government's inspection as to condition, appearance and serviceability at the time of installation. The contractor shall provide the Contracting Officer a list of the make, model, serial number, and installed location of all washers/dryers used in the performance of this contract.

1.1.4.1. The contractor shall maintain all equipment in proper mechanical working condition. The contractor shall provide replacement machines for equipment which may become unserviceable or otherwise fail to comply with the specifications.

1.1.4.2. All equipment will be new, 2017 model or newer, and in good operating condition and appearance that will provide required service. Failure of a washer or dryer to operate properly on a regular basis shall constitute sufficient justification for replacement. If either type of equipment fails to operate satisfactorily two or more times within a one week period, the contractor will replace equipment with a new washer or dryer.

1.1.4.3. All equipment shall meet the specifications established by the United States Public

Health Foundation and National Sanitation Foundation and is subject to inspection by the installation medical authority. All electrically operated equipment will be installed in accordance with the standards of the latest edition of the National Electrical Code.

1.1.4.4. All equipment placed in a facility shall be the same color and relative size, for a uniform

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005 appearance.

1.1.4.5. All equipment must be Federal Energy Conservation compliant IAW FAR 23.203.

1.2. MOVING/RELOCATING WASHERS AND DRYERS. A move is defined as either permanently or temporarily moving a washer or dryer from any installed location to a different location in the same facility or to a location in a different facility. The contractor shall anticipate a maximum of twenty moves per contract year. The contractor, at no additional cost to the government, shall accomplish all movements.

1.2.1. Buildings may be under rehabilitation throughout the contract period. The contractor may be required to remove machines from these buildings and reinstall upon completion of rehabilitation. Some buildings may be scheduled for demolition or change to an office type building and the contractor may be required to remove the machines permanently or relocate to another dormitory. The contractor shall ensure timely removal and reinstallation of washers and dryers in these buildings as to not delay occupancy nor delay rehabilitation. Work stated above should be performed at no additional cost to the government, or lease costs for additional machines shall be the same as for machines already on base.

1.3. INSTALLATION AT START OF CONTRACT. All machines shall be installed within

(3) business days of the start of the contract period. Water, drains and 120 volt electrical connections are available for the connection of washers and dryers. The contractor shall provide and install all adapters, hoses, and fittings required to make his equipment compatible with existing connection. Vent caps/pipes and 208-volt electrical receptacles are available for connection. The contractor shall provide and install necessary flexible dust vent, cords and plugs required to make their equipment compatible with the existing connections. Machines shall be grounded in accordance with the manufacturer's instructions. All work shall be accomplished in accordance with the National Electrical and Plumbing Codes. The contractor will not alter

Government real property. Maps will be provided to contractor upon award of contract.

1.4. REMOVAL AT END OF CONTRACT. The contractor shall remove all washers and dryers within (3) calendar days after expiration or termination of this contract.

1.5. ADDITIONAL WASHERS AND DRYERS. During the term of the contract, the contractor shall provide washers/dryers to new locations. Quantities up to four (4) washers/dryers shall be delivered within three (3) calendar days after receipt of notification from the contracting officer or his/her designated representative. Large quantities of five (5) or more washers/dryers shall be delivered within fourteen (14) calendar days. All machines added to the contract shall be no older than the age of those initially installed. Additional washers/dryers added to the contract shall be at the same initial unit price.

1.6. REMOVAL OF WASHERS AND DRYERS. The contractor shall remove any machine from a specified location within three (3) calendar days after receipt of notification from the

Contracting Officer or designated representative. The equipment shall be removed at the contractor's own expense with an appropriate adjustment to the contract amount.

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005

1.7. SIGNS AND DECALS. The contractor shall provide at each machine the necessary signs or decals to provide the proper equipment operating instructions. Each unit shall have a unique number (identification number) as to identify the location of the unit. The contractor shall submit a sample of all signs and decals to the contracting office for approval. The contractor shall attach to each machine a decal indicating telephone number (895-5627) and instruction for contacting the Unaccompanied Housing Managers office in case of equipment malfunctions.

Signs and decals shall be replaced when they become faded, soiled, defaced or illegible and must present a professional appearance. The use of handmade or improvised signs is not acceptable.

