FA4803-18-R-0004_Amendment_0001.pdf

PDF 34 KB Posted

Attached to
Operation and Maintenance of Waste Water Treatment Plant and Waste Water Disposal
Solicitation number
FA4803-18-R-0004
Issued by

About this file

FA4803-18-R-0004 Amendment 0001

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SEE SUMMARY OF CHANGES.

1. The purpose of this amendment (number 0001) is to change or update the follow ing:

a. Change the due date and time (block number 8 of the Standard Form 1449) to 15 June 2018 at 2:00 PM EST.

b. Change the Estimated Quantity w ithin the description for CLINs 0006, 1006, 2006, 3006, and 4006.

c. Incorporate a revised (Revision 1) Performance Work Statement (PWS) dated 4 June 2018 as attachment 1.

d. Incorporate the Questions and Answ ers Memo dated 31 May 2018 as attachment 6.

e. Incorporate Wateree Recreation Wastew ater Treatment Draw ings, Project SHA 89-5003 dated Nov. 1990 as attachment 7.

f. Incorporate Wastew ater Treatment Plant Data and Photograph spreadsheets as attachment 8.

g. Incorporate Site Visit Sign-in sheets as attachment 9.

Note: All offerors are reminded that all amendments to this solicitation must be signed and submitted w ith your proposal.

All Other Terms and Conditions Remain Unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA480318R0004

X 9B. DATED (SEE ITEM 11)

08-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Jun-2018

CODE

20TH CONTRACTING SQUADRON/PKA (FA4803)

321 CULLEN STREET

SHAW AFB SC 29152

FA4803 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA480318R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 07-Jun-2018 02:00 PM to 15-Jun-2018 02:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0006

The CLIN extended description has changed from:

Pump and Haul - The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS.

The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED QUANTITY of 850,00 gallons) POP: 12 Months

To:

Pump and Haul - The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS.

The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED QUANTITY of 850,000 gallons) POP: 12 Months

CLIN 1006

Pump and Haul - The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS.

The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED

Pump and Haul - The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS.

The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED

CLIN 2006

Pump and Haul - The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS.

The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED

Pump and Haul - The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS.

The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED

CLIN 3006

Pump and Haul - The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS.

The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED

Pump and Haul - The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS.

The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED

CLIN 4006

Pump and Haul from Wateree Rec Area- The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS. The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED QUANTITY of 850,00 gallons) POP: 12 Months

Pump and Haul from Wateree Rec Area- The contractor shall provide all labor, supervision, equipment, supplies, materials, transportation and other materials necessary to complete the Pump and Haul Waste Water Service in accordance with the PWS. The contractor shall invoice, on a monthly basis, for the quantity of waste water removed from Wateree Recreational Area and properly disposed at a waste water treatment facility in accordance with the PWS. (ESTIMATED QUANTITY of 850,000 gallons) POP: 12 Months

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Performance Work

Statement

20 06-APR-2018

Attachment 2 Wage Determinations 2015-4439 Revision 5

11 10-JAN-2018

Attachment 3 Quality Assurance Surveillance Plan

20 21-FEB-2018

Attachment 4 Past Performance Questionnaire

Attachment 5 Notification of Compliance with Contract Insurance Requireme to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Performance Work

Statement (Rev 1)

20 04-JUN-2018

Attachment 2 Wage Determinations 2015-4439 Revision 5

11 10-JAN-2018

Attachment 3 Quality Assurance Surveillance Plan

20 21-FEB-2018

Attachment 4 Past Performance Questionnaire

Attachment 5 Notification of Compliance with Contract Insurance Requireme

Attachment 6 Questions and Answers Memo

10 31-MAY-2018

Attachment 7 Wateree Recreation Wastewater Treatment drawings

7 01-NOV-1990

Attachment 8 Wastewater Treatment Plant Data and Photographs

Attachment 9 Site Visit Sign-in sheets 2

(End of Summary of Changes)

File details come from the government source that posted it.