1.8. STANDARD OF PERFORMANCE. The contractor shall inspect and clean 100% of all washers/dryers semi-annually. Washing machines seals will be inspected for damage and replaced as needed. Door seal and surrounding area will be wiped clean of all dirt and debris to reduce odor in the unit. Hoses will be inspected and replaced as needed to prevent system failure. Dryer vents/ducts will be cleaned inside and out. Remove lint buildup and replace faulty or damaged ductwork as necessary. The contractor will schedule cleaning with Unaccompanied

Housing Management/Billeting Office and notify them within 24 hours upon 100% of the washers/dryers are inspected and cleaned.

1.8.1. The contractor shall service each unit within one working day after the COR reports a problem. If the Contractor does not repair the problem unit within three (3) working days after the unit is reported in need of repair, the contractor shall immediately replace the machine with a new one, at no additional cost to the Government, immediately following the three (3) day down time. If this does not occur the contractor is not in compliance. All replacement equipment will be no older than the age of those initially installed.

1.8.1.1 Contractor must replace inoperative machines within 48 hours or by the end of the next duty day, whichever comes first following the time of notification to the contractor for inoperative machines. Normal duty hours are 0730-1630, Monday through Friday, excluding

Federal Holidays. The contractor shall replace any machine that cannot be repaired within the above time constraints. All replacement equipment will be no older than the age of those initially installed.

1.8.2. Routine maintenance. The contractor shall inspect and clean 100% of all dryer vents/ducts, inside and out, annually. Remove lint buildup and replace faulty or damaged ductwork as necessary. The contractor will schedule this cleaning with Unaccompanied Housing

Management and notify them within 24 hours once 100% of the dryers are inspected and cleaned.

1.8.3. After repair, the contractor shall clean and wipe down each machine, clean around the immediate area and remove all debris or trash caused by the repair.

1.8.4. The contractor shall not be allowed to utilize any equipment that is bent or the finish damage so that it impairs the operation and appearance of the machine.

1.8.5. The contractor shall repair at their own expense, any damage to government property resulting from the movement of washers and dryers into or out of any facility.

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005

1.8.6. The contractor shall pay for or replace any clothing or related articles that are damaged as a direct result of use by any washer or dryer. The damaged articles shall be given to the contractor for verification of damages. A written statement of the itemized articles and replacement cost shall be provided to the contractor. The contractor shall make restitution within

30 days.

1.8.7. Any personal items of equipment, clothing, jewelry, money etc., found on the premises by the contractor or his employees shall be given to the Unaccompanied Housing Manager of the building where the items are found.

1.8.8. Repair personnel employed by the contractor must possess the technical skills necessary to provide the required services on all contractor-furnished equipment.

2.0 SERVICES SUMMARY.

Performance

Objective

PWS

Paragraph

Performance Threshold Method of

Surveillance

SS1- Provide installation of machines

1.3 Complete installation within 3 days of

start of contract. All washers/dryers meet all specifications listed in PWS.

100%

Inspection within 10 days of start of contract.

SS2-

Maintenance, and repair of machines

1.8.1, 1.8.1.1

Complete repairs within one working day after COR reports a problem. If machine is not fixed within 3 working days of reported problem, the contractor shall immediately replace the machine with a new one.

Periodic

Surveillance by COR’s.

SS3-

Clean/inspect dryer vents/ducts.

1.8.2 Clean/inspect all washers/dryers semi-

annually.

Periodic

Surveillance by COR’s.

SS4-

Moves/relocation of machines

1.2, 1.2.1, 1.6

The contractor shall anticipate a maximum of twenty moves per contract year, either permanent or temporary moves. Due to dorm rehabilitation, the contractor may need to move machines from these areas and required to re-install them upon completion of rehabilitation.

Periodic

Surveillance by COR’s.

SS5- Removal of machines at the end of contract

1.4 The contractor shall remove all machines

within 3 calendar days after expiration or termination of this contract.

100%

Inspection when contractor informs of completion of removal.

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005

2.1. QUALITY CONTROL. The contractor shall develop and maintain a quality program to ensure services are performed in accordance with this Performance Work Statement. The contractor shall develop and implement procedures to identify and prevent defective services from recurring. As a minimum, the contractor shall develop quality control procedures that address the areas identified in sections 1 and 2. The government quality assurance personnel must have a specific quality control manager to notify in case of deficient service or customer complaints.

2.2. QUALITY ASSURANCE. The government will periodically evaluate the contractor's performance by appointing a representative(s) to monitor performance to ensure services are received.

2.3. GOVERNMENT REMEDIES. The contracting officer shall follow the requirements of

FAR 52.212-4. Contract Terms and Conditions for Commercial Items, for contractor's failure to correct nonconforming services.

3.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES. This section includes all GFP and services that the government will provide to the contractor.

3.1. UTILITY CONNECTIONS. The government shall provide necessary utility fixed connections as identified for the operation of the washers and dryers. This shall include the drain, hot/cold water supplies and electrical service for washers and dryers. The contractors shall connect the washers and dryers to these utility connections in an approved manner.

3.2. INFORMATION MANAGEMENT. All records, files, documents, regardless of media

(e.g., paper, electronic, etc.), as described in the PWS, that are the responsibility of the contractor are the property of the Government and shall remain so upon termination or completion of the contract. The contractor shall keep these items current and maintain and dispose of them in accordance with the requirements established in Air Force Instruction (AFI) 33-322, Records

Management Program, paragraph 10, Air Force Manual (AFMAN) 33-363, paragraph 6.4, Air

Force Manual (AFMAN) 33-364, paragraph 2.13, and the Air Force Records Disposition

Schedule available on the Air Force Portal link. Records shall be turned over to the Government upon completion of the contract unless otherwise stated. All records are subject to the Freedom of Information and Privacy Act. The Shaw AFB Records Management Office (20 CS/SCOKR), 895-1630, will provide assistance and training to the contractor to ensure compliance with

Federal record keeping requirements.

3.4. OPERATIONS SECURITY (OPSEC) REQUIREMENTS. Per AFI 10-701 Chapter 8 and ACC Supplement I Chapter 8, the contractor does not require OPSEC training for this contract.

4.0. GENERAL INFORMATION.

4.1. CLEAN-UP. The contractor is responsible for the collection and disposal of all debris, rubble, residue and waste material generated in the performance of work under this contract. All

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005 such material shall be removed by the contractor and disposed of in a state-approved, permitted landfill. The contractor is not permitted to deposit any such materials in the base trash collection containers or at any on-base location without prior approval of the Contracting Officer.

4.2. ALL WASHERS AND DRYERS MUST MEET ENERGYSTAR STANDARDS.

Please see: https://www.energystar.gov/products/appliances/clothes_washers https://www.energystar.gov/products/appliances/clothes_dryers

4.3. WASHERS AND DRYER LOCATIONS LIST. See Appendix A.

4.4. NORMAL HOURS OF OPERATION. The Government's normal duty hours are five days per week, Monday through Friday, from 7:30AM to 4:30PM.

4.4.1. RECOGNIZED HOLIDAYS. The contractor is not required, nor will be allowed, to provide service on the following days (note: Any of the below holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on a Sunday will be observed on the following Monday):

New Year’s Day 1 January

Martin Luther King's Birthday Third Monday in January

President's Day Third Monday in February

Memorial Day Last Monday in May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day 11 November

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December

4.5. ENVIRONMENTAL POLLUTION. The contractor shall comply with all federal, state and local environmental pollution standards and regulations. The contractor shall avoid any practice that does not comply with local environmental pollution standards and regulations. The contractors shall connect the washers and dryers to these utility connections in an approved manner.

4.6. VANDALISM. Any act of vandalism discovered by the contractor shall be reported immediately to Security Forces Squadron at (803) 895-3669 and the Contracting Officer at

(803)895-6842 (no collect calls). Losses in damaged or stolen equipment which occur in base facilities will be investigated by the government. Upon determination that the contractor is not responsible for damage the contractor will be reimbursed for the cost of the damage. Wear and tear of knobs, hinges, and other inexpensive items will not be considered vandalism.

4.7 CONTRACTOR’S REPRESENTATIVE. The contractors shall designate in writing to the

Contracting Officer, a representative who shall be in charge of all work during normal working https://www.energystar.gov/products/appliances/clothes_washers https://www.energystar.gov/products/appliances/clothes_dryers

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005 hours. The contractor's representatives shall be empowered with sufficient authority to enable him to meet the conditions that arise in the operation of the contract without undue delay. The contractor’s representative shall have the authority to process all personal claims against the contractor.

4.8. PURCHASE OF RECYCLED PRODUCTS. The contractor shall comply with the DoD

Green Procurement Program for Recovered Materials.

4.9. USE OF GOVERNEMENT EQUIPMENT. The contractor will not use any of the

Gymnasium or recreational equipment in any of the base facilities. This equipment includes

TV's, stereo's, or cooking appliances.

4.10. SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS

4.10.1. Listing of Employees. The contractor shall maintain a current listing of employees. The list shall include the employee's name, social security number and type of investigation if contract work involves unescorted entry to Air Force restricted areas or other sensitive areas designated by the installation commander. The list shall be provided to the Program Manager and sponsoring agencies Security Manager. An updated listing shall be provided when an employee's status or information changes.

4.10.2. Security Training. The Contractor ensures all Contractor employees receive initial and recurring security education training from the sponsoring agency's security manager. The security manager shall provide employees with training required by DODM 5200.01, DoD

Information Security Program, Volume 3, and AFI 16-1404, "Air Force Information Security

Program". The Contractor will also provide initial and follow-on training to contractor personnel who work in Air Force controlled/restricted areas. Air Force restricted areas and controlled areas are explained in AFI 31-101, Integrated Defense.

4.10.3. Pass and Identification Items. The contractor shall ensure the pass and identification items required for contract performance are obtained for employees. All contractor employees shall undergo a background check conducted by 20th Security Forces Squadron prior to issuance of base access credentials. Only identification cards or driver's licenses from REAL ID compliant states or territories will be accepted. For a full list of REAL ID Act and compliant and non-complaint states, please visit https://www.dhs.gov/current-status-states-territories. Contact

20th Security Forces Squadron for alternative forms of acceptable identification to conduct background checks.

4.10.3.1. Background Checks. All contractor employees shall submit to a criminal background check accomplished by Shaw Air Force Base Security Forces prior to the employee being issued base access credentials. Each Contractor personnel must submit their Social Security Number, Date of Birth, and Driver's License state and number. Failure to submit requested Contractor

Listing of Employees as indicated can result in denial or delay of issuing base access credentials.

Background checks are only good for the company that requested them. Processing criminal background checks takes, at a minimum, 7-10 days from time of submission.

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005

4.10.4. Retrieving Identification Media. The contractor is responsible for retrieving all identification media from employees who depart for any reason before the contract expires; e.g.

terminated for cause, retirement, etc.

4.10.5. Traffic Laws. The contractor and its employees shall comply with base traffic regulations.

4.10.6. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on Shaw Air Force Base.

4.10.7. For Official Use Only (FOUO): The Contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

4.10.8. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of

DOD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

4.10.9. Physical Security. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.

4.10.10. Controlled/Restricted Areas. (IF APPLICABLE) The Contractor shall implement local base procedures for entry to Air Force controlled/restricted areas where Contractor personnel will work. An AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by the sponsoring agencies Security Manager before a Restricted Area Badge will be issued. Contractor employees must have a completed Tier 1 investigation before receiving a

Restricted Area Badge. Interim access can be granted IAW AFI 31-501, Personnel Security

Program Management

4.10.11. Key Control. The contractor shall establish and implement methods of making sure all keys issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the government.

a. The contractor shall immediately report to the COR or Program Manager any occurrences of lost or duplicated keys.

b. In the event keys, other than master keys, are lost or duplicated, the contractor may be required, upon written direction of the contracting officer, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-0005 payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the government and the total cost deducted from the monthly payment due the contractor.

c. The contractor shall prohibit the use of keys, issued by the government, by any persons other than the contractor's employees and the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in performance of contract work requirements in those areas.

4.10.12. Photography Restrictions: No one is authorized to take any pictures or video recordings of Air Force operational aircraft or restricted areas without the approval of 20 FW/CVN regardless of location while on Shaw AFB.

This includes, but is not limited to, photographs taken from personal electronic devices such as blackberries, iPADs, iPODs, cell phones, or any other devices with digital recording capabilities.

a. Any Contractor requiring pictures or videotape of Shaw's airfield to support their contract must request and possess written authorization prior entering the airfield area.

b. Written authorization letters to photograph or video of the flight line must be signed by one of the following: 20 Maintenance Group Commander or Deputy; Aircraft Maintenance Squadron

Commander; a Fighter Squadron Top 3, Director of Operations, or Commander; 20 Operations

Group Commander or Deputy; 20 Operations Support Squadron Commander or Director of

Operations; or 20 FW/CVN.

4.10.13. CONTRACT MANPOWER REPORTING. The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor is required to completely fill in all required data fields at the Air Force CMRA link https://afcmra.hqda.pentagon.mil/Login.aspx.

Reporting inputs will be for the labor executed during the period of performance for each

Government Fiscal Year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

5.0. APPENDICES.

A. EQUIPMENT BY LOCATION LIST

B. CONNECTION REQUIREMENTS

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-

Appendix A

Equipment by Location List:

Appliance Locations and Quantities

Building # and Designation Washer

Amounts

Dryer

Amounts Combo Unit

Amounts

402 - Dormitory 6 6 0

406 - Dormitory 6 6 0

407 – Dormitory(delay install 1 year renovation) 6 6 0

418 – Dormitory(delay install 1 year renovation) 6 6 0

419 - Dormitory 36 36 0

421 -Dormitory 36 36 0

708 - Fire Station 0 0 2

3338- Fire Station Substation 1 1 0

905 - Dormitory 10 10 5

904- Dormitory 13 13 0

903- Dormitory 14 14 0

1981 - EOD Flight 1 1 0

932- TLF 4 4 0

934- TLF 4 4 0

928- TLF 2 2 0

927- TLF 3 3 0

924- TLF 3 3 0

Total 151 151 7

Area Maps will be provided by 20 CES

Lease and Maintenance of Washers and Dryers PWS Solicitation Number FA4803-18-R-

APPENDIX B

Connection Requirements

Dorm 402 – 3 prong plugs, 2 washers and 2 dryers on the 1st, 2nd, 3rd floor

Dorm 406 – 3 prong plugs, 2 washers and 2 dryers on the 1st, 2nd, 3rd floor

Dorm 407 – 3 prong plugs, 6 washers and 6 dryers all on 1st floor

Dorm 418 – 3 prong plugs, 2 washers and 2 dryers on the 1st, 2nd, 3rd floor

Dorm 419 – 4 prong plugs, 12 washers and 12 dryers on the 1st, 2nd, 3rd floor

Dorm 421 – 4 prong plugs, 12 washers and 12 dryers on the 1st, 2nd, 3rd floor

Dorm 904 – 4 prong plugs, 4 washers and 4 dryers on 1st and 3rd floors, 5 washers and 5 dryers on 2nd floor

Dorm 905 – 4 prong plugs, 3 washers and 3 dryers on 1st floor, 4 washers and 4 dryers on 2nd and 3rd floors. 1 combo unit 1st floor, 2 combo units on 2nd floor, 2 combo units on 3rd floor.

Dorm 903 – currently under renovation, scheduled to open May 2013.

4 prong plugs, 4 washers and 4 dryers on 1st and 3rd floors, 5 washers and 5 dryers on 2nd floor

Bldg. 704 Fire Dept. – 3 prong plugs, 2 washer and 2 dryer on the 2nd Floor

For the Temporary Lodging Facilities (TLF)

Bldg. 3338- 3 prong plugs, 1 washer and 1 dryer on the 1st floor

Bldg. 932 – 3 prong plugs, 4 washers and 4 dryers on the 1st Floor

Bldg. 934 – 3 prong plugs, 4 washers and 4 dryers on the 1st Floor

Bldg. 928 – 3 prong plugs, 2 washers and 2 dryers on the 1st Floor

Bldg. 927 – 3 prong plugs, 1 washer and 1 dryer on the first floor, and 2 washers and 2 dryers on the 2nd floor.

Bldg. 924 – 3 prong plugs, 1 washer and 1 dryer on the first floor, and 2 washers and 2 dryers on the 2nd floor.

Bldg. 1981- 3 prong plug, 1 washer and 1 dryer on the first floor

File details come from the government source that posted it